S.I.T.C. Of Critical Operations Power System ( Cops ) & Accessories At Mopa Airport - 100 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd And Accessories 2 Batteries 3 30 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd Andaccessor, AAI, GGIAL, Mopa Airport, Goa-Goa

Boards / Undertakings / PSU has published S.I.T.C. Of Critical Operations Power System ( Cops ) & Accessories At Mopa Airport - 100 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd And Accessories 2 Batteries 3 30 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd Andaccessor. Submission Date for this Tender is 07-12-2021. MCCB Tenders in AAI, GGIAL, Mopa Airport, Goa Goa. Bidders can get complete Tender details and download the document.




Tender Notice

29991420
Corrigendum : S.I.T.C. Of Critical Operations Power System ( Cops ) & Accessories At Mopa Airport - 100 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd And Accessories 2 Batteries 3 30 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd Andaccessor
Open Tender
Indian
Goa
Aai, Ggial, Mopa Airport, Goa
07-12-2021

Tender Details

S.I.T.C. Of Critical Operations Power System ( Cops ) & Accessories At Mopa Airport - 100 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd And Accessories 2 Batteries 3 30 Kva Upskva Ups ( N+1 Modular Configuration ) With Spd Andaccessories 4 Batteries 5 K-13 Isolation Transformer 280 Kva For Cops Of 2X100kva With All Accessories. 6 K-13 Isolation Transformer 45Kva For 30 Kvacops With All Accessories 7 K13 Isolation Transformer 80 Kva With Allaccessories 8 K13 Isolation Transformer 30 Kva With Allaccessories 9 K13 Isolation Transformer 15 Kva 10 Static Switch With All Accessories 11 Pdu With All Accessories 12 Power Cable 16 Sqmm, 3Core Xlpe Insulated, Pvc Sheathed Cable 13 Cable Tray 150Mm X 50Mm Wide With Insulation Accessories 14 Central Monitoring &Control System Software For Items No. 1 To 9 And Other As Specified In The Documents 15 Server Hardware 16 Network Switch 17 Network Timing Protocol Server 18 46 Intelligent Monitor 19 Maintenance Laptop 20 Ethernet Cat-6A Stp Cables With Shielded Connectors And Other Accessories Etc. As Per Site Requirements. 21 Cat 6A U / Ftp Lszh Patch Cord 22 19” Equipment Rack 42Ru And Accessories 23 Equipment Rack 9Ru And Accessories 24 Hardware For Integrating No / Nc Contact Of Mccb Of Panels & Db And Accessories 25 Installation Material & Accessories Needed For Installation Of Items / Components As Specified In The Document. 26 Cost Of 1St Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 27 Cost Of 2Nd Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 28 Cost Of 3Rd Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 29 Cost Of 4Th Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 30 Cost Of 5Th Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 31 Cost Of 6Th Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 32 Cost Of 7Th Calender Year Onsite Operational Peferomance Comprehensiveannual Mainteniance ( Oopcam ) , Inclusive Of All Spares & Battery After Completion Of 03 Calender Years Oopmw After Successful Sat 33 Sitc Of Replacement Of Batteries At End Of Third Year After Successful Completion Of Sat. 34 Sitc Of Replacement Of Batteries At End Of Sixth Year After Successful Completion Of Sat. 35 Sitc Of Replacement Of Batteries At End Of Nith Year After Successful Completion Of Sat.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-11-2021 Scope of work amendment Technical Bid 07-12-2021

Key Value

Document Fees
INR 2800 /-
EMD
INR 975815.0 /-
Tender Value
INR 4.87 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail