| 1 | 1 (a) Earth work in excavation of foundation trenches in ordinary soil(vide classification of soil item-A)and soil disposal of excavated earth so obtained to a distance upto 50M and average lift of 1.5M including levelling, ramming the foundation trenches removing the roots of tree or shrubs etc all complete as per specification of E/I. (7.1.27) (WRD SOR - effrctive from 1st march 2021 |
| 2 | 1(b) E/W in Excavation in canal by the hydraulic excavator as per designed section in soft rock (where blasting is not needed) vide type of soil item -C with disposal of spoil upto 500 m with all lifts by tipper including construction and maintanannce of haul road all complete as per specification and direction of E/I. (7.1.43.6) (WRD SOR - effrctive from 1st march 2021 |
| 3 | 1 (c) E/W in Excavation in canal by the hydraulic excavator (rock breaker) as per designed section in soft rock (where blasting is prohibited) vide type of soil item -C with disposal of spoil upto 500 m with all lifts by tipper including construction and maintanannce of haul road all complete as per specification and direction of E/I. (7.1.43.8) (WRD SOR - effrctive from 1st march 2021 |
| 4 | Earthwork in lip cutting in side slopes and bed of canals in ordinary soil with initial lead of 30 M and lift of 1.5M. Including the cost of formation of sub grade of canal lining, profiling, levelling controling of slopes and fine dressing with disposal of excavated earth and nominal dewatering, if any all complete as per approved design, specification and direction of E/I.(7.1.21)(WRD SOR - effrctive from 1st march 2021) |
| 5 | (i) Providing and placing sand filter free from clay and other organic materials (F.M. 2.5 to 3.0) in slope and bed of the canal, below lining including the cost of watering, compaction, royalty and other taxes as per specification and direction of E/I.(where depth of canal cutting is more than 6m [20ft]). (7.2.8) [ part - B WRD SOR ( corrigendum ) effective from 1st June 2021 ] |
| 6 | (ii) Providing coarse clean local sand in filling in foundation treaches including ramming , watering, royalty and all other taxes complete job as per specification and direction of E/I. (7.1.37) part B WRD SOR effective from 1st june2021 (corrigendum) |
| 7 | Providing and laying P.C.C M-100 with nominal mix of (1:3:6) in foundation of various components of canal or embankment structure with approved quality of 40mm graded coarse aggregate of required grade (as per design) and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened including necessary tools and plants,vibrating, curing riyalty and all taxes etc. excluding cost of from work as well reinforcement,its cutting bending and placing complete job as per specification and direction of E/I. (7.3.3) -Refered to part AItem :-PCC 1:3:6 in foundation ( Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days )(7.1) Common item of works of SOR - corrigendum (effective from 1st June 2021 ) |
| 8 | Providing and laying P.C.C. orR.C.C. M-150 with nominal mix of (1:2:4) in foundation of various components of canal or embankment structure with approved quality of 40 mm graded coarse aggregate of required grade (as per design) and approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screenedincluding necessary tools and plants, vibrating, curing royalty and all taxes etc., excluding cost of form work as well reinforcement its cutting, bending, binding and placing complete job as per specification and direction of E/I. (7.3.2) - Refered to Part - A Item :- Plain / Reinforcement cement concrete in open foundation complete as per drawing and technical specification. { (7.2.A, page no. - 47} - PCC Grade M15 { Common item of works of SOR - corrigendum (effective from 1st June 2021 ) } |
| 9 | Plain / Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. (7.3. A (P), Page no. 47) { Common item of works of SOR - corrigendum (effective from 1st June 2021 ) }- PCC Grade M15 |
| 10 | Providing and laying P.C.C or R.C.C M-200 with nominal mix of (1:1.5:3) in foundation of various components of canal or embankment structure with approved quality of 40mm graded coarse aggregate of required grade ( as per design ) and approved quality of sand of requisite F.M. ( 2.5 to 3.00) washed and screened including necessary tools and plants, viberating , curing royalty and all taxes etc. excluding cost of form work as well reinforcement , its cutting, bending, bindingand placing complete job as per specification and direction of E/I. ( 7.3.5 ) - Refered part AItem :- Plain / Reinforcement cement concrete in open foundation complete as per drawing and technical specification. { (7.2.C - case I , page no. - 47} - RCC Grade M20 { Common item of works of SOR - corrigendum (effective from 1st June 2021 ) } |
| 11 | Plain / Reinforced cement concrete in sub-structure complete as per drawing and technical specifications ( 7.3 . E (P) case I , Page no. 48 ) RCC Grade M20 |
| 12 | Providing and laying R.C.C. M-200 with nominal mix of [1:1.5:3] in Deck slab with approved quality of 20mm graded coarse aggregate of required grade (as per design) and approved quality of sand of requisite F.m. (2.5 to 3.0) washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of centering and shuttering as well reinforcemet its cutting, bending, binding and placing complete job as per specification and direction of E/I.(7.3.13)Refered part A Item :- Furnishing and placing reinforced / pre-stressed cement concrete in super structure as per drawing and technical specification. ( 7.4.A Case I (i)(P)(common item of work of sor -corrigendum effective from 1st june 2021, page no. 48) |
| 13 | Providing 100mm thick P.C.C. lining in M- 150 with nominal mix of (1:2:4) with well graded stone chips (20mm and down) and coarse sand of approved quality of required F.M. (2.5 to 3.0) in side and bottom curved portion of the canal in panel with construction joined including cost of form work and its removal curing, roylty and all other taxes, complete job as per specification and direction of E/I. (7.2.19.1){ WRD SOR ( corrigendum ) effective from 1st June 2021} |
| 14 | Providing P.C.C. M-150 with nominal mix. Of (1:2:4) with approved quality of graded stone chips (20mm and down) and coarse granular sand of requisite F.M. (2.5 to 3.00) in lug slab cross and longitudinal sleepers for lining of canals including cost of form work and its removal, curing, royalty and all other taxes etc. all complete job as per specification and direction of E/I. (7.3.11) Refered part A Item :-plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications ) (7.2 A - PCC Grade M150)(common item of work of sor -corrigendum effective from 1st june 2021, page no. 47) |
| 15 | (i) Providing and laying P.C.C M-200 (1:1.5:3) in wearing coat over deck slab with approved quality of 20mm graded coarse aggregate of required grade (as per design) and approved quality of sand of reqisite F.M (2.5 to 3.0) washed and screened including necessary tools and plants,vibrating, curing , royalty and all taxes etc. excluding bending, binding and placing complete job as per specification and direction of E/I. (7.3.15 ) - Refered to Part A - Item :- Plain / reinforced cement concrete in sub-structurecomplete as per drawing and technical specifications { (7.3. B.(P), page no. 47)} { Common item of works of SOR - corrigendum (effective from 1st June 2021 )} |
| 16 | (ii) Plain / reinforced cement concrete in sub-structurecomplete as per drawing and technical specifications { (7.3. C.(P). Case I, page no. 47)} { Common item of works of SOR - corrigendum (effective from 1st June 2021 )} M25 |
| 17 | Providing and laying P.C.C. or R.C.C. M-250 with nominal mix of [1:1:2] in superstructure with approved quality of 20mm graded coarse aggregate of required grade (as per design) and approved quality of sand of requisite F.m. (2.5 to 3.0) washed and screened including necessary tools and plants, vibrating, curing, royalty and all taxes etc. excluding cost of centering and shuttering as well reinforcemet its cutting, bending, binding and placing complete job as per specification and direction of E/I.(7.3.11) - Refered to Part A - Item :- Furnishing and Placing Reinforcement / Prestressed cement concrete in super - structureas per drawing and technical specification (7.4.B. case-I (i).P , page no. 49 ){ Common item of works of SOR - corrigendum (effective from 1st June 2021 )} RCC Grade M25 |
| 18 | Plain / Reinforced cement concrete in sub-structure complete as per drawing and technical specifications ( 7.3 (F) (P) case I , Page no. 48 ) RCC Grade M25 |
| 19 | Earth work in filling foundation trenches or back filling of structuresin layers not exceeding 150 mm thick well watered, rammed and fully compacted and finally dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30M and lift of 1.5Mcomplete job, as per specification and direction of E/I. (7.1.31){ WRD SOR ( corrigendum ) effective from 1st June 2021} |
| 20 | Miscellaneous items |
| 21 | Providing and fixing in position 25mm thick bituminastic board (shallitex or equivalent) as per I.S. 1838-1983 in expansion or construction joints, all complete job as per specification and direction of E/I. (7.8.3){ Part - BWRD SOR ( effective from 1st March 2021 } |
| 22 | Providing and placing in position two layers shalimar tarfet BH (type - II Gr - I) i/s 1322 - 1992 in between cap and deck slab as per approved drawig, specification and direction of E/I. (S/R sl. No. 79, page 51). (20m x 1m) |
| 23 | Providing Iron Angle (65 X 65X 6/8/10 - Gr. - A) size confirming IS 226, welded with 10mm dia rod @ 300mm c/c and fixing in position in wearing coat at expansion joints edge as per approved drawings specificatino and disrection of E/I.page:-41 |
| 24 | Supplying and labour charge for laying and fixing LDPE film below bed and curvature including carriage upto work site all complete as per specification and direction of E/I (approved rate) |
| 25 | Supplying , laying and fixing of laminated bituminous Hassian cloth for canal lining work in slope above the curvature of lining including all taxesd and carriage to work site as per specification by E/I. (0.3kg / M2 Cot.) (S/R item no. 81, page 51) |
| 26 | Drainage spout complete as per drawing and Technical specification (RCD item no. 14.9) |
| 27 | Supply, fitting and fixing of rubber seal (Water stop) of approved quality for construction joints complete job as per specification and direction of E/I. (7.8.2) |
| 28 | E/W in flood embankment, canal banks as well as special repair of embankment in canal bank in grade A & B types of soil (vide soil -A and B) in proper profile excavation by hydraulic m/c and carriage by tipper truck obtained from borrow area or any other sources free from logs, roots, or any other ingredients with all lifts including breakig clods to maximum 60 mm size, placing earth in layers not exceeding 225 mm thick all complete as per specification & direction of E/I. (As per TEC letter No. 587 Dated 22-09-06) with lead beyond 150m but upto 500m. (7.1.26.1 ) { Part - BWRD SOR ( corrigendum ) effective from 1st June 2021 ) } |
| 29 | Supplying and labour charge for laying of Stone boulders of size 300mm in bed and side slopes as per approved drawings including all taxes and as per the specifications and directions of Engineer in charge. (M018 + 7.7.18)SORof WRD - corrigendum (effective from 1st June 2021 ) +WRD SORPart - B ( effective from 1st March 2021 |
| 30 | (a) Supplying, fitting and placing un-coatedHYSD bar reinforcement in foundation complete as per drawing and technical specifications. ( 8.1 / 12.4 ) (i) 25mm Ø (TMT Fe 500)Common item of works of SOR - corrigendum (effective from 1st June 2021 ) |
| 31 | (b)Supplying, fitting and placing HYSD bar reinforcement in sub - structure complete as per drawing and technical specifications. ( 8.3 / 13.6 ) (i) 25mm Ø (TMT Fe 500)Common item of works of SOR - corrigendum (effective from 1st June 2021 ) |
| 32 | (c)Supplying, fitting and placing HYSD bar reinforcement in super - structure complete as per drawing and technical specifications. ( 8.5/14.2) (i) 25mm Ø (TMT Fe 500) Common item of works of SOR - corrigendum (effective from 1st June 2021 ) |
| 33 | Providing shuttering including strutting proping etc. and its removal after use in foundation as per specification and direction of E/I. (7.3.18)[ Part - BWRD SOR ( effective from 1st March 2021 ] |
| 34 | Labour for rolling and compacting the earth in layers of 225mm thick at O.M.C by sheep foot roller driven by tractor to achieve minimum 95% of maximum dry density , including sprinkling the required quantity of water , making arrangement for supply and carriage of water with all leads and lifts , finishing the surface as per plan and drawing , including hire charge of capmaction machine and other tools and plants etc. for lined canal all complete as per specification and direction of E/I ( Mode of measurement - sectional measurement of compacted earth ).(7.1.39) (part B WRD SOR - corrigendum, effective from 1st june 2021) |
| 35 | Carriage of material loading,unloading and stacking |
| 36 | (i) Cement |
| 37 | (ii) Sand |
| 38 | (iii) Stone chips |
| 39 | (iv) Stone metal |
| 40 | (vi) Stone boulders |
| 41 | (v) Steel |
| 42 | Add GST @12% |
| 43 | Add Labour Cess @1% |