}

Tender For Amc For Instrument Maintenance Mining And Msp -, Ganjam-Odisha

Boards / Undertakings / PSU has published Tender For Amc For Instrument Maintenance Mining And Msp -. Submission Date for this Tender is 23-08-2021. Coats and Jackets Tenders in Ganjam Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

28771918
Tender For Amc For Instrument Maintenance Mining And Msp -
Open Tender
Indian
Odisha
Ganjam
23-08-2021

Tender Details

Tender For Amc For Instrument Maintenance Mining And Msp -1 Copper Cable upto 1.5 Sq. mm X 1 Core : Flexible 2 Copper Cable upto 1.5 Sq. mm X 3 Core : Flexible 3 Copper Cable upto 1.5 Sq. mm X 4-6 Core : Flexible 4 Copper Cable upto 1.5 Sq. mm X 2-6 Core : Armoured 5 Copper Cable upto 1.5 Sq. mm X above 6 core-20 Core : Armoured 6 Copper Cable upto 1.5 Sq. mm X above 20 core-40 Core : Armoured 7 Copper Cable upto 1.5 Sq. mm X 1 Pair : Armoured 8 Copper Cable upto 1.5 Sq. mm X 2-6 Pair : Armoured 9 Copper Cable upto 1.5 Sq. mm X above 6 Pair-20 Pair : Armoured 10 Copper Cable upto 2.5 Sq. mm X upto 4 core : Armoured 11 LAN Cable (CAT5 or CAT6) 12 Thermocople Compensating Cable 13 RTD Compensating Cable 14 Cable Glanding upto 25 mm: Poly Carbonate 15 Cable Glanding above 25 mm: Polycarbonate 16 Cable Glanding upto 25 mm: Metal Single/Double 17 Cable Glanding above 25 mm: Metal Single/Double 18 Copper Earthing : Wire 19 Copper Earthing : Strip 20 Installation Commissioning of Magnetic Flow meter : upto 80 mm 21 Installation Commissioning of Magnetic Flow meter: 100-300mm 22 Installation Commissioning of Magnetic Flow meter: 400 mm 23 Dismatling of Magneting Flow meter: upto 80 mm 24 Dismatling of Magneting Flow meter: 100-300 mm 25 Dismatling of Magneting Flow meter: 400 mm 26 Replacement of Earthing Plate: upto 200 mm 27 Replacement of Earthing Plate upto: 200-400 mm 28 Replacment of Gasket : upto 200 mm 29 Replacment of Gasket : above 200mm- 400 mm 30 Functional Testing & Troubleshooting of Magnetic Flow meter: 25- 400 mm mm 31 Preventive Maintenance of Magnetic Flowmeter with transmitter : Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20 mA...etc. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Magnetic Flow meter shall be submitted on each occasion. 32 Replacement of Density Gauge and Transmitter 33 Dismantling / Installation of Density Gauge and Transmitter 34 Replacement of Computing Unit and its accessories 35 Internal calibration & report generation of Density Meter 36 Replacement of Rubber Gasket 37 Functional Testing & Troubleshooting of Density meter 38 Preventive Maintenance of Density Meter: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Density meter shall be submitted on each occasion. 39 Installation and Commissioning of RTD or Thermocouple sensor Element 40 Dismantling of RTD or Thermocouple Sensor element 41 Installation and Commissioning Temperature Controller 42 Dismantling of Temperature Controller 43 Installation & Commissioning of Blind Controller 44 Dismantling of Blind Controller 45 Internal Calibration & report generation of Temperature Controller/Blind Controller 46 Internal Calibration & Report generation of RTD or Thermocouple Sensor element. 47 Replacement/Dismantling/Installation of Bimetallic Temperature Gauge 48 Replacement/Dismantling/Installation of Thermowell 49 Thermowell Hydro test 50 Functional Testing & Troubleshooting of Thermocouple with controller /RTD with Controller /Thermowell 51 Preventive Maintenance of Temperature Controller & Sensor Element: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Temperature measuring and Controlling shall be submitted on each occasion.52 Installation and Commissioning of Pressure Transmitter: up to 50 mm 53 Dismantling of Pressure Transmitter: up to 50 mm 54 Installation and Commissioning of Pressure Transmitter: above 50 mm to 100 mm 55 Dismantling of Pressure Transmitter: above 50 mm to 100 mm 56 Raiser tube replacement 57 Replacement of Isolation Valve: 6 mm- 50 mm 58 Functional Testing & Troubleshooting of Pressure Transmitter 59 Preventive Maintenance of Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Pressure Transmitter shall be submitted on each occasion. 60 Dismantling of Pinch type Control valve 61 Installation and Commissioning of Pinch type Control Valve 62 Replacement of Shaft & Brush 63 Replacement of Limit switch 64 Replacement of Capacitor 65 Adjustable of Limit switch 66 Replacement of Rubber Sleev 67 Repairing & Realignment of gear system 68 Replacement of gear system 69 Drilling & granding of shaft 70 Replacement of Motor 71 Valve Stroke Adjustment 72 Overhauling of Pinch Control Valve 73 Functional Testing & Troubleshooting of Pinch Type Control Valve 74 Preventive Maintenance of Pinch Control Valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Pinch Control Valve shall be submitted on each occasion. 75 Replacement of Butterfly Valve 76 Installation/ Dismantling of Butterfly Valve 77 Overhauling of Butterfly Valve 78 Replacement of Motor 79 Adjustment & realignment of the gear system 80 Repairing & realignment of variable register 81 Adjustment of Valve Stroke 82 Functional Testing & Troubleshooting of Butterfly Valve 83 Preventive Maintenance of Butterfly valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Butterfly Valve shall be submitted on each occasion. 84 Replacement of Water Flow meter 0-100 mm size 85 Replacement of Water Flow meter above 100- 200 mm 86 Overhauling of Water meter 0-200 mm size 87 Internal Calibration of Water meter 88 Functional Testing & Troubleshooting of Water Flow meter 89 Replacement of pH meter & Electrode/Conductivity meter 90 Dismantling of pH Electrode/Conductivity Sensor 91 Calibration of pH meter with Buffer Solution/Conductivity meter 92 Functional Testing and Troubleshooting of pH meter/Conductivity meter 93 Preventive Maintenance of pH Meter: Electrode cleaning, Meter- Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Analytical Instruments shall be submitted on each occasion. 94 Replacement of Electronic Component 95 Soldering of Electronic Component- new 96 Replacement of Low capacity Transformer 97 Replacement of Battery 98 Fuse Replacement 99 Replacement of Electronic SPD 100 Buzzer/Acknowledgement Testing 101 Functional Testing and Troubleshooting of Electronic System 102 Replacement of Digital panel meter / Timer / Counter 103 Installation/Dismantling of new Digital Panel meter / Timer / Counter 104 Programming of Digital Panel Meter as per Input and Output requirement 105 Functional Testing and Trouble shooting of Digital Panel meter /Timer /Counter 106 Preventive Maintenance of Digital Panel Meter or Timer: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Digital Panel meter/timer/counter shall be submitted on each occasion. 107 Replacement of Digital Totalizer 108 Installation/Dismantling of new Digital Totalizer 109 Programming of Digital Totalizer as per function Requirement 110 Functional Testing and Trouble shooting of Digital Totalizer 111 Preventive Maintenance of Digital Totalizer: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Digital Totalizer shall be submitted on each occasion. 112 Replacement of Digital Recorder 113 Installation/Dismantling of new Digital Recorder 114 Programming of Digital Recorder as per process requirement 115 Functional Testing and Trouble shooting of Digital Recorder 116 Preventive Maintenance of Digital Recorder: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist Digital Recorder shall be submitted on each occasion. 117 Replacement of PID Controller 118 Installation/Dismantling of new PID Controller 119 Parameter Adjustment and Fixing - PI,PD & PID 120 Functional Testing and Trouble shooting of PID Controller 121 Preventive Maintenance of PID Controllers: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of PID Controllers shall be submitted on each occasion. 122 Replacement Solenoid coil 123 Replacement of Timer 124 Replacement of Joystick 125 Replacement of Variable Resistor 126 Replacement of No/NC Push Button 127 Replacement of Relay 128 Replacement of SMPS 129 Functional Testing & Troubleshooting of DWUP Instrument system 130 Preventive Maintenance of DWUP Hydraulic System: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of DWUP -Instrumentation System shall be submitted on each occasion. 131 Replacement ultrasonic type Level Transmitter 132 Replacement of Dosing Pump 133 Replacement of Dosing Pump tube 134 Replacement of Valve Actuator 135 Repairing & Realignment of gear system 136 Replacement of Potentio meter 137 Replacement of Float Ball 138 Functional Testing and troubleshooting Sillimanite Floatation Cell 139 Replacement of Flame failure Detectors- Ultra violet Sensor 140 Replacement of Modulation Motors of Oil/Air Control system 141 Replacement/Cleaning of Burner Gun 142 Replacement/Cleaning of Spark Plugs 143 Replacement of Flame Switch 144 Replacement Copper Tube/SS Tube 145 Replacement of Solenoid Valve 146 Replacement of Ignition Transformer 147 Replacement of Air Flow Regulator 148 Replacement of Pressure Switch 149 Cleaning of air impulse line from field to Transmitter 150 Checking of Oil Heater ON-OFF System through Temp. Sensor and Indicator 151 Replacement of Sequence Controller 152 Checking of Field Instrument signal to VFD for interlock operation 153 Replacement of PLC with application program 154 Replacement of DI/DO/AI/AO/RELAY 155 Functional Testing and Troubleshooting of FBD 156 Preventive Maintenance of FBD System: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of FBD shall be submitted on each occasion. 157 Replacement of Oil Control valve system 158 Repair of Oil Control valve system 159 Repair/Replacement of Combustion Air Control valve 160 Repair of ID FAN Control Valve Actuator 161 Checking of of Oil Heater ON-OFF System through Temp. Sensor and Indicator 162 Repair/Replacement of Combustion Control Valve Actuator 163 Checking of Field Instrument signal to DAS Panel for Control room operation and monitoring System 164 Replacement of DI/DO/AI/AO Card 165 Functional Testing and Troubleshooting of Driyer 166 Preventive Maintenance of DRIYER system: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Driyer System shall be submitted on each occasion. 167 Replacement of Auto sample complete system 168 Installation of new Auto sampler 169 Replacement of Solenoid coil 170 Replacement of Timer 171 Replacement of Valve Body 172 Replacement of Limit Switch 173 Realignment of Gear System 174 Replacement of rubber sleeve 175 Function Testing and troubleshooting of Auto sampling system 176 Preventive Maintenance of Auto Sampling System: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Auto Sampling System shall be submitted on each occasion. 177 Replacement of PLC CPU and its accessories 178 Replacement of SMPS card 179 Replacement of Analog & Digital card 180 Replacement of Relay/Relay Card 181 Replacement of Terminal Block 182 Functional Testing & Troubleshooting 183 Re-starting of SCADA application S/W 184 Checking of Earthing and Supply Voltage 185 Preventive Maintenance of PLC SYSTEM: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist PLC system shall be submitted on each occasion. 186 Formatting and Drivers Installation of computer system 187 Mother Board Fan Replacement 188 Installation and Commissioning of LaserJet printer 189 Installation and Commissioning of Dot-matrix Printer 190 Replacement of RAM 191 Replacement CPU/Mouse/Keyboard/Monitor/Printer 192 Functional Testing and Trouble shooting of Computer/Printer 193 Preventive Maintenance of Computer and its accessories: Blowering and cleaning, dedusting and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist shall be standalone Computer system submitted on each occasion. 194 Loop checking AI (Analog Input) signal wise 195 Loop Checking AO (Analog Output) signal wise 196 Loop Checking DI (Digital Input) signal wise 197 Loop Checking DO (Digital Output) signal wise 198 Loop checking Cooper Cable signal wise- 4-20 mA/0- 10 V…etc 199 Loop checking Cooper Power Cable 200 Loop Checking of LAN Cable 201 Loop Checking Fiber Optic checking pair wise 202 Function Testing and Troubleshooting 203 Replacement of Battery & Commissioning 204 Replacement of UPS & Commissioning 205 Preventive Maintenance of UPS system: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of standalone UPS system shall be submitted on each occasion. 206 Installation/Replacement of Junction box using Anchor bolts, pre-fabricated frame…etc: Size 300 mm X 150mm X 150mm +/- 20 % 207 Installation/Replacement of Junction box using Anchor bolts, pre-fabricated frame…etc: Size 450 mm X 300mm X 160mm +/- 20 % 208 Installation/Replacement of Junction box using Anchor bolts, pre-fabricated frame…etc: Size 150 mm X 150mm X 150mm +/- 20 % 209 Dismantling of Junction Box of Different Size: Max. up to 450 mm X 300mm X 160mm +/- 20 % 210 Fixing of DIN Rail with screw or nut bolts for Junction Box 211 Fixing of Terminal Block up to 10 pairs 212 Fixing of Terminal Block above 10 pairs- 20 pairs 213 Fixing of Relays up to 10 Nos. 214 Fixing of required Casing Capping inside the Junction Box 215 Replacement Pressure/Vacuum Gauge 216 Installation or Dismantling of Pressure/Vacuum Gauge 217 Repair of Diaphragm for Pressure Gauge 218 Replacement and pressure setting of Differential pressure Gauge 219 Gauges response Checking 220 Preventive Maintenance of Gauges: cleaning and dedusting/Covering. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Gauges shall be submitted on each occasion. 221 Installation/Dismantling of Proximity Sensor/Limit Switch 222 Replacement of Proximity Sensor/Limit Switch 223 Functional Testing and Troubleshooting of Proximity Sensor 224 Preventive Maintenance of Proximity Sensor/Limit Switch: cleaning and dedusting/Covering. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Proximity Sensor /Limit switch shall be submitted on each occasion. 225 Replacement the level transmitter 226 Installation/Dismantling of level transmitter /Switch 227 Programming and Parameter Feeding 228 Calibration of Level Transmitter 229 Functional Testing & Troubleshooting of Level Transmitter/Switch 230 Preventive Maintenance of level transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check 4-20mA supply. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist Level Transmitter/Switch of shall be submitted on each occasion. 231 Replacement of Differential Pressure Switch 232 Installation/Dismantling of Differential Pressure Switch 233 Functional Testing and Troubleshooting of DP Switch 234 Preventive Maintenance of Differential Pressure Switch: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of DPT shall be submitted on each occasion. 235 Replacement of Rotameter 236 Installation/ Dismantling of Rotameter 237 Repair of Rotameter 238 Functional Testing and Troubleshooting of Rotameter 239 Preventive Maintenance of Rota meter: Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Rotameter shall be submitted on each occasion. 240 Functional Testing of Weighing Scales up to 3000 Kg 241 Load Testing of Weighing Scales with Test Weights up to 50% of Full Scale 242 Internal Calibration of Weighing Scale with standard weight (min. 100 kg) 243 Preventive Maintenance of Weighing Scale: Dedusting, surface cleaning, Load cell cable tightness etc..Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Weighing Scale shall be submitted on each occasion. 244 Checking & Cleaning of Earth plate, Load cell Nut and Bolt tightness etc.. 245 Greasing of Nuts & Bolts Frame and bridge Load Cell & 246 Providing support for carrying for maintenance by Contactor 247 Functional Testing and Troubleshooting 248 Brush Painting of Rust Converter 249 Spray Painting- Epoxy Primer 250 Spray Painting- Epoxy Finish paint 251 Dismantling of cover plate by gas cutting of nut & bolts and fixing of cover plate with new nuts & bolts for carrying weigh bridge painting work 252 Chipping & Buffing of Steel Structure for surface preparation for carrying Painting work 253 Preventive Maintenance Weigh bridge- Dusting, surface cleaning of Digitiser, Computer, Printer, Terminal Tightness…etc. PM Checklist of Weigh Bridge shall be submitted on each occasion. 254 Installation of new Belt Weigher 255 Replacement of Belt Weigher 256 Dismantling of Belt Weigher 257 Changing of load cell 258 Replacement of Tachometer 259 Repair of Existing Panel 260 Calibration of Belt Weigher- Speed / Load/ Rate of Flow 261 Functional Testing and Troubleshooting of Belt Wigher 262 Preventive Maintenance of Belt Weigher: Desting, surface cleanning,Load cell cable tightness etc..Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Belt Weigher shall be submitted on each occasion. 263 Calibration Of Bagging Machine 264 Replacement of Load Cell 265 Replacement of Pneumatic Cylinders 266 Checking/Repair of Sampling cylinder 267 Replacement of PU Tubes 268 Replacement of Air Solenoid Valve 269 Replacement of Air regulators 270 Replacement of Clamp Belt Rubber (width- 2) 271 Replacement of Foot Switch 272 Replacement of Air and Oil Regulators 273 Functional Testing and Troubleshooting of Bagging System 274 Preventive Maintenance of Bagging System: Dedusting, surface cleanning, Load cell cable tightness etc..Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Bagging system shall be submitted on each occasion. 275 Replacement of Needle 276 Replacement/ realignment of Looper 277 Replacement of V-Belt 278 Overhauling of Stitching Machine 279 Replacement of Power Supply cord 280 Functional Testing and Trouble Shooting 281 Preventive Maintenance of stitching: Blowering and cleaning, oiling, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Stitching Machine shall be submitted on each occasion. 282 Functional Testing of Smoke/Heat/multicriateia Detector/Beam detector 283 Functional Testing of Manual Pull Station/Strobe cum Hooter 284 Functional Testing of Adressable Interface Relay Module 285 Functional Testing Fire Alarm Control Panel 286 Replacement of Camera 287 Installation/Dismantling of Camera 288 Replacement of PoE Switch 289 Replacement of CCTV Monitor 290 Replacement of Power Supply Module 291 Function Testing and Troubleshooting of CCTV system 292 Preventive Maintenance of all cameras: Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist CCTV system shall be submitted on each occasion. 293 Installation/Replacement of Air Regulator system 294 Installation/Replacement of Air Filter System 295 Dismantling of Filter Unit 296 Dismantling Air Filter System Case 297 Pressure Setting for Air Regulator 298 Function Testing and Troubleshooting of Air Conditioning System 299 Preventive Maintenance of compressed air conditioning system: Blowering and cleaning, dedusting and Pipeline tightening. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Air conditioning of standalone system shall be submitted on each occasion. 300 Installation/Dismantling of Air Dryer 301 Replacement solenoid valve 302 Replacement of Solenoid coil 303 Replacement of Air Drier Control Unit 304 Function Testing and Troubleshooting of Air Drier 305 Preventive Maintenance of Air Drier: Blowering and cleaning, dedusting and covering, part checking. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Air Driyer shall be submitted on each occasion. 306 Fixing of Reflecting Sheet- Engineering Grade 307 Fixing of Reflecting Sheet- Diamond Grade 308 Fixing of Vinyl Sheet 309 Surface Preparation for Fixing of Sticker 310 Brush Painting -Primer 311 Brush Painting -Paint 312 Surface Preparation- Chipping/sand Paper/ Buffing 313 Replacement/Fixing of single pole MCB 314 Replacement/Fixing of double pole MCB 315 Replacement/Fixing of three pole MCB 316 Replacement/Fixing of ON & OFF push button, Lockable/Release button 317 Replacement/Fixing of 5/6 Amps. 3 pin Socket/ 3pin Plug Top/Switch piano type 318 Replacement/Fixing of 15 Amps. 3 pin Socket/ 3 pin Plug Top/Switch piano type 319 Fixing of Electrical PVC Junction Box - 4 X 4/4 X 6/4X10 320 Plastering in CM 1:4 (1 cement: 4 sand) of 10 mm average thickness, finished with a floating coat of neat cement and curing. 321 Masonry work in CM 1:5 ( 1 cement: 4 sand), using concrete block or brick of required size including raking out joints, finishing to proper lines & levels, chipping the existing floor concrete surface for necessary bonding , curing ...etc compete at all respect. 322 Laying in position plain cement concrete mix 1:2:4 ( 1 cement: 2 sand: 4 stone aggregates) for repair works after surface preparation and finishing smooth to a fair face at all levels, curing …etc. 323 PVC Conduit pipe up to 25 mm OD on the wall/Tray 324 PVC Conduit pipe up to above 25 mm - 50 mm OD on the wall/Tray 325 PVC Casing and Capping upto 25 mm width on the wall 326 Flexible Conduit up to 25 mm OD on the wall 327 Removal of PVC conduit and Casing & Capping 328 Connection PVC pipe Fittings- Coupling/bend/Tee 329 Fixing Casing Capping Fittings- Tee/Bend/Cover 330 HDPE Pipe Welding up to 63 mm OD 331 HDPE Pipe Welding above 63 mm OD- 110 OD 332 HDPE Fitting Welding- Bend and pipe end with flange of all sizes 333 HDPE Fitting Welding - Tee Equal of all sizes 334 Dismantling and Disposal of old or unused pipes 32- 110 mm OD 335 Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- 1/2 336 Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1/2 to 1 337 Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1 to 2 338 Laying or fixing of GI/Copper/SS pipes upto 2 339 MS Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm 340 MS Cable Tray Ladder Type- 200 mm X 40 mm X 6 mm 341 MS Angle Tray/Bend- 50 mm X 50 mm X 6 mm 342 MS Tray Support 343 Junction Box Fixing Bracket upto 2 sq. ft.: Mild steel 344 Junction Box Fixing Bracket above 2 sq. ft- 4 sq. ft.: Mild Steel 345 MS Fabrication as per Drawing provided EIC 346 MS Flange fabrication as per requirement with pipe up to 50 mm 347 MS Flange Fabrication above 50mm - 100 mm 348 SS/MS Cover for Field Instruments as per Drawingmax. sheet thickness 3 mm 349 Fabrication of Stainless steel thermowell of length upto 50 cm & OD up to 25 mm with process connection like Flange or threaded (F) and Hydro testing. 350 Fabrication of Stainless steel thermowell of length above 50 mm - 100 cm & OD up to 25 mm with process connection like Flange or threaded (F) and Hydro testing. 351 Removing of old cable from wall/cable tray/Casing/open area and disposal to designated area as per direction EIC after weighment within area 100 mtr. Inside the plant premises. 352 Collection of old metal scrap from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises. 353 Collection of old electronic waste from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises. 354 Preparation soft soil trench of size 30 cm X 30 cm X 30 Cm and refilling after cabling/piping..etc work 355 Preparation of Hard soil (RCC) by cutting of size 20 cm X 20 cm X 20 cm and reconditioning to originality by filling with plain concrete after laying of pipe or cable 356 Replacement of Control Panel of Booster Pump 357 Dismantling/Installation of Control Panel of Booster Panel 358 Functional testing and Troubleshooting of Booster Pump 359 Replacement of Spillage Alarm Panel System 360 Dismantling or Installation of Spillage Alarm Panel System 361 Replacement of Sensor switch 362 Functional testing and Troubleshooting of Spillage Alarm System 363 The Work Which are not included in the above List 364 Replacement of Piezometer 365 Insternal Calibration 366 Functional Testing & Troubleshooting

Key Value

Document Fees
INR 2360 /-
EMD
Refer document
Tender Value
INR 40 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail