| 1 | Bidders to calculate the quantity as per Drawing Layout, SLD, P&ID & Site Visits w.r.t. - Supply and Installation of following items for complete DC solution at IIT-Mandi. |
| 2 | Civil and allied works |
| 3 | UPS -3*200 KVA |
| 4 | Batteries for 3 X 200 KVA along with Battery Stand, Isolator, DC cabling etc. |
| 5 | UPS 2*20 KVA |
| 6 | Batteries for 2*20 KVA alongwith Battery Stand, Isolator, DC Cabling etc. |
| 7 | DG set with AMF andSynchronization controller |
| 8 | DG LT panel |
| 9 | Other Accessories as Power and Control Cabling, Terminations, Exhaust Stack, approvals, earthing etc. |
| 10 | LVElectrical Components ,LT Panels, DBs etc. |
| 11 | All LT Cabling –Power and Control, Earthing, Lighting Arrestors, Cable Trays, Supports, Cable terminations, Glands and other accessories etc. |
| 12 | Internal and external Illumination System along with DBs |
| 13 | Precision Air Conditioning Unit (PAC/CRAC), along with Cu piping and other accessories etc. |
| 14 | Adiabatic Dry Cooler along with associated accessores etc.. |
| 15 | Adiabatic Dry cooler pumping alongwith associated accessories, VFD/FI drive & panel. |
| 16 | Pipes of all sizes ,Bends, valves, actuators, joints, end flanges and other hardware including accessories etc. |
| 17 | Instrumentation and Control for entire Cooling System |
| 18 | Fire Alarm system including Detectors, panels, cabling and associated accessories etc. |
| 19 | Fire Suppression system for Data Center area including Gas release panel, cylinder, Manifold, piping and associated accessories etc. |
| 20 | NOVEC Gas for Data center area |
| 21 | Fire suppression system for Utility Area including Gas release panel, cylinder, NOVEC, Gas, Manifold piping and associated accessories etc. |
| 22 | NOVEC Gas for Utility area |
| 23 | CCTV system including camera, switch, NVR, Cables, monitors etc. |
| 24 | IBMS software includingsystem ( Computer, Monitor) integration of third party devices, I/O modules, all control and communication cabling etc. |
| 25 | Other IBMS including Water leak detectors, Rodent Repellent, Vesda etc. system |
| 26 | Server Rack -42 U along withDuel PDU ,cable manager and blanking plates |
| 27 | Any other item, material, service charges etc.required to complete the entire solution as per Tender doc |
| 28 | Operation and Maintenance - Year-1 |
| 29 | Operation and Maintenance - Year-2 |
| 30 | Optional Post Warranty Items (These items will not be considered for computing L1. C-DAC/IIT-mandireserve the right towards placement of order for these items.) |
| 31 | Comprehensive Annual Maintenance Contract -Year-3 |
| 32 | Comprehensive Annual Maintenance Contract -Year-4 |
| 33 | Comprehensive Annual Maintenance Contract -Year-5 |
| 34 | Operation and Maintenance –Year-3 |
| 35 | Operation and Maintenance –Year-4 |
| 36 | Operation and Maintenance –Year-5 |