| 1 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 2 | Fitting and erecting one HT \"A\" type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 3 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
| 4 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 5 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 6 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 7 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 8 | Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
| 9 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
| 10 | Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials. |
| 11 | Erection of LT 2 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing). |
| 12 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 13 | Fitting one set AB switch and giving connection |
| 14 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
| 15 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 16 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
| 17 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. |
| 18 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 19 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 20 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 21 | Providing Stay for LT poles incl. digging & back filling pit. |
| 22 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 23 | Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling existing 2 conductors, stringing 3 Rabbit & 1 Weasel incl. conveyance. |
| 24 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 25 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 26 | Cutting Channel/Cross Arm/Angle Iron into two pieces. |
| 27 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 28 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 29 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 30 | Reconductoring one km LT Sph 2 wire OH old line with new ACSR Rabbit conductor incl. conveyance of materials. |
| 31 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 32 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 33 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 34 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 35 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling |
| 36 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 37 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 38 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 39 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. |
| 40 | Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable). |
| 41 | Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling. |
| 42 | Doing one cable end termination on cables of sizes beyond3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally. |
| 43 | Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections. |
| 44 | Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc. |
| 45 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 46 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 47 | Loading HT \"A\" type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 48 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 49 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 50 | Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified. |
| 51 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 52 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 53 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
| 54 | Providing Bucket type cradling for one span 11kV line. |