| 1 | Compacting original ground below embankmentc) Compaction of earth work & preparation of sub grade including loosening, levling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in table 300-2 as per technical clause 305 of MORT&H specifications. |
| 2 | Providing and laying of brick on end edging 6.83 cm wide, 11.11cm long and 22.86 high half brick deep including excavation, refilling and disposal of surplus earth up to 50 mtr complete as per Punjab PWD specifications. |
| 3 | Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8- 10 tonnes in stages to proper grade and camber, applying and brooming Water Bound Macadam Grading I , watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications without screening |
| 4 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8- 10 tonnes in stages to proper grade and camber, applying an brooming Water Bound Macadam Grading II,watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications without screening |
| 5 | Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications. |
| 6 | Providing and applying tack coat with penetration grade bitumen VG- 10 using bitumen pressure distributor @ of 0.40 kg per sqm on the prepared bituminoussurface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications |
| 7 | Providing, laying and compaction of open - graded premix surfacing of 20 mm thickness consisting of crushed stone aggregates of specified grading premixed in a Continuous type hot mix plant with bituminous binder VG-10 @ 1.46kg per sqm, laid with Paver Finisher Mechanical and rolling with a smooth wheeled roller 8-10 tonne capacity,finished to required level and grades complete as per technical clause 510 of MORT&H specifications |
| 8 | Providing and laying of premix sand seal coat premixed in Continuous type hot mix plant using specified fine aggregates and penetration grade bitumen VG-10 @ 0.68kg per sqm, laid to the specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications |
| 9 | Reconstruction of Culvert |
| 10 | Dismantling concrete Reinforced cement concrete Slab |
| 11 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth |
| 12 | Construction of granular sub-base by providing material as per grading-III (Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications |
| 13 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type |
| 14 | Reinforced cement concrete M-30 mechanically batch mixed using batch typeconcrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth |
| 15 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete |
| 16 | Steel work fixed independently without connecting plates including cutting hoisting and fixing in position Tees angles & channels |
| 17 | Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc R.C.C. Pipe NP -3-900mm i/d pipe |
| 18 | Add extra cost of Cultural Cess @ 1% on Total costas items mentioned above on 1 to 17 |