E-Tender For (A) Supply, Dismantling And Erection Of Esp Hoppers (B) Supply, Dismantling And Erection Of Support Column, Beams Ridge Beams, Cross Bracings, Casing Plates, Bearings, Pedestal, Other Structural Materials. (C) Supply, Dismantling E-Tender For (A) Supply, Dismantling And Erection Of Esp Hoppers (B) Supply, Dismantling And Erection Of Support Column, Beams Ridge Beams, Cross Bracings, Casing Plates, Bearings, Pedestal, Other Structural Materials. (C) Supply, Dismantling , For 600Mw Boiler , Cost For Dismantling Of Collapsed Esp Hoppers And Field Internals Of Esp As Per Erection Scope Of Work. , Supply Of Complete Hopper Assembly By Fabrication, Including All Accessories As Perscope Of Supply. , Erection Of Esp Hopper Assembly Along With Its Accessories As Per Erection Scope Of Work. , Supply Of Fabricated Esp Support Column, Beams, Cross Bracings Including Its Accessories As Perscope Of Supply. , Cost For Dismantling The Severely Damaged, Bent, Twisted Columns, Beams, Cross Bracings And Supports Of Esp As Per Erection Scope Of Work. , Cost For Erection Of Fabricated Columns, Beams, Cross Bracings, Casing Plates Including Painting As Per Erection Scope Work. , Supply Of Complete Esp Internals In One Electrical Field, Suitable For Unit-I Andii Of Nctps – Ii, 600 Mw Capacity. , Cost For Dismantling The Esp Internals, Including Consumables Andt And P’S. , Cost For Erection, Testing, Commissioning Of Esp Internals In Electrical Field, Including Consumables And T And P’S. , Supply Of Fabricated A Or B Pass Ducts Connecting Esp Inlet Funnel, Supportincluding Its Accessories As Perscope Of Supply. , Cost For Dismantling The Severely Damaged, A Or B Pass Ducts Connecting Esp Inlet Funnel, Supportincluding Its Accessories As Per Erection Scope Of Work. , Cost For Erection Of Fabricated A Orb Pass Ducts Connecting Esp Inlet Funnel, Support Including Its Accessories As Per Erection Scope Work.