Supplying And Erection Of Shuttering Including De-Shuttering For Different Worksites Under R.D. Kanchanpur Division Erection Of Centering Shuttering Cum De - Shuttering After Casting , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Dasda R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Dasda R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Laljuri R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Laljuri R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Jampui Hill R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Jampui Hill R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Damcherra R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Damcherra R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Panisagar R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Panisagar R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Kalacherra R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Kalacherra R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Jubarajnagar R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Jubarajnagar R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Suspended Floor, Beam, Column Etc With Soft Wood Plank Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, Batten, Runner ( 2” X 3” ) Sized @75Mm Center To Center Supported With Barak Bamboo Or Adjustable Steel Propping 75Mm To 100Mm Dia With A Spacing 600Mm To 750Mm Center To Center Including Using Of Nails, Dhari, Polythene Completed As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Kadamtala R.D. Block. , Supplying And Erection Of Centering & Shuttering On Hiring Basis For Road Side Drain / Canal, Rcc Channel, Rcc Culvert, Retaining Wall / Guard Wall Etc With Soft Wood / Steel Shutter Of Not Less Than 30 Mm Thick Soft Wood / Water Proof Or Film Coated Ply Of 12 Mm Minimum Thickness, With Necessary Propping And Runner Using Of Nails, Dhari, Polythene Complete As Per Requisite And Removable Of Cs And Propping After 7 To 21 Days From The Date Casting As Per Direction Of Eng-In-Charge For Kadamtala R.D. Block.