| 1 | A. Topographical Survey Work |
| 2 | Setting up site organisation including complete mobilisation of personnel, equipment & accessories as per specification, Making complete arrangement for Survey Work at site. |
| 3 | Carrying out Detailed Survey Work at Chromite Tailing Beneficiation Plant area as per layout, Specification & Scope of Work, preparation of survey drawings, maps etc. with contour interval of 0.5mtr, preparation of field report etc and submission of completedocuments / drawings, including all bye work |
| 4 | Carrying out Detailed Survey Work for Routing of Slurry Pipe Line from abandoned Quarry No.1 to Proposed Chromite Tailing Beneficiation Plant in a corridor of 30 m as per slurry pipe line corridor marked in the layout, Specification & Scope of Work, preparation of survey drawings, maps etc. with contour interval of 0.5 mtr, preparation of field report, land schedule, land schedule drawings etc and submission of complete documents / drawings, including allbye work. |
| 5 | Carrying out Detailed Survey Work for Routing of Raw Water Pipe Line from existing Quarry No. F to Proposed Chromite Tailing Beneficiation Plant in a corridor of 20 m (i.e. 10m on either side from the centre line of the existing road) as per layout, Specification & Scope of Work, preparation of survey drawings, maps etc. with contour interval of 0.5mtr, preparation of field report, land schedule, land schedule drawings etc and submission of complete documents / drawings, including all bye work. |
| 6 | Carrying out Detailed Survey Work for Routing of Raw Water Pipe Line from existing Quarry Near to slurry pumping station near to Quarry no 1 in a corridor of 20 m as per layout, Specification & Scope of Work, preparation of survey drawings, maps etc. with contour interval of 0.5mtr, preparation of field report, land schedule, land schedule drawings etc and submission of complete documents / drawings, including all bye work. |
| 7 | Carrying out Detailed Survey Work for Routing of Cable from existing MRSS to Proposed Chromite Tailing Beneficiation Plant in a corridor of 10 m along the boundary wall of existing COB plant, as per layout, Specification & Scope of Work, preparation of survey drawings, maps etc. with contour interval of 0.5 mtr, preparation of field report, etc and submission of complete documents / drawings, including all bye work. |
| 8 | Setting out, construction of survey pillars as per drawing and marking of axes & levels with enamel paint on the insert plates fixed on the same including all labour and materials, bye works as per, specifications drawings and instructions of Engineer |
| 9 | a. Bench Mark Pillars |
| 10 | b. Grid Pillars |