Bids Are Invited For Part - C -Item-1 - Supply & Installation Of Manual Test Stations ( Mts ) Complete With Lower Bend And With Pcc Foundation Including, Terminal Plate, Diagram Plate, Cable Identification Ferrules, & Proper Cable Termination With Lugs, Numbering Of Ts Etc. As Per Drawing & Specification ( With Ip55 ) Complete In All Respect And Per Instruction Of Eic , Part - C -Item-2 - Supply & Installation Of Manual Test Stations ( Mts ) Without Lower Bend & Without Pcc Foundation Including Terminal Plate, Diagram Plate, Cable Identification Ferrules & Proper Cable Termination With Lugs, Numbering Of Ts Etc. As Per Drawing & Specification ( With Ip55 ) Complete In All Respect And Per Instruction Of Eic. , Part - C -Item-3 - Shifting Of Mts Along With Foundation And Cable To Suitable Nearby Location As Per Instruction Of Eic. ( Cable Extra ) , Part - C -Item-4 - Repairing Of Mts Foundation With Supply And Replacement Of Foundation Bolts & Nuts Including Labour , Tools, Tackles Consumeables Like Cement, Sand Aggregates, Etc Complete In All Respect As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-5 - Repairing Of Mts Including Supply And Replacement Of Damaged Door, Door Locks, Terminal Plate, Diagram Plate, Neoprene Gasket, Brass Links Cable Identification Ferrules Etc In Mts With Proper Cable Termination, Cable Jointing, Lugs, With Numbering Of Ts Complete In All Respect Including Labour, Tools, Tackles, Consumeables Like Ms / Brass Bolts, Nuts, Washers, Insulation Tape Etc.As Per Scope Of Work Specifications And The Direction Of Eic , Part - C -Item-6 - Supply & Replacement Of Damaged / Missing Locks In Mts Including Labor, Consumables And Tools & Tackles As Per Drawings, Specifications & Instructions Of Eic. , Part - C -Item-7 - Supply & Installation Of Damaged / Missing Terminal Plates ( All Types ) With M10 Brass Studs, Washers, Links, Lugs & Nuts, Including Labor, Tools & Tackles And Consumables As Per Instruction Of Eic , Part - C -Item-8 - Supply And Fixing Of Diagram Plate In The Existing Manual Test Station ( All Types ) Complete In All Respect Including Labour, Tools, Tackles, Consumeables Etc. As Per Scope Of Work Specifications And The Direction Of Eic , Part - C -Item-9 - Identification Of Cables In Test Station: The Cables Inside The Test Station Shall Be Identified As Per Diagram Plate / Sticker By Proper Dressing, Identification Ferrules, Carrying Out Necessary Termination With Copper Lugs Of Required Size And As Per The Direction Of Eic. The Cable Dressing Shall Be Strictly As Per The Diagram Plate , Part - C -Item-10 - Supply And Fixing Of Neo-Prene Gasket In Mts Box Sizes ( All Types ) As Per Scope Of Work And Directions Of Eic. , Part - C -Item-11 - Repairing Of Aljb Including Supply Of New Locks & Latch For The Outer Enclosure, Shunt, Variable Resistance, Brass Links, Aljb Doors Including Welding Mechanical, Straightening Of Pipe, Fittings, Hinges, Labour, Tools Tackles, Consumables Like Lugs, Ms / Brass Nuts, Bolts, Washers, Insulation Tape Etc Complete In All Respect As Per Approved Drawings, Specification And As Per Direction Of Eic. , Part - C -Item-12 - Supply Of Xlpe Armoured Copper Cableof 4 Sq Mm As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-13 - Supply Of Xlpe Armoured Copper Cableof 6 Sq Mm As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-14 - Supply Of Xlpe Armoured Copper Cableof 10 Sq Mm As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-15 - Supply Of Xlpe Armoured Copper Cableof 25 Sq Mm As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-16 - Supply Of Xlpe Armoured Copper Cableof 35 Sq Mm As Per Scope Of Work, Specifications And Direction Of Eic , Part - C -Item-17 - Cable Laying Of 4 Sq Mm ( Xlpe Armoured Cable ) Inside The Test Station / Over Ground & Under Ground / Inside The Panel Including Excavation And Backfilling, Cable Laying Cable Jointing Above Ground Using Copper Sleeves, Termination Of Cable In Test Station / Panel, Cable Identification, Supply & Laying Of Bricks, Sand Etc Including Tools Tackles, Labour, Consumables As Per Scope Of Work, Specifications And The Direction Of Eic , Part - C -Item-18 - Cable Laying Of 6 Sq Mm ( Xlpe Armoured Cable ) Inside The Test Station / Over Ground & Under Ground / Inside The Panel Including Excavation And Backfilling, Cable Laying Cable Jointing Above Ground Using Copper Sleeves, Termination Of Cable In Test Station / Panel, Cable Identification, Supply & Laying Of Bricks, Sand Etc Including Tools Tackles, Labour, Consumables As Per Scope Of Work, Specifications And The Direction Of Eic , Part - C -Item-19 - Cable Laying Of 10 Sq Mm ( Xlpe Armoured Cable ) Inside The Test Station / Over Ground & Under Ground / Inside The Panel Including Excavation And Backfilling, Cable Laying Cable Jointing Above Ground Using Copper Sleeves, Termination Of Cable In Test Station / Panel, Cable Identification, Supply & Laying Of Bricks, Sand Etc Including Tools Tackles, Labour, Consumables As Per Scope Of Work, Specifications And The Direction Of Eic , Part - C -Item-20 - Cable Laying Of 25 Sq Mm ( Xlpe Armoured Cable ) Inside The Test Station / Over Ground & Under Ground / Inside The Panel Including Excavation And Backfilling, Cable Laying Cable Jointing Above Ground Using Copper Sleeves, Termination Of Cable In Test Station / Panel, Cable Identification, Supply & Laying Of Bricks, Sand Etc Including Tools Tackles, Labour, Consumables As Per Scope Of Work, Specifications And The Direction Of Eic , Part - C -Item-21 - Cable Laying Of 35 Sq Mm ( Xlpe Armoured Cable ) Inside The Test Station / Over Ground & Under Ground / Inside The Panel Including Excavation And Backfilling, Cable Laying Cable Jointing Above Ground Using Copper Sleeves, Termination Of Cable In Test Station / Panel, Cable Identification, Supply & Laying Of Bricks, Sand Etc Including Tools Tackles, Labour, Consumables As Per Scope Of Work, Specifications And The Direction Of Eic , Part - C -Item-22 - Cable Jointing / Repairing Of Underground Cable As Per Approved Procedure Including Excavation And Backfilling, Cable Jointing By Cable Jointing Kit ( Raychem / Equivalent ) , Termination & Identification Of Cables, Supply Of Cable Jointing Kit & Other Consumable, Labour, Tools, Tackles, Copper Sleeves, Heat Shrink Sleeves, Ferol Etc. For 4 Sq Mm. Xlpe Armoured Cu Cable As Per Scope Of Work, Specifications And Directions Of Eic , Part - C -Item-23 - Cable Jointing / Repairing Of Underground Cable As Per Approved Procedure Including Excavation And Backfilling, Cable Jointing By Cable Jointing Kit ( Raychem / Equivalent ) , Termination & Identification Of Cables, Supply Of Cable Jointing Kit & Other Consumable, Labour, Tools, Tackles, Copper Sleeves, Heat Shrink Sleeves, Ferol Etc. For 6 Sq Mm. Xlpe Armoured Cu Cable As Per Scope Of Work, Specifications And Directions Of Eic , Part - C -Item-24 - Cable Jointing / Repairing Of Underground Cable As Per Approved Procedure Including Excavation And Backfilling, Cable Jointing By Cable Jointing Kit ( Raychem / Equivalent ) , Termination & Identification Of Cables, Supply Of Cable Jointing Kit & Other Consumable, Labour, Tools, Tackles, Copper Sleeves, Heat Shrink Sleeves, Ferol Etc. For 10 Sq Mm. Xlpe Armoured Cu Cable As Per Scope Of Work, Specifications And Directions Of Eic , Part - C -Item-25 - Cable Jointing / Repairing Of Underground Cable As Per Approved Procedure Including Excavation And Backfilling, Cable Jointing By Cable Jointing Kit ( Raychem / Equivalent ) , Termination & Identification Of Cables, Supply Of Cable Jointing Kit & Other Consumable, Labour, Tools, Tackles, Copper Sleeves, Heat Shrink Sleeves, Ferol Etc. For 25 Sq Mm. Xlpe Armoured Cu Cable As Per Scope Of Work, Specifications And Directions Of Eic , Part - C -Item-26 - Cable Jointing / Repairing Of Underground Cable As Per Approved Procedure Including Excavation And Backfilling, Cable Jointing By Cable Jointing Kit ( Raychem / Equivalent ) , Termination & Identification Of Cables, Supply Of Cable Jointing Kit & Other Consumable, Labour, Tools, Tackles, Copper Sleeves, Heat Shrink Sleeves, Ferol Etc. For 35 Sq Mm. Xlpe Armoured Cu Cable As Per Scope Of Work, Specifications And Directions Of Eic , Part - C -Item-27 - Making Of Pipe To Cable Connection As Per Approved Procedure, Of All Types Of Cable Including Excavation And Backfilling, Surface Preparation, Pipe To Cable Connection By Means Of Pin Brazing Its Encapsulation, Holiday Testing Of The Exposed Section, Labour, Tools, Tackles Etc As Per Scope Of Work, Specifications And Direction Of Eic . ( Pin Brazing Kit And Holiday Detector Will Be In The Scope Of The Contractor ) . , Part - C -Item-28 - Painting Of Manual Test Station Including Removing Of Old Paint, Rust Etc Using Emery Paper, Surface Preparation To Get The Smooth Level Surface, Supply And Application Of 01 Coat Of Ready Mix Red Oxide Primer Of Approved Make, 02 Coats Of Ready Mixed First Quality Paint Of Approved Brand. ( Final Dry Paint Thickness Not Less Than 100 Micron ) , Numbering Of Test Station As Per Scope Of Work, Specification And As Per Direction Of Eic. , Part - C -Item-29 - Painting Of Anode Lead Junction Box Including Removing Of Old Paint, Rust Etc Using Emery Paper, Surface Preparation To Get The Smooth Level Surface, Supply And Application Of 01 Coat Of Ready Mix Red Oxide Primer Of Approved Make, 02 Coats Of Ready Mixed First Quality Paint Of Approved Brand. ( Final Dry Paint Thickness Not Less Than 100 Micron ) , Numbering Of Test Station As Per Scope Of Work, Specification And As Per Direction Of Eic. , Part - C -Item-30 - Painting Of Tr Unit Including Removing Of Old Paint, Rust Etc Using Emery Paper, Surface Preparation To Get The Smooth Level Surface, Supply And Application Of 01 Coat Of Ready Mix Red Oxide Primer Of Approved Make, 02 Coats Of Ready Mixed First Quality Paint Of Approved Brand. ( Final Dry Paint Thickness Not Less Than 100 Micron ) , Numbering Of Test Station As Per Scope Of Work, Specification And As Per Direction Of Eic. , Part - C -Item-31 - Supply & Replacement Of Imported Copper-Copper Sulphate Permanent Refrenece Cells ( Make Mc Miller / Tinker & Rasor Company / Caproco ) Necessary Backfill Material Including Excavation / Backfilling Cable Laying, Cable Identification Ferrules, Labour, Tools, Tackles, Consumables Like Sand, Brick, Lug, Brass Washers, Insulation Tape Etc, Complete In All Respects As Per Scope Of Work Drawings, Specification And Direction Of Eic. , Part - C -Item-32 - Supply And Installation Of Pre-Packed Magnesium Anodes With Cable Having Weight 17 Pounds Including Excavation, Backfilling, Cable Laying Up To Test Station And Cable Termination In Test Station, Cable Identification Ferrules, With Consumables Labour Etc. As Per Approved Drawing, Specification And Direction Of Eic , Part - C -Item-33 - Supply , Replacement & Installation Of Prepacked Single Zinc Anode ( 11Kg ) Of Reputed Make Including Excavation, Backfilling, Anode To Tail Cable Connection, Cable Identification, Coke Breeze Backfill Complete With Labor, Tools & Tackles As Per Drawings, Specifications & Instructions Of Eic , Part - C -Item-34 - Supply And Installation Of Pre Packed Pair Of Zinc Grounding Cell 22Kg Including All Tools, Tackles, Consumables, Labour, Chemical Back Fill, Excavation, Backfilling, Cable To Insert Joint, Laying Of Tail Cable, Cable Termination At Ts Complete And In All Respect As Per Drawing, Specification And As Per Direction Of Eic , Part - C -Item-35 - Supply Of Earthing Strip 25 Mm X 4 Mm Size: Conducton Material: Gi Conforming To Is Code 2629, Zinc Deposition: Not Less Than 610 Grams / Square Meter, Length Of Strip: Minimum 7 Mtr And Maximum 10Mtr, Thickness Of Zinc Coating: Not Less Than 86 Micron And Smooth, Continuous, Uniform & Free From Acid Spot, Galvanizing Process: Hot Dip Galvanized And As Per Scope Of Work& Specification In All Respect And As Per Instruction Of Eic. , Part - C -Item-36 - Supply Of Earthing Strip 50 Mm X 6 Mm Size: Conducton Material: Gi Conforming To Is Code 2629, Zinc Deposition: Not Less Than 610 Grams / Square Meter, Length Of Strip: Minimum 7 Mtr And Maximum 10Mtr, Thickness Of Zinc Coating: Not Less Than 86 Micron And Smooth, Continuous, Uniform & Free From Acid Spot, Galvanizing Process: Hot Dip Galvanized And As Per Scope Of Work& Specification In All Respect And As Per Instruction Of Eic. , Part - C -Item-37 - Laying Of Hot Dip Galvanized Of 25 Mm X 4 Mm Iron Earth Strip In Buried Trench At A Depth Of Minimum Upto 150 Mm From Fgl. Work Includes Civil Work Like Excavation, Breaking Of Pcc / Rcc & Back Filling After Laying Of Earth Strip, Welding Of Joints & Applying 2 Layers Of Bitumen Etc. As Per Scope Of Work & Specfication In All Respect And As Per Instruction Of Eic , Part - C -Item-38 - Laying Of Hot Dip Galvanized Of 50 Mm X 6 Mm Iron Earth Strip In Buried Trench At A Depth Of Minimum Upto 150 Mm From Fgl. Work Includes Civil Work Like Excavation, Breaking Of Pcc / Rcc & Back Filling After Laying Of Earth Strip, Welding Of Joints & Applying 2 Layers Of Bitumen Etc. As Per Scope Of Work & Specfication In All Respect And As Per Instruction Of Eic , Part - C -Item-39 - Construction Of Normal Earth Pit Scope Of Woks Includes Erection & Commissioning Ofearth Pits At Sv / Rr / Ip Stations Of Pipeline Wherever It Is Required Which Includes Supply Of All Required Material As Per Specification Like- 75 Mm Dia, 4.5 Mm Thickeness Earthelectrode, Gi Strip, Copper Cable, Bolt, Nuts / Check Nuts, Funnel, Back Filling Compound For Filling Around The Electrode, And Excavation Of Pit As Per Drawing Up To A Depth Of 3.5 Meter Minimum, Making Of Pit With Brick, Sand, Cement & Smooth Plastering, Fixing Of Ms Cover 6Mm Thickness, Termination Of Earth Wire / Cable / Strip & Connect Earth Pit With Grid And Also Ensure Continuity With Grid , Part - C -Item-40 - Construction Of Chemical Earth Pit: Scope Of Woks Includes Erection & Commissioning Of Chemical Earth Pits At Sv / Rr / Ip Stations Of Pipeline Wherever It Is Required Which Includes Supply Of All Required Material As Per Specification Like- Electrode, Gi Strip, Copper Cable, Bolt, Nuts / Check Nuts, Funnel, Back Filling Compound For Filling Around The Electrode, And Excavation Of Pit As Per Drawing Up To A Depth Of 3.5 Meter Minimum, Making Of Pit With Brick, Sand, Cement & Smooth Plastering, Fixing Of Ms Cover 6Mm Thickness, Termination Of Earth Wire / Cable / Strip & Connect Earth Pit With Grid And Also Ensure Continuity With Grid In All Respect As Per The Scope Of Work And Drawings And As Per Instruction Of Eic. , Part - C -Item-41 - Supply Ofearth Pit Chamber Ms Cover Of 6 Mm Thickness , Part - C -Item-42 - Preventive Maintenence Of Polarisation Cells / Kirk Cells Supply Of Koh Electrolyte, Complete In All Respect To Make The Cell In Working Condition And As Per Specifications And Instructions Of Eic , Part - C -Item-43 - Preventive Maintenance Of Anode Ground Bed -The Scope Of Work Includes Necessary Excavation For Carrying Out Ground Bed Curing With 500 Kg Of Common Salt And Water Of 18 Kl. The Work Includes Necessary Backfilling And Restoration To The Original Condition As Per The Direction Of Eic. The Contractor Shall Measure The Grounded Resistance After The Treatment Of Ground Bed. The Resistance Of Grounded After The Maintenance Shall Be Less Than 01 Ohm. Clearance If Any Required From Land Owner For Entering / Working In His Permisses Will Be In The Contractors Scope , Part - C -Item-44 - Supply And Installation Of Cable Markers ( Ci / Cs / Ms ) For Underground Cables And Equipment As Per The Scope Of Work And Specfication In All Respect And As Per The Instruction Of Eic. , Part - C -Item-45 - Carrying Out On-Off Close Interval Potential Survey ( Cipl ) With Lateral Gradient At One Meter Interval Using Data Loggers And Standard Cu / Cuso4 Reference Electrode Including Detailed Reports And As Per The Scope Of The Work And Specification In All Respect And As Per Instrution Of Eic. , Part - C -Item-46 - Stray Current Interference Survey At Railway Crossing Or Runnig Parallel To Gail Pipelines, Including 24 Hours Data Logging, Data Collection From Railways, Study The Effectiveness Of Existing Diode Bonding And Recommend Mitigation Measures / Modification Required At Existing Doide Jb, At All The Railway Crossings Or Running Parallel As Defined In Scope Of Work With Specification, Design And Detail Engineering In All Respect And As Per Instruction Of Eic. , Part - C -Item-47 - Stray Current Interference Survey At Foreign P / L Crossing Or Runnig Parallel With Gail Pipeline, Including 24 Hours Data Logging, Data Collection From Foreign Pipeline Operator, And Recommend Mitigation Measures At Foreign Pipeline Crossing Or Running Parallel To Gail Pipeline As Defined In The Scope Of Work, With Design, Specification And Detail Enggineering In All Respect And As Per Instruction Of Eic. , Part - C -Item-48 - Stray Current Interference Survey At Ht Crossings Or Runnig Parallel To Gail Pipelines, Including 24 Hours Data Logging, Collection Of Data From Seb, Calculation Of Human Touch And Step Voltages, Measurent And Calculation Of Ac Corrossion Current And Recommendation For Mitigation / Effectiveness Of Existing Grounding With Modification If Required, At Ht Line Crossings / Parallel Sections As Defined In The Scope Of Work With Design, Specification And Detail Enggineering In All Respect And As Per Instruction Of Eic.. , Part - C -Item-49 - Adequacy Of Cp Station , Study The Adequacy Of Existing Cp Stations ( Cptr & Cppsm ) , Including Effectiveness And Efficiency Of Remote Anode Bed, Effective Span Of Polarised Protection On The Pipelines From The Drain Point, Mode Of Operation For The Purpose Of Adequacy And Better Operation Of The Cp System And As Defined In The Scope Of Work In All Respect And As Per Instruction Of Eic.. , Part - C -Item-50 - Carryingout Current Attenuation Test / Direct Current Voltage Gradient ( Dcvg ) Survey Using Standard Dcvg Equipment To Pin Point The Coating Defect / Holidays On Pipeline As Per The Specifications In All Respect And As Per Instruction Of Eic.. , Part - C -Item-51 - Excavation Of Pipeline In All Type Of Soils And Ordinary Rocks For A Width Of D+500 Mm On Each Side Of Pipe And Exposing The Pipeline From Top Upto 500 Mm Below The Bottom Of Pipeline Including The Stacking Of Excavated Earth, Stacked Earth To Be Levelled And Neatly Dressed As Per The Scope Of Work And Directions Of Eic , Part - C -Item-52 - Backfilling Excavated Earth ( Excluding Rock ) In Trenches In Layers Not Exceeding 20 Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, As Per The Scope Of Work And Directions Of Eic. , Part - C -Item-53 - Coating Repair- Removing The Old / Damaged Coating / Rust Greese, Moisture And All Foreign Material At Defect Location With Scrapper, Manual Surface Preparation Using Hand Wire Brush, Emery Paper, Scrappers Or A Combination Of All Processes, Repairng Of The Coating With Supply Of Raychem Sleeves / Cold Applied Tape / Perp / Patch Repair Kit, Holiday Testing After Repair, As Per The Scope Of Work And To The Entire Satisfaction Of Eic. Multiple Patch Repairing At One Location Within One Meter Span Shall Be Trated As Single Quantity Only. Coating Material Will Be Supplied By Gail. ( Compensation, If Required To Land Owners Shall Be In The Scope Of Contractor ) , Part - C -Item-54 - Supply & Installation Of Surge Diverters ( Dehn / Equivalent ) In Mts At Ht Power Line Crossings Including Cable Identification, Labor, Tools & Tackles, Brass Studs / Nuts And Sundry Consumables , Part - C -Item-55 - Supply & Installation Of Explsoin Proof Spark Gap Arrestors Of Dehn Exsg4 / Equivalent Make Across Insulating Joints At Sv / Ip / Rr / Terminals Including Required Cable ( 25Sqmm, Cu ) , Lugs, Nuts & Bolts, Labor, Tools & Tackles, And Sundry Consumables , Part - C -Item-56 - Supply Of Portable Cu-Cuso4 Half Cell For Measuring Of Psp ( Pipe To Soil Potential ) Of Pipeline , Part - C -Item-57 - Anode Lead Junction Box ( Size :-500 X 700 X 250 ) Supply, Installation, Testing And Commissioning Of Anode Lead Junction Box Including Required Backelite Plate Brass Nut Bolts, Port Type Resistor & Shunt Arrangement, Civil Works With Materials As Per Eic , Part - C -Item-58 - Reconditioning / Recharging / Maintenance Of Existing Earth Pit At Rr / Terminals With Raising The Height Of Civil Foundation, Repair Of Cement Plastering, Painting Of Top Cover Plates And Numbering Of Earthpits. Supply Of Common Salt 50 Kg And Water 100L For Bringing Down The Circuit Resistance Including Making Necessary Excavation, Mixing & Pouring Of Salt & Water, Replacement & Cleaning Of Connecting Nuts And Bolts, Etc Complete In All Respect And As Per Directions Of Eic , Part - C -Item-59 - Installation & Commissioning Of Gail Supplied Corrosion Censing Probe At Sv / Rr Stations Of Hvj Pipeline In All Kind Of Soil Including Excavation, Installation, Termination In Manual Test Stations And Backfilling / Restoration To The Original Ground Condition Under Dibiyapur Region As Per Scope Of Work And Direction Of Eic. , Part - C -Item-60 - Bell Hole Inspection: Excavation In All Type Of Soils And Ordinary Rocks For A Width Of D+500 Mm On Each Side Of Pipe And Exposing The Pipeline From Top Upto 500 Mm Below The Bottom Of Pipeline Including The Stacking Of Excavated Earth On Pipeline For Bell Hole Inspection For Checking The Health Of Pipeline Including Backfilling & Restoration To Original Condition In All Respect As Per Direction Of Eic. , Part - C -Item-61 - Supply Installation & Commissioning Of Sspc ( Solid State Polarisation Cell ) In New Installation / Existing System In Case Of Damaged As Per Ace / Vde Specifications For Protection Of Hv / Ehv Power Lines Crossings, Iccc ( Rustroll System ) , Dairyland Or Equivalent Make ( As Approved By Eic ) Suitable For Arresting Induce Ac Fault Currents, Lightning & Surge Protection, Dc Voltage ( > 3 Volts ) And Blocking The Protective Cathodic Protection Current On The Pipeline. Supply Of Sspc, ( As Per Specification Mentioned In This Tender Documents ) , Test Station Of Suitable Size, Required Length & Size Of Cable, Consumables With Testing & Data Logging Before And After Installation ( Report To Be Submitted ) Are In The Scope Of Contractor. Complete In All Respect And As Per Direction, Specification Of Eic , Part - C -Item-62 - Soil Resistivity Survey By Wenner Four Point Method , Part - C -Item-63 - Supply And Installation Of End Seals Of Both Side Of Casings For 12 Carrier Pipes Including Making Suitable Trench Necessary Excavation Upto To Pipe Around 1.5 Mtrs, Expose, Replace & Backfilling Complete In All Respect As Per Instructions Of Eic And As Per Scope Of Work , Part - C -Item-64 - Supply And Installation Of End Seals Of Both Side Of Casings For 24 Carrier Pipes Including Making Suitable Trench Necessary Excavation Upto To Pipe Around 1.5 Mtrs, Expose, Replace & Backfilling Complete In All Respect As Per Instructions Of Eic And As Per Scope Of Work , Part - C -Item-65 - Rectification Of Short Casing , Part - C -Item-66 - Maintenance Of Lightning System ( Outdoor ) Maintenance Of Lighting System At Rr / Sv Station Under Dibiyapur Region. ( Height Of Pole Upto 12 M ) . All Consumable Materials, Ladder, Manpower, Vehicle Required For Maintenance Of Street Pole Light Will Under Scope Of Vendor. , Part - C -Item-67 - Supply & Installation Of Distribution Box :Supply & Installation Of Distribution Box With 63A / 100A Tpmccb, Bakelite Fuse, Bus Bar, Neutral Link In M.S. Sheet Enclosure Of Size Not Less Than 500X750x200mm With Enamel Painting And Cable Entry Holes With Lockable Door. All Mentioned Items Will Be In Scope Of Vendor. , Part - C -Item-68 - Supply, Installation & Commissioning Of Polarization Coupon Along With Magnetic Reed Switch As Per The Scope Of Work , Part - C -Item-69 - Supply Of Solar Charge Contr. 12V / 10A Dc At Sv Stations : Scope Of Work Shall Include Supply And Installation Of Solar Charge Controller For Pole Mounted Solar Light, 12V Dc, 10A ( As Per Installed System ) As Per Direction, Specification & Satisfaction Of Eic , Part - C -Item-70 - Supply Of Solar Charge Contr.Solar Plant: Scope Of Work Shall Include Supply And Installation Of Solar Charge Controller For Solar Plant, 96V Dc / 100A Or 120V Dc / 100A, 48V Dc / 180A ( As Per Installed System ) As Per Direction, Specification & Satisfaction Of Eic. , Part - C -Item-71 - Supply Of Dc / Dc Converter At Rr Station : Scope Of Work Should Include Supply And Installation Of Dc-Dc Converter At Rr / Ip Stations Under Dibiyapur. Input 30 V-70 V. Ouput 48 V , 21A. The Quanity Mentioned Against Each Maintenance Basemay Be Used In Other Region If Required. , Part - C -Item-72 - Permission From Statuary Authority: Scope Of Work Shall Include Granting Permission From Statuary Authority ( Railways / Highway / Forest / Any Government Related Authority ) For Any Kind Of Job In Their Rou Or In Forest Land As Per Requirement Of Gail. Transportation And Other Expenses Involved In The Job Shall Be In The Scope Of Contractor , Part - C -Item-73 - Preventive Maintenance Of Window / Spilt Preventive Maintenance Of Window / Spilit A / C Upto 3 Tons As Per Scope Of Work , Part - C -Item-74 - Preventive Maintenance Of Water Coolers Preventive Maintenance Of Water Coolers Up To 150 Ltrs As Per Scope Of Work , Part - C -Item-75 - Preventive Maintenance Of Refrigerator / D Preventive Maintenance Of Refrigerators / Deep Freezers Upto 350 Ltrs As Per Scope Of Work , Part - C -Item-76 - Sitc Of Starting Capacitor ( 80-100Mfd ) , Part - C -Item-77 - Sitc Of Running Capacitor ( 36 Mfd ) , Part - C -Item-78 - Sitc Of Starting Relay For A / C, Wc, Rg , Part - C -Item-79 - Sitc Of Thermostat , Part - C -Item-80 - Sitc Of Over Load Relay A / C, Wc, Rg , Part - C -Item-81 - Sitc Of Shaft For Blower Motor , Part - C -Item-82 - Sitc Of Bush For Blower Motor , Part - C -Item-83 - Sitc Of Float Valve For Water Cooler , Part - C -Item-84 - Sitc Of Fan Blade For Condenser , Part - C -Item-85 - Sitc Of Selector / Rotary Switch A / C , Part - C -Item-86 - Sitc Of Air Filter For Cooling Coil Of A Sitc Of Air Filter For Cooling Coil Of A / C , Part - C -Item-87 - Sitc Of Blower For A / C , Part - C -Item-88 - Sitc Of The Faulty Compressor Of Window / Split Sitc Of The Faulty Compressor Of Window / Split Ac Upto 3 Ton With New One In Buyback Scheme Of Old Burnet Compressor As Per Scope Of Work And Direction Of Eic , Part - C -Item-89 - Sitc Of The Faulty Compressor Of Refrige Sitc Of The Faulty Compressor Of Refrigerator / Water Cooler Upto 350 Ltr. With New One In Buyback Scheme Of Old Burnet Compressor As Per Scope Of Work And Direction Of Eic , Part - C -Item-90 - Sitc Of The Control Card For Single Ph Sitc Of The Control Card For Single Phase Window / Split Ac As Per Scope Of Work And Direction Of Eic , Part - C -Item-91 - Sitc Of Capillary / Copper Pipe Require Fo Sitc Of Capillary / Copper Pipe Require For Window / Split Ac , Water Cooler Refregerator Application As Per Scope Of Work And Direction Of Eic , Part - C -Item-92 - Supply And Charging Of Refregient Gas To Supply And Charging Of Refregient Gas To The Compressor Of Split / Window Ac / Refregerator / Water Cooler As Per Scope Of Work And Direction Of Eic Total Quantity : 1