| 1 | Stagered Trenches (SGT Work) |
| 2 | Layout of contour lines(BSR 13-14 item 182) |
| 3 | Dagbelling work (with Allignments) for SGT work 2.5 cm to 5 cm Deep(BSR 2019-20 Item no.6a) |
| 4 | Stagered Trenches (SGT Work)Excavation including loading & Unloading,desposal and dressing of excavated earth within initial lead of 50 mtr. & 1.5mtr. lift in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect |
| 5 | (a) in hard soil mixed with kankar/ boulders, morrum(60%) WRD item no. 1c page 13 |
| 6 | (b) in soft/ disintigrated rock (40%) WRD item no. 2a page 13 |
| 7 | supply of stylo hameta grass seed |
| 8 | stylo hameta seed sowing on ridgh (BSR 2019-20 Item no.159) |
| 9 | Pacca Chackedam/Anicut Renovation/Packki Sari |
| 10 | uhoa [kkbZ ijukyk esa 1-5 xgjkbZ rd feV~Vh [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk] uho Hkjus ds ckn [kkyh Lfkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k djuk |
| 11 | lk/kkj.k@eqyk;e feV~Vh esa ch-,l-vkj-2021&22¼vkbZVe ua- 2 ,½ |
| 12 | l[r]fpduh]dadj feV~Vh esa ch-,l-vkj-2021&22¼vkbZVe ua- 2 ch½ |
| 13 | fo?kfVr pV~Vku ch-,l-vkj-2021&22¼vkbZVe ua- 2 lh½ |
| 14 | lk/kkj.k pV~Vku ch-,l-vkj-2021&22¼vkbZVe ua- 2 Mh½ |
| 15 | lhesaV dkØhaV 1 lhesaV] 3 ctjh rFkk 6 fxêh iRFkj dh 20 fe-eh- ukeh; eki dh uhao es Mkyuk ,uhdV ds fy,A GKN 26-03-2019 vkbZVe la[;k 170 b |
| 16 | ,izsu esa vkj vkj eslsujh 23 lseh- eksVkbZ esa [kjatk GKN 26-03-2019vkbZVe la[;k 149 b |
| 17 | ,uhdV gsrq iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esaA GKN 26-03-2019vkbZVe la[;k 166 a |
| 18 | uhao o vf/kjpuk esa |
| 19 | lhesaV dkdhaV 1 lhesaV % 2 ctjh % 4 iRFkj ,xzhxsV vuqikr es 12 fe-eh- ukeh; eki dh ,xzhxsV ds lkFk MkyukA GKN 26-03-2019vkbZVe la[;k 16 |
| 20 | lhesaV IykLVj nhokj ij 1%4 vuqikr es lhesaV&ctjh feykdj dj tksMksa dks dqjsnus rFkk rjkbZ lfgr 20 fe-eh- A GKN 26-03-2019vkbZVe la[;k 76 a |
| 21 | 25 fe-eh- eksVkbZ esa |
| 22 | 20 fe-eh- eksVkbZ esa |
| 23 | RCC |
| 24 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, de watering wherever required complete in all respect (WRD 2020 Item no. 1 page 13 P) |
| 25 | (A) Hard soil mixed with kanker/boulders, morum (50%) (WRD 2014 20Item no. 1-C page 13 ) |
| 26 | (B) Soft/Disintergrated rock( 50%)(WRD 2020 Item no. 2-A page 13 ) |
| 27 | P/L cement concreting including curing, compaction etc. complete using stone aggregate 20mm nominal size in foundation and plinth (1:3:6) (GKN 2021 item no.170b) |
| 28 | P/L cement concreting (1:1.5:3) for Foundation RCC work (BSR 2021-22 item no 13 b) |
| 29 | P/F Reinforeced steel of required size (Dia) for RCC work in foundation I/C cutting bending & Placing of steel (BSR 2021-22 item no 61) |
| 30 | Centering & Shuttering work for RCC Work as per design (shuttering steel) BSR 2021-22 item no 93 a |
| 31 | P/F Display board on work site properly written in oil paint as per site in charge |