Owc Machine Owc Machine , Owc - Processing Unit ( Owc 130 - 500 Kg Per Day ) , Composting Machine ( Organic Waste Converter ) Owc Capacity : 50 Kg Per Batchpower Connection:8 Hp ( Main Motor & Chopper Motor ) Brim Capacity :130 Lit. , Np Arki-Himachal Pradesh
TDR : 30171360
Tender Notice
BOQ
Expired
Np Arki
Himachal Pradesh
Owc Machine Owc Machine , Owc - Processing Unit ( Owc 130 - 500 Kg Per Day ) , Composting Machine ( Organic Waste Converter ) Owc Capacity : 50 Kg Per Batchpower Connection:8 Hp ( Main Motor & Chopper Motor ) Brim Capacity :130 Lit.
Name of Work: Engineering, Procurement, Construction (EPC), O&M of the proposed Organic Waste Converter of 500 kg per day capacity at ward No.3 N.P.Arki
Sl. No.
Item Description
1
OWC - PROCESSING UNIT (OWC 130 - 500 kg per day)
2
Composting Machine (Organic Waste Converter) OWC Capacity : 50 Kg per batchPower Connection:8 HP (Main Motor & Chopper Motor)Brim Capacity :130 Lit.Waste Batch size:50 Kg.Batch Duration:15 min.Material of Construction (MOC):All contact parts of SS-304.MOC of Outer Cover :MS Powder CoatedTrolley :One No. of MS Powder Coated
3
Double curing system :Capacity: 200 Kg of Organic Waste per day.1. 100 Nos. of HDPE crates of size 54x36x26 cm, laminated with aerating net.2. One number of four shelf folding storage rack of size 365x120x255 cm.3. 4 Nos. of Leachate collection tray of G.I. of size 150x55x7 cm.4. Double Fogger: Moisture control fogging system consisting of 140 foggers, Disc Filter, Ball Valve, 1 No of Laxmi Make Pump, Time Control unit for spray and frequency control, One number of pressure gauge, and other accessories like piping, valves etc.
4
Shredder Capacity 300 KG/ hr, 15 hp
5
Conveyor Belt0.6m x 3.5 m. length
6
Segregation Table2.5 x 1.2 x 1.5 m, moc ss304
7
Manure Handling Trolley Capacity - 150 kgs
8
Weigh MachineCapacity : 1000 Kg
9
ELECTRICAL WORKS
10
Control Panels With spares of standard make of Siemens or L&T/Philips/Bajaj or equivalent.
11
Wiring and distribution Cabling, Distribution Box & Starters & Switches, lighting of standard make
12
COMMISSIONING CHARGES
13
TRANSPORTATION CHARGES
14
Annual Operation and Maintenance Cost (Year starts from the date of commissioning the oeprations)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.