}

Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year Arc - Group A Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year A, NOIDA-Uttar Pradesh

Boards / Undertakings / PSU has published Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year Arc - Group A Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year A. Submission Date for this Tender is 05-02-2022. Gas Engines Tenders in NOIDA Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

30138067
Corrigendum : Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year Arc - Group A Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year A
Open Tender
Indian
Uttar Pradesh
Noida
05-02-2022

Tender Details

Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year Arc - Group A Procurement Of 1200 Scmh Gas Engine Driven, Electric Motor Driven 1200 Scmh And 600 Scmh Cng Compressor Package 2 Year Arc - Group A , Group-A:1200 Scmh Gas Engine Driven Cng Compressor , Design, Engineering, Manufacturing, Inspection, Testing, Supply ( Including Packaging, Forwarding, Handling ) , Loading At Port ( For Foreign Bidder ) And Loading At Factory / Store, Unloading At Purchaser’S Store / Site ( For Indian Bidder ) Of Skid Mounted Gas Engine Driven 1200 Scmh Cng Compressor Package With Explosion Proof Electric & Control Panel Having Suction Pressure Of 16 Kg / Cm2 ( G ) , Inlet Line Pressure Range Of 16 – 49 Kg / Cm2 ( G ) ( Performance Range 16 To 19 Kg / Cm2 ( G ) With Discharge Pressure 255 Kg / Cm2 ( G ) With 9 Bank Priority Panel .The Package Shall Be Inclusive Of: A ) String Test Of Complete Compressor Package Along With Gas Engine And Accessories At Packagers Factory. B ) Special Tools & Tackles Required For Erection And Commissioning ( List Of Tools & Tackles To Be Furnished By The Bidder ) C ) Design, Engineering, Manufacturing, Supply Including Packaging And Forwarding, Insurance, Custom Clearance, Handling, Loading And Unloading At Port And Delivery & Unloading At Clients Store / Site Of Air Compressor Of Capacity 7.5 Kw, Discharge Pressure Approx. 16 Kg / Cm2g, 1000 Water Litre Capacity Air Receiver For Instrumentation Air With Prv, Air Dryer Along With All Accessories And Auxiliaries. The Compressor Packages Are To Be Supplied & Installed At Various Gas, Mentioned Below States , Authorized To Iocl. Note: Foreign Bidders To Consider Designated ‘Port Of Entry’ In India As: I ) Nhava Sheva Port, In Maharastra, India For Various Gas In Madhya Pradesh State, Andhra Pradesh, Telangana & Tamil Nadu States Ii ) Kolkata Port In West Bengal, India For Various Gas In Bihar & Jharkhand States. , Transportation To Any Of The Following Locations: 1 ) Bokaro, Hazaribagh & Ramgarh Districts 2 ) Jagtial, Peddapalle, Karimnagar & Rajanna Sircilla Districts 3 ) Rewa District 4 ) Guna District 5 ) Aurangabad, Kaimur And Rohtas Districts 6 ) Coimbatore District 7 ) Salem District 8 ) Srikakulam, Vishakapatnam, Vizianagaram Districts 9 ) Muzaffarpur, Vaishali, Saran, Samastipur Districts 10 ) Arwal, Jehanabad, Bhojpur And Buxar Districts 11 ) Araria, Purnia, Katihar And Kishanganj Districts 12 ) Lakhisarai, Munger And Bhagalpur Districts 13 ) Sheikhpura, Jamui And Deoghar Districts 14 ) Ashoknagar District 15 ) Khagaria, Saharsa And Madhepura Districts 16 ) Nawada And Koderma Districts 17 ) Morena District18 ) Any Other Ga Of Iocl ( 11Th Round ) Not To Be Quoted By Foreign Bidder , Lcv Trailer Panels Lcv Trailer Panel Complete With Mass Flow Meter ( With Internal Local Display ) Based On Coriolis Principle Of Micro Motion, Usa ( Model Cng 50 With 2700 Transmitter, Cabling, Suitable For Hazardous Area Classification. Panel Shall Be Weather Proof. Sheet Metal Work Shall Be Ss 304. Lcv Trailer Panel Shall Be Mounted / Installed Near Lcv Stand. Purchaser Shall Arrange Ss316 Tubing From Compressor To Trailer Panel And From Trailer Panel To Lcv Filling Point With Hose And Fittings. Hose & Fittings Shall Be In Bidder’S Scope. Hose Shall Be 5 Feet In Length Along With Breakaway Coupling & Fitting ( Quick Connector Coupler & Stem ) Should Have Provision Of Nrv. Distribution Of Lcv Panels Shall Be Intimated At The Time Of Dispatch. , Freight For Lcv Trailer Panels Not To Be Quoted By Foreign Bidder , Installation, Commissioning & Field Performance Test Of Compressor Package Including Air Compressor System At Site. , Items For Operation & Comprehensive Maintenance , Operation Charges For 1St Year I.E. Duringwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Rates Taken Against Operation Charges Shall Be Based On 3 Shifts Per Day, With Each Shift Of 8 Hours And Payment Shall Be Done On Pro-Rata Basis Based On Actual No. Of Shifts Per Day. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 5.75% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Operation Charges For 2Nd Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Rates Taken Against Operation Charges Shall Be Based On 3 Shifts Per Day, With Each Shift Of 8 Hours And Payment Shall Be Done On Pro-Rata Basis Based On Actual No. Of Shifts Per Day. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 6.2% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Operation Charges For 3Rd Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Rates Taken Against Operation Charges Shall Be Based On 3 Shifts Per Day, With Each Shift Of 8 Hours And Payment Shall Be Done On Pro-Rata Basis Based On Actual No. Of Shifts Per Day. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 6.8% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Operation Charges For 4Th Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Rates Taken Against Operation Charges Shall Be Based On 3 Shifts Per Day, With Each Shift Of 8 Hours And Payment Shall Be Done On Pro-Rata Basis Based On Actual No. Of Shifts Per Day. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 9.0% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months =780 , Operation Charges For 5Th Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Rates Taken Against Operation Charges Shall Be Based On 3 Shifts Per Day, With Each Shift Of 8 Hours And Payment Shall Be Done On Pro-Rata Basis Based On Actual No. Of Shifts Per Day. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 10.5% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Comprehensive Maintenance Charges For 1St Year I.E. Duringwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 5.75% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Comprehensive Maintenancecharges For 2Nd Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 6.2% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Comprehensive Maintenance Charges For 3Rd Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 6.8% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Comprehensive Maintenance Charges For 4Th Year I.E. Afterwarranty Period ( 65 Compressor X 12 Months ) In Three Shifts Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 9.0% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Comprehensive Maintenance Charges For 5Th Year I.E. After Warranty Period ( 65 Compressors X 12 Months ) In Three Shifts. Bidder’S Quoted Price Shall Be Arrived By Adding Minimum Fixed Charges ( 10.5% Of Landed Cost Quoted By The Bidder ) & Additional Amount Based On Rate Quoted By The Bidder ( In Terms Of Percentage Of Landed Cost ) . Bidder To Check Thier Final Rate ( As % Of Landed Cost ) In Column No. 28 And Final Amount In Column No. 53 For 65 Compressors X 12 Months = 780 , Financial Loading Against Package Gas Loss In Percentage ( % ) All Bidders To Select Inr Currency In This Row / Item , Financial Loading Against Gas Consumption Bidder To Quote Package Gas Consumption Rate In Scmh Per Hour Over And Above 40 Scmh Per Hour All Bidders To Select Inr Currency In This Row / Item

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-02-2022 CORRIGENDUM 7 Other 05-02-2022
2 03-02-2022 CORRIGENDUM 8 Date 10-02-2022
3 07-01-2022 CORRIGENDUM 4 Date 13-01-2022
4 07-01-2022 CORRIGENDUM 4 Other 13-01-2022
5 14-01-2022 CORRIGENDUNM 5 Date 25-01-2022
6 21-12-2021 CORRIGENDUM 1 Technical Bid 30-12-2021
7 27-01-2022 CORRIGENDUM 6 Date 05-02-2022
8 31-12-2021 CORRIGENDUM 3 Technical Bid 06-01-2022
9 31-12-2021 CORRIGENDUM 2 Date 06-01-2022

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail