Bids Are Invited For Pipesmild Steel Pipes And Accessories - Mild Steel Pipes Confirming To Is:1239 Part – I Class – C, Heavy Duty With Double Coat Corrosion Protection Zinc Coating Paint On The Pipe Line.Size 80 Nb ( As Per Nbc ) , Gun Metal 2 Way Fire Brigade - Gun Metal 2 Way Fire Brigade Inlet Heavy Dutysize 63Mm ( As Per Nbc ) , Fire Pump - Fire Pump For3 Phaseset Suitable For 450 Lpm @ 13.5 Mtr. To 32 Mtr. Head Suitable For Delivery Pipe Cat.Ii With Fitting Charges. ( As Per Nbc ) . , Panel - Heavy Duty Pump Starter , Electrical Wiring Of Pump & Panel , Connectionwith Labour Charges, All Types Of Cables And Provide Shade For Protection From Weather ( As Per Nbc ) , Hose Reel 30 Meter And Accessories - Hose Reel 30 Meter Supply, Fixing, Testing & Commissioning Of 20 Mm Bore And 30 Meter Long Hose ( High Pressure Rubber Braided Hose Pipe As Per Is:444 ) And Hose Reel Suitable For 10 Kg / Sqcm Operating Pressure For First Aid Fire Fighting Conforming To Is:884, With 180 Deg Full Swing Drum, Fixing Brackets, 5Mm Dia Shut Off Stainless Steel Nozzle, Connecting Directly From The Riser Through 40Mm Dia. Ms ( Class B ) Pipe With Sockets, Elbows, Nipples, 40X20 Mm Reducer, 20 Dia Pipe, 20 Mm Dia Hand Lever Operated Isolating Ball Valve Etc., Including Providing Operating Instructions Near Hose Reel. The System Shall Be Complete In All Respects As Per Drawings And Directions Of Engineer-In-Charge ( As Per Nbc ) , Pvc Water Tank Withaccessories - 5000 Ltr. Three Layer Pvc Water Tank Providing Erecting And Fixing Pvc Water Tank Of Required Capacity For Fire Fighting System. Complete The Item With All Fittings And Connections From Water Supply Pipe To Tank And Tank To Fire Pump Etc., Complete On Terrace As Per Instruction ( As Per Nbc ) , All Assessories Required For Installation, Fixing And Commission Of Hose Reel And Fire Pump System - Fixing And Commission Of Hose Reel And Fire Pump System ( Aceessories Like Elbow, Core Cutting Switch, Cables, All Types Of Valves, Nrv, Reducers , Heavy Duty Ms Flange, Heavy Duty Cast Iron Butterfly Valve , Heavy Duty Brass Air Release Valve, Heavy Duty Pvc Flange Washer, Heavy Duty U Clamp With Double Nut & Washer, Heavy Duty Pressure Guage, Pressure Switch , Heavy Duty Brass Ball Valve, All Type Of Plumbing Accessories Etc. ) ( As Per Nbc Norms ) , Installation And Commissioning Charges Of Total Fire System - Erection & Commissioning As Per Nbc With Electrical Wiring Connection, Foundation, Civil Workwith Require Materialsand Labour Charges For 1 ) Fire Pump 2 ) Electrical Pannel 3 ) M.S.Pipe Fitting Including Flanges, Cutting, Bewelling Welding, Brnding, Threading, Painting With Red Oxide And Red Anemel4 ) Hose Reel And Hose Assembly 5 ) Plumbing Work 7 ) Upvc Pipe Connection Etc.Installation Work With Hydrotest And Painting And Sign Board Work Total Quantity : 1