Power Government Departments Closing in 0 days TDR #30122402

Tender For Different Mechanical Works Of Chep-I, Ii, Iii And Bhaderwah Hep As Per Detailed Scope Of Works In Sbd ) As Per Sbd- 1 Routine repair and maintenance of 10 No. manually operated hydro mechanical gates including drain valves of differ

Issued by Government Departments · Laddan, Jammu And Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Dec 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Laddan → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Different Mechanical Works Of Chep-I, Ii, Iii And Bhaderwah Hep As Per Detailed Scope Of Works In Sbd ) As Per Sbd- 1 Routine repair and maintenance of 10 No. manually operated hydro mechanical gates including drain valves of different diameter, air release valves, sluice valves etc. of CHEP- I by way ofcomplete dismantling of winch machine / screw hoist which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. and then replacement of damaged parts if any. Re-assembling of all the parts and applying fresh coat of grease to all the parts of winch machine. Oiling to rollers which includes shaft, lock pin, roller, etc. Tighteningof nuts and bolts of seals and guide hoisting including removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease, cleaning of sill beam etc. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job also includes cleaning, reconditioning of drain valves, air release valves, sluice valves etc. by greasing / oiling and replacement of damaged parts if any. The job includes cost of materials, T& P items and labour engaged for the execution of job. Complete Job. 2 Routine repair and maintenance of 5 No. tail race gates & 1 No. escape gate of CHEP- I by way ofcomplete dismantling of winch machine / screw hoist which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. and then replacement of damaged parts if any. Re-assembling of all the parts and applying fresh coat of grease to all the parts of winch machine. Oiling to rollers which includes shaft, lock pin, roller, etc. Tighteningof nuts and bolts of seals and guide hoisting including removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease, cleaning of sill beam etc. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items and labour engaged for the execution of job 3 Routine repair and maintenance of 06 No. manually as well as electrically operated hydro mechanical regulatory gates installed at headwork of CHEP- I by way ofreconditioning of rope drum, gear boxes, steel wire ropes, shafts, pins etc. bycleaning of all parts by using petrol/ kerosene oil,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts including gears properly. Oiling to rollers which includes shaft, lock pin, roller, applying of cadmium compound / grease to steel wire ropes etc. Checking the manual & electrical operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items, inspection of panels and labour engaged for the execution of job.(Complete Job). 4 Routine maintenance of penstock no. 1 of CHEP-I byway of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream side of CHEP-I by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole& expansion joints of penstock by way of cleaning of old grease with the help of kerosene oil cotton/dhoti cloth to make them rust free,proper torqueing of all the studs, nuts & bolts with the help of torque wrench, applying fresh coat of grease to all studs, nuts &bolts includingplugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines.. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 5 Routine maintenance of penstock no. 2 of CHEP-I byway of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream side of CHEP-I by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole& expansion joints of penstock by way of cleaning of old grease with the help of kerosene oil cotton/dhoti cloth to make them rust free,proper torqueing of all the studs, nuts & bolts with the help of torque wrench, applying fresh coat of grease to all studs, nuts &bolts includingplugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines.. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 6 Cleaning of 8 mo. trash racks installed at different locations on monthly basis as mentioned below and disposal of dead animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. 7 Routine Repair and maintenance of 02 no. Electrically and 05 no. manually operated gates of CHEP-II by way of complete cleaning of all parts by using petrol ,dhoti cloth, brush etc. after complete dismantling. Applying fresh coat of grease to all the parts of gate and then assemble it properly to both electrically. Oiling to chain sprocket arrangement and rollers which includes shaft, lock pin, roller, etc. Replacement of gear oil in reduction gearbox. Removal of old cadmium compound / grease from the steel wire rope, cleaning it properly andthen applying fresh coat of cadmium compound. Cleaning of sill beam. Replacement of damaged/burnt out contractors switches, fuses, indicators etc. The job also includes complete dismantling of winch machine of manually operated gates which include pinion, gear, gun metal bushes, etc. and cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine of the manually operated gates and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease. cleaning of sill beam. Checking the manual as well as electric operationof the gates by lifting and lowering it 2-3 times. The job includes cost of material, T&P items and labour engaged for the the execution of job. Complete job.by head load and labour charges. Complete job. 8 Repair and maintenance of penstock of CHEP-II by way of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream of CHEP-II by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manholeof penstock by way of cleaning of old grease with the help of cotton/dhoti cloth. Cleaning and washing of the same with petrol to make them rust free,proper torquing of all the studs, nuts & bolts with the help of torque wrench, applying grease to studs, nuts &bolts, plugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 9 Repair and maintenance of 2 no. drain valves of CHEP-II by way of dismantling and cleaning of parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease, replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting etc. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job 10 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of dead bodies & animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials, animals and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. i. Trash rack at inlet of Forebay of CHEP-II. ii. Trash rack at intake of Penstock of CHEP-II. iii. Trash rack installed at bypass spill over gate. iv. Trash rack installed at inlet to CHEP-II. 11 Routine Repair and maintenance of 07 no. Electrically and 01 no. manually operated gates of CHEP-III by way of Complete cleaning of all parts by using petrol ,dhoti cloth, brush etc. after complete dismantling. Applying fresh coat of grease to all the parts of gate and then assemble it properly to both electrically. Oiling to chain sprocket arrangement and rollers which includes shaft, lock pin, roller, etc. Replacement of gear oil in reduction gearbox. Removal of old cadmium compound / grease from the steel wire rope, cleaning it properly andthen applying fresh coat of cadmium compound. Cleaning of sill beam. Replacement of damaged/burnt out contractors switches, fuses, indicators etc. The job also includes complete dismantling of winch machine of manually operated gates which include pinion, gear, gun metal bushes, etc. and cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine of the manually operated gates and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease. cleaning of sill beam. Checking the manual as well as electric operationof the gates by lifting and lowering it 2-3 times. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job. 2 No. operations in a year. 12 Routine maintenance of penstock of CHEP-III by way of clearing of vegetation/bushes/ boulders/ branches of trees along the length of the penstock from upstream to downstream sideby cutting of vegetation etc. clearing, stacking and their disposal away from the site manually includingclearing of the drains along the both sides of the penstocks. The job also includes reconditioning of the expansion joints of the penstock by way of cleaning of old oil/ grease, rust , dust etc. with the help of kerosene oil/ petrol, dhoti cloth and then plugging of leakages including proper torqueing of the nuts/studs and bolts of the expansion joints and manholesto maintain adequate pressure in the penstockrequired it he power house to run the turbines. The job includes cost of material, T&P items and both skilled and unskilled labour required for the successful execution of job. Complete job 13 Repair and maintenance of 2 no. drain valves at power house of CHEP-III by way of dismantling and cleaning of parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease, replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting etc. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job 14 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of dead animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. i. Trash rack at Headworks of CHEP-III. ii. Trash rack at BR of CHEP-III. 15 Repair and maintenance of 3 No. manually operated gatesinstalled at Bhaderwah HEP by way ofcomplete dismantling of winch machine which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. Replacement of old/damaged nuts and bolts for seals and guide hoisting ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease (MAKE Castrol/servo).cleaning of sill beam. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items and labour engaged for the execution of job.(Complete Job). 16 Repair and maintenance of drain valve at forebay ofBhaderwah HEP by taking it out from their installed positions, dismantling and cleaning of all the parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease (MAKE Castrol/Servo), replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting of the valves in their original positions. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job. 17 Routine repair and maintenance of penstock Bhaderwah HEP by way of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole & expansion joints of penstock by way of cleaning of old grease with the help of cotton/dhoti cloth. Cleaning and washing of the same with petrol to make them rust free, proper torquing of all thenuts of bolts with the help of torque wrench, applying grease to all nuts &bolts, plugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbine including clearing of mulba accumulated at different locations. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled) for the sucessful execution of job.Complete job 18 Dismantling, straightening and then re-installation/ erection of 1no. stem rod of manually operated gate of Bhaderwah HEP by way ofcomplete dismantling of damaged stem rod along with winch machine which include pinion, gear, gun metal bushes, etc. from its installed position then taking it to the workshop for straightening including cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine after the removal and cleaning of old grease from the threaded stem rodandoiling to rollers which includes shaft, lock pin, roller, etc., and then assembling it properly including checking its operation. The job also includes reinstallation of the stem rod along with winch machine to its original position. Replacement of old/damaged nuts and bolts for seals and guide hoisting if required. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items, to & fro carriage charges and labour engaged for the execution of job.(Complete Job). 19 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of deadanimals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. Trash rack at Headworks & Forebay of Bhaderwah HEP

AI Tender Summary

OUR REF NO 30122402
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 21-12-2021
Authority
Authority Name Jammu And Kashmir State Power Development Corporation Limited
Work Description Tender For Different Mechanical Works Of Chep-I, Ii, Iii And Bhaderwah Hep As Per Detailed Scope Of Works In Sbd ) As Per Sbd- 1 Routine repair and maintenance of 10 No. manually operated hydro mechanical gates including drain valves of different diameter, air release valves, sluice valves etc. of CHEP- I by way ofcomplete dismantling of winch machine / screw hoist which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. and then replacement of damaged parts if any. Re-assembling of all the parts and applying fresh coat of grease to all the parts of winch machine. Oiling to rollers which includes shaft, lock pin, roller, etc. Tighteningof nuts and bolts of seals and guide hoisting including removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease, cleaning of sill beam etc. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job also includes cleaning, reconditioning of drain valves, air release valves, sluice valves etc. by greasing / oiling and replacement of damaged parts if any. The job includes cost of materials, T& P items and labour engaged for the execution of job. Complete Job. 2 Routine repair and maintenance of 5 No. tail race gates & 1 No. escape gate of CHEP- I by way ofcomplete dismantling of winch machine / screw hoist which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. and then replacement of damaged parts if any. Re-assembling of all the parts and applying fresh coat of grease to all the parts of winch machine. Oiling to rollers which includes shaft, lock pin, roller, etc. Tighteningof nuts and bolts of seals and guide hoisting including removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease, cleaning of sill beam etc. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items and labour engaged for the execution of job 3 Routine repair and maintenance of 06 No. manually as well as electrically operated hydro mechanical regulatory gates installed at headwork of CHEP- I by way ofreconditioning of rope drum, gear boxes, steel wire ropes, shafts, pins etc. bycleaning of all parts by using petrol/ kerosene oil,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts including gears properly. Oiling to rollers which includes shaft, lock pin, roller, applying of cadmium compound / grease to steel wire ropes etc. Checking the manual & electrical operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items, inspection of panels and labour engaged for the execution of job.(Complete Job). 4 Routine maintenance of penstock no. 1 of CHEP-I byway of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream side of CHEP-I by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole& expansion joints of penstock by way of cleaning of old grease with the help of kerosene oil cotton/dhoti cloth to make them rust free,proper torqueing of all the studs, nuts & bolts with the help of torque wrench, applying fresh coat of grease to all studs, nuts &bolts includingplugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines.. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 5 Routine maintenance of penstock no. 2 of CHEP-I byway of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream side of CHEP-I by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole& expansion joints of penstock by way of cleaning of old grease with the help of kerosene oil cotton/dhoti cloth to make them rust free,proper torqueing of all the studs, nuts & bolts with the help of torque wrench, applying fresh coat of grease to all studs, nuts &bolts includingplugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines.. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 6 Cleaning of 8 mo. trash racks installed at different locations on monthly basis as mentioned below and disposal of dead animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. 7 Routine Repair and maintenance of 02 no. Electrically and 05 no. manually operated gates of CHEP-II by way of complete cleaning of all parts by using petrol ,dhoti cloth, brush etc. after complete dismantling. Applying fresh coat of grease to all the parts of gate and then assemble it properly to both electrically. Oiling to chain sprocket arrangement and rollers which includes shaft, lock pin, roller, etc. Replacement of gear oil in reduction gearbox. Removal of old cadmium compound / grease from the steel wire rope, cleaning it properly andthen applying fresh coat of cadmium compound. Cleaning of sill beam. Replacement of damaged/burnt out contractors switches, fuses, indicators etc. The job also includes complete dismantling of winch machine of manually operated gates which include pinion, gear, gun metal bushes, etc. and cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine of the manually operated gates and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease. cleaning of sill beam. Checking the manual as well as electric operationof the gates by lifting and lowering it 2-3 times. The job includes cost of material, T&P items and labour engaged for the the execution of job. Complete job.by head load and labour charges. Complete job. 8 Repair and maintenance of penstock of CHEP-II by way of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream to downstream of CHEP-II by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manholeof penstock by way of cleaning of old grease with the help of cotton/dhoti cloth. Cleaning and washing of the same with petrol to make them rust free,proper torquing of all the studs, nuts & bolts with the help of torque wrench, applying grease to studs, nuts &bolts, plugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbines. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled), transportation charges for the execution of job.Complete job 9 Repair and maintenance of 2 no. drain valves of CHEP-II by way of dismantling and cleaning of parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease, replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting etc. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job 10 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of dead bodies & animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials, animals and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. i. Trash rack at inlet of Forebay of CHEP-II. ii. Trash rack at intake of Penstock of CHEP-II. iii. Trash rack installed at bypass spill over gate. iv. Trash rack installed at inlet to CHEP-II. 11 Routine Repair and maintenance of 07 no. Electrically and 01 no. manually operated gates of CHEP-III by way of Complete cleaning of all parts by using petrol ,dhoti cloth, brush etc. after complete dismantling. Applying fresh coat of grease to all the parts of gate and then assemble it properly to both electrically. Oiling to chain sprocket arrangement and rollers which includes shaft, lock pin, roller, etc. Replacement of gear oil in reduction gearbox. Removal of old cadmium compound / grease from the steel wire rope, cleaning it properly andthen applying fresh coat of cadmium compound. Cleaning of sill beam. Replacement of damaged/burnt out contractors switches, fuses, indicators etc. The job also includes complete dismantling of winch machine of manually operated gates which include pinion, gear, gun metal bushes, etc. and cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine of the manually operated gates and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease. cleaning of sill beam. Checking the manual as well as electric operationof the gates by lifting and lowering it 2-3 times. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job. 2 No. operations in a year. 12 Routine maintenance of penstock of CHEP-III by way of clearing of vegetation/bushes/ boulders/ branches of trees along the length of the penstock from upstream to downstream sideby cutting of vegetation etc. clearing, stacking and their disposal away from the site manually includingclearing of the drains along the both sides of the penstocks. The job also includes reconditioning of the expansion joints of the penstock by way of cleaning of old oil/ grease, rust , dust etc. with the help of kerosene oil/ petrol, dhoti cloth and then plugging of leakages including proper torqueing of the nuts/studs and bolts of the expansion joints and manholesto maintain adequate pressure in the penstockrequired it he power house to run the turbines. The job includes cost of material, T&P items and both skilled and unskilled labour required for the successful execution of job. Complete job 13 Repair and maintenance of 2 no. drain valves at power house of CHEP-III by way of dismantling and cleaning of parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease, replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting etc. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job 14 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of dead animals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. i. Trash rack at Headworks of CHEP-III. ii. Trash rack at BR of CHEP-III. 15 Repair and maintenance of 3 No. manually operated gatesinstalled at Bhaderwah HEP by way ofcomplete dismantling of winch machine which include pinion, gear, gun metal bushes, etc. andcleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine and then assemble it properly. Oiling to rollers which includes shaft, lock pin, roller, etc. Replacement of old/damaged nuts and bolts for seals and guide hoisting ,removal of old grease from the threaded stem rod, cleaning it properly andthen applying fresh coat of grease (MAKE Castrol/servo).cleaning of sill beam. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items and labour engaged for the execution of job.(Complete Job). 16 Repair and maintenance of drain valve at forebay ofBhaderwah HEP by taking it out from their installed positions, dismantling and cleaning of all the parts like threaded rod ,glands, disc and flanges. Apply fresh coat of grease (MAKE Castrol/Servo), replacement of gaskets and gland seals with the new ones. Replacement of rusted/damaged nuts and bolts, fitting of the valves in their original positions. Checking their operations by opening and closing 2-3 times to ensure smooth flow of discharge. The job includes cost of material, T&P items and labour engaged for the execution of job. Complete job. 17 Routine repair and maintenance of penstock Bhaderwah HEP by way of clearing of vegetation/jungle/bushes/branches of trees along the length of penstock from upstream by way of cutting of vegetation, stacking and disposal of the same away from the site manually. Reconditioning of manhole & expansion joints of penstock by way of cleaning of old grease with the help of cotton/dhoti cloth. Cleaning and washing of the same with petrol to make them rust free, proper torquing of all thenuts of bolts with the help of torque wrench, applying grease to all nuts &bolts, plugging of leakages to avoid loss of discharge as well as to maintain adequate pressure of penstock required in the power house to run turbine including clearing of mulba accumulated at different locations. The job includes cost of materials, T&P items like torque wrench etc. and labour charges (skilled and unskilled) for the sucessful execution of job.Complete job 18 Dismantling, straightening and then re-installation/ erection of 1no. stem rod of manually operated gate of Bhaderwah HEP by way ofcomplete dismantling of damaged stem rod along with winch machine which include pinion, gear, gun metal bushes, etc. from its installed position then taking it to the workshop for straightening including cleaning of all parts by using petrol ,dhoti cloth, brush etc. Applying fresh coat of grease to all the parts of winch machine after the removal and cleaning of old grease from the threaded stem rodandoiling to rollers which includes shaft, lock pin, roller, etc., and then assembling it properly including checking its operation. The job also includes reinstallation of the stem rod along with winch machine to its original position. Replacement of old/damaged nuts and bolts for seals and guide hoisting if required. Checking the manual operation of the gate by lifting and lowering it 2-3 times. The job includes cost of materials, T& P items, to & fro carriage charges and labour engaged for the execution of job.(Complete Job). 19 Cleaning of trash racks installed at different locations on monthly basis as mentioned below and disposal of deadanimals as and when required by way of engaging mechanics, assistant mechanics, helpers and unskilled labour for clearing of stacked mulba, including boulders, wooden logs, bushes, leaves,plastic bags,plastic disposables and other unwanted materials and their disposal away from working site. The job also includes flushing of sand accumulated at the bottom of the gates after closing and opening of gate repeatedly to make the free flow discharge and to avoid any loss of pressure. The job includes cost of materials such as jute rope, bamboo baskets, ladders, Tools & tackles and labour engaged for the execution of job. Trash rack at Headworks & Forebay of Bhaderwah HEP
Basic Detail
Tender No 03 of 2021-22
Bidding Type Tender
Location
City Laddan
State Jammu And Kashmir
Key Dates
Publish Date 02 Dec 2021
Submission Date 21 Dec 2021
Open Date 22 Dec 2021
Finance
Tender Value Ref. Documents
Tender Fee 1000
EMD Ref. Documents
Exemption Not Available
Document List
c9ab5273-0cdf-4833-b293-b8e7dd18e288.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 02, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 21, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 22, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

c9ab5273-0cdf-4833-b293-b8e7dd18e288.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender