}

Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing At Cpcls Cbr, Nagapattinam , Dismantling Cc / Rcc Work By Mechanical Means And Stockpiling At Designated Locations And Disposal, CPCL-CBR, Nagapattinam-Tamil Nadu

Boards / Undertakings / PSU has published Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing At Cpcls Cbr, Nagapattinam , Dismantling Cc / Rcc Work By Mechanical Means And Stockpiling At Designated Locations And Disposal. Submission Date for this Tender is 21-12-2021. Coats and Jackets Tenders in CPCL-CBR, Nagapattinam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

30193481
Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing At Cpcls Cbr, Nagapattinam , Dismantling Cc / Rcc Work By Mechanical Means And Stockpiling At Designated Locations And Disposal
Open Tender
Indian
Tamil Nadu
Cpcl-Cbr, Nagapattinam
21-12-2021

Tender Details

Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing Barricading Of Crude Storage Tanks By Pvc Barbed Wire Fencing At Cpcls Cbr, Nagapattinam , Dismantling Cc / Rcc Work By Mechanical Means And Stockpiling At Designated Locations And Disposal Of Dismantled Materials Upto A Lead 100 M, Stacking Serviceable Materials Separately Including Cutting Reinforcement Bars, Scaffolding Breaking Into Pieces All Labor, Tools Supervision Safety Permits, Safety Precaution Etc. Complete. , Demolishing Plain Cement Concrete In Foundation And Super Structure Including Disposal Of Unserviceable Material Upto A Initial Lead Of 100M As Directed Serviceable Materials To Stores Including Scaffolding, All Labor, Tools Supervision, Safety Permits, Safety Precaution Etc. Complete. , Demolishing Of Brick Work Of Any Mortar In Foundations Or At Super Structures Including Disposal Of Unserviceable Materials Upto A Initial Lead Of 100M Within The Refinery Premises As Directed Andincluding Breaking Into Pieces, All Labor, Tools, Etc. Complete. , Demolishing Rubble Or Coursed Rubble Masonry In Lime Or Cement Mortar In Foundations Or At Super Structures And Disposal Of The Same Upto A Initial Lead Of 100M Within The Refinery Premises As Directed By The Eic , Breaking Of Bituminous Road Including Bituminous Carpet, Metal Base, Soling Etc. Including Removing Debris Upto A Initial Lead Of 100M Within The Refinery Premisesas Per Instruction Of Engineer In Charge , Dismantling Pipe Lines Of Upto 6 Inch Dia Including Gi, Pvc, Cpvc, Cast Iron, Stone Ware Etc. Including Of All Tools And Tackles And Disposal To Scrap Yard , Dismantling & Removal Of Structurals / Gratings But Hot Or Cold Cutting At All Levels And Disposal At Scrap Yard Including Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Suitable Slings / Belts, Etc., Machineries, All Consumables And Labor To Complete The Job In All Respects, Transportation Of Unused Materials To Owners Storage Point And Dumping The Old Vessel / Generated Scrap Material To The Designated Place As Per Eic Instructions , Earthwork In Excavationinall Types Of Soil , Includingsoft Or Hard Murrum, But Excluding Soft And Hard Rock, Using Mechanical Means ( Hydraulic Excavators ) / Manually For Depth Upto 1.5M, Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated / Sub-Soil Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 100M, As Directed Including Providing Temporary Supports To Existing Service Lines Like Water Pipes, Sewage Pipes, Electricunderground Cables, Etc.All Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Providing And Filling Fine Aggregate ( M-Sand ) Of Approved Quality In Floor, Foundation Etc. In Layer Of 15 Cm Thickness Including, Watering, Ramming, Consolidating Etc. Complete. , Back Filling The Available Excavated Earth In Plinth, Trenches, Sides Of Foundations In Depressed Areas In Layers Not Exceeding 20 Cm Depth Consolidating Each Layer By Ramming And Watering Upto 50 Mt Lead And Lift Upto 1.5 Mt , Providing And Laying Plain Cement Concrete 1:2:4 ( 1 Part Of Cement : 2 Part Of Fine Aggregate ( M Sand ) And 4 Part Of Stone Aggregate 20Mm Nominal Size ) In Foundation Below Footing Floor And Raft And Trenches Using Stone Aggregate Including Watering, Curing Ramming With Vibrator If Necessary All Labor And Material Complete As Per Direction Of Engineer In Charge But Excluding Cost Of Form Work. Rate Includes Supply Of Opc 53 Grade Cement. , Providing And Laying Reinforced Cement Concrete1:1.5:3 ( 1 Part Of Cement, 1.5 Part Offine Aggregate And 3 Part Of Stone Aggregate 20 Mm And Down ) In Foundation Below Footing Floor And Raft And Trenches Using Stone Aggregate Including Watering, Curing Ramming With Vibrator If Necessary All Labor And Material Complete As Per Direction Of Engineer In Charge. Including Cost Of Form Work. Using Opc 53 Grade / Sulphate Resisting Portland Cement Grade Of Approved Make Conforming To Is. Rate Includes Supply Of Opc 53 Grade Cement. , Supplying And Placing In Position High Strength Deformed Steel Bars Reinforcement ( Conforming To Is:1786, Grade Fe500 ) , For Rcc Work, Pile, Including Transporting The Steel, Straightening, Cleaning, Decoiling. Cutting, Bending To Required Shapes And Lengths As Per Details, Binding With Contractors Own 16 Swg Black Soft Annealed Binding Wire At Every Intersection, Supplying And Placing With Proper Cover Blocks, Supports, Chairs, Overlaps, Welding, Spacers, Fan Hooks, Scaffolding, Etc. For All Heights And Depths, Etc., All Complete As Per Specifications And Directions Of Engineer-In-Charge. , Providing Fixing Form Work Including Centering, Shuttering And Strutting And Propping So As To Give A Rough Finish For In-Situ R.F Cement Concrete And / Or Plain Cement Concrete Work In Foundation And Plinth Like Footing, Raft, Basis Of Column, Pipe Supports, Equipment Foundations, Mass Concrete, Circular Shape Etc. For All Depths And Heights Including Removal Of Shuttering After The Specified Period Is Over And As Directed By The Engineer In Charge. Complete With All Materials Labors Consumable Etc. ( Form Work Shall Be Supplied By The Contractor And Shall Remain The Property Of The Contractor ) , Supplying, Fabricating, Fixing Andkeeping In Position At All Levelsand Locations Threaded Anchor Bolts Of All Diameters And Nomenclature Including Nuts, Washers, Anchor Plates, Pipe Sleeves Etc. In Foundations, Columns, Pedestals, Slabs, Beams, Walls Etc. Or Any Other Place As Directed Including Handling & Transporting, Straightening If Required, Turning From Relevant Size M.S Rounds To Requireddiameter, Threading, Welding, Providing Necessary Templates And Auxiliary Dummy Structures, If Any, Necessary Tying And Welding With Reinforcement, Adjustment Of Shuttering & Reinforcement / Any Other Fixture, Greasing Exposed Metal Surfaces, Covering Bolts And Packing The Sleeves With Jute Cloth Etc. All Complete As Specified And Directed ( Supply Of All Materials In Contractors Scope ) . , Transporting And Disposing The Surplus Earth / Debris Generated After Backfilling From Construction Activities, Loading, Unloading, As Directed To Designated Place Within Refinery Premises Upto A Lead Of 3 Kms. , Supplying, Transporting, Storing, Fabricating & Erecting In Position Bolted And / Or Welded Structural Steel Works Like Angles , Channels, Beams, Plates, Pipes, Tubes Etc.At All Heights & Levels And Locations Including All Built-Up Sections / Compound Sections Made Out Of Rolled Sections And / Or Plates / Bent Plates In Existing / New Structural Pipe Supports, Frames, Etc., Cutting To Required Size, Straightening / Bending If Required, Edge Preparation, Cleaning, Scrapping & Welding Of Unsound Joints In Existing Structural Members, Preheating, ( Including Sealing Of Box Section With Continuous Welding ) Finishing Edges By Grinding , Fixing In Line And Level With Temporary Bracings, Including Providing Staging, Scaffoldings, & Working Platforms At All Heights, And Removal Of Same After Erection, Including Preparing The Surface For Painting , Surface Cleaning, Wire Brushing, Removal Of Mill Scale, Dust, Rust, Oil Or Grease Etc. Complete Along With Providing Paint System As Follows: ( A ) Applying Inorganic Zinc Silicate Coat 50 Micron Dft ( B ) Two Coats Of Epoxy Primer Paint 50 Micron Dft Each ( C ) Two Coats Of Anti Rust Epoxy Top Coat Paint 75 Micron Dft Each As Per Manufacturers Specifications And As Directed By Engineer-In-Charge. Note:-One Coat Of Zinc Silicate And One Coat Of Epoxy Primer Shall Be Applied On Structural Steel Surfaces After Manual Cleaning Prior To Erection As Per Specifications & As Directed By Engineer-In-Charge. Supply Of All Materials In Contractors Scope. , Supplying And Fixing Pvc Coated Gi Barbed Wire Of Outer Dia3 Mmweighing 9.38 Kg Per 100M ( Minimum ) , Between The Two Posts Fitted And Fixed With G.I. Staples, Turn Buckles Etc. In All Heights Complete. Payment To Be Made Per Meter Cost Of Total Length Of Barbed Wire Used. , Fabricating & Erecting In Position Bolted And / Or Welded Structural Steel Works Like Angles , Channels, Beams, Plates, Pipes, Tubes Etc.At All Heights & Levels And Locations Including All Built-Up Sections / Compound Sections Made Out Of Rolled Sections And / Or Plates / Bent Plates In Existing / New Structural Pipe Supports, Frames, Etc., Cutting To Required Size, Straightening / Bending If Required, Edge Preparation, Cleaning, Scrapping & Welding Of Unsound Joints In Existing Structural Members, Preheating, ( Including Sealing Of Box Section With Continuous Welding ) Finishing Edges By Grinding , Fixing In Line And Level With Temporary Bracings, Including Providing Staging, Scaffoldings, & Working Platforms At All Heights, And Removal Of Same After Erection, Including Preparing The Surface For Painting , Surface Cleaning, Wire Brushing, Removal Of Mill Scale, Dust, Rust, Oil Or Grease Etc. Complete Along With Providing Paint System As Follows: ( A ) Applying Inorganic Zinc Silicate Coat 50 Micron Dft ( B ) Two Coats Of Epoxy Primer Paint 50 Micron Dft Each ( C ) Two Coats Of Anti Rust Epoxy Top Coat Paint 75 Micron Dft Each As Per Manufacturers Specifications And As Directed By Engineer-In-Charge. Note:-One Coat Of Zinc Silicate And One Coat Of Epoxy Primer Shall Be Applied On Structural Steel Surfaces After Manual Cleaning Prior To Erection As Per Specifications & As Directed By Engineer-In-Charge. Cpcl Will Supply Structural Steel Members Like Angle, Channel, Beam, Plate, Tubes, Etc. At Free Of Cost At Cpcl Stores And Contractor Has To Arrange For Collection & Transportation Of The Same To Site. Supply Of All Other Materials Except Structural Steel Members In Contractors Scope. Structural Steel / Pipes Will Be Provided From Cpcl Scrap Yard / Any Other Location And Contractor Has To Make Necessary Arrangements For Shifting To Job Location At No Additional Cost => Limited

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail