| 1 | Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30 cm measured at a height of 1 M above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 2 | Demolishing cement concrete manually/ by Mechanical means including disposal of material within 50 mtr. lead as per direction ofengineer -in –charge1:3:6 or richer mix . |
| 3 | Earthwork in excavation by manual means in tranches for foundation, drains, pipes, cables etc (not exceeding in 1.5M in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5M, including getting out excavated earth and disposal of surplus excavated earth as directed (25 M beyond 1M from cutting edge)All kinds of soil |
| 4 | Extra for every additional lift of 1.5Mtr.or part thereof inexcavation /banking excavated or stacked material All Kinds of soil |
| 5 | (2Lifts) |
| 6 | (3Lifts) |
| 7 | Preparingand dressing side slopes of canals for lining,In ordinary soils |
| 8 | Preparing and dressingbeds of canals for liningIn ordinary soils |
| 9 | Dumping stone excluding cost of stones In Horizontal on level |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:5:10(1cement:5 coarse sand :10 graded stone aggregate 40mm nominal size) |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level with1:3:6(1cement:3 coarse sand:6 graded stone aggregate 20mm nominal size |
| 12 | Providing and laying in-situ concrete lining using M-10 nominal mix concrete(max. size of aggregates 20mm nominal ) |
| 13 | In beds |
| 14 | In side slopes, up to a height of 3.5m above bed |
| 15 | Supply of stones (nallah) |
| 16 | Extra towards allowance for scaffolding |
| 17 | Curing canal lining for 28days |
| 18 | In beds |
| 19 | In side slopes |
| 20 | 15 mm cement Plaster on rough side of single or half brick wall of mix 1:6(1 Cement: 6 course sand) |
| 21 | Carriage of sand and stone aggregates from source to site of work avg. distance 10KM by Mechanical Transport |
| 22 | Carriage of stone from source to site of work avg. distance 10KM by Mechanical Transport |