Ibce-6373-C00-Pjm-Ten-Rfq-0137 Supply Of Axke101-Control Valves, Axke301-On Off Valves And Axke501-Self Actuating Control Valves , Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation And Preparation For Shipment And Supervision Of Erection & Commissioning Of The Axke101 - Control Valves As Specified In The Scope Of Supply List In Material Requisition Along With All Accessories, Erection & Commissioning Spares, Special Tools & Tackles And Third Party Inspection Forbr9 Expansion Project For Iocl Barauni Refinery As Specified In Material Requisition. , 301-Fv-7301 , 301-Pv-7411 , 301-Fv-7401 , 301-Fv-7402 , 301-Fv-7701 , 301-Fv-5201 , 301-Fv-6301 , 930-Fv-1110 , 301-Fv-2002 , 301-Fv-9501 , 301-Fv-9502 , 301-Fv-9503 , 301-Fv-9101 , 301-Fv-9102 , 301-Fv-9103 , 901-Fv-0501 , 901-Fv-0502 , 371-Pv-0301 , 322-Pv-0102A , 322-Pv-0102B , 322-Pv-0103 , 301-Fv-2001 , 301-Fv-2003 , Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation And Preparation For Shipment And Supervision Of Erection & Commissioning Of The Axke301-On Off Valves As Specified In The Scope Of Supply List In Material Requisition Along With All Accessories, Erection & Commissioning Spares, Special Tools & Tackles And Third Party Inspection Forbr9 Expansion Project For Iocl Barauni Refinery As Specified In Material Requisition. , 901-Uv-0501 , 901-Uv-0502 , Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation And Preparation For Shipment Of The Axke501-Self Actuating Control Valves As Specified In The Scope Of Supply List In Material Requisition Along With All Accessories, Erection & Commissioning Spares, Special Tools & Tackles And Third Party Inspection Forbr9 Expansion Project For Iocl Barauni Refinery As Specified In Material Requisition. , 901-Pcv-0501 , 901-Pcv-0502 , 301-Pcv-0801 , Charges For Site Supervision Of Erection, Testing And Commissioning For Axke101 - Control Valves / Axke301-On Off Valves. , Per Diem Charges For Upto 8 Hours Work On Normal Working Days. , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays (As Applicable To Refinery Site). => Limited