Rate Contract For Supply Installation Commissioning And Testing Of Scada Rtdas Equipment At Various Location In Mpmkvvcl , Remote Terminal Unit ( Rtu ) For 2 No. Power Transformer ( Having 1 Mcu 6A, 1 Power Card, 5 Di Card Of 32 Digital Input, 3 Do Card Of 16 Digital Output, 1 Dcai Card, 1 Com 6 Cards, 1 Dc Voltage Transducer ) With Communication Protocol Iec, Dnp 3.0, 61850 Etc., 48V Operated , Multi Function Transducer 48V ( 5 Amp, 110 V With Rs485 Modbus Communication Protocol , Contact Multiplying Relays ( Cmrs ) With 2No + 1 Nc Operating At 30V Dc , Heavy Duty Relay ( Hdr ) For Cb Trip / Close ( 48V Dc, 2 No, 1 Nc ) , Ldms Along With Necessary Ldms Software License And Convertor 48V Dc To 230V Ac , 48 V Dc Power Supply ( Dcps ) System Based On Smps , Numerical Relay Scada Compatible For 33 Kv & 11 Kv Feeder Protection , Auxiliary Relay ( Mtr ) 4 No And 4Nc, 30V Dc, 10 Amp , Scada Compatible Winding Temperature Indicator ( Wti ) , Dial 150Mm, With Capilary, Mercury Swicth Type , Scada Compatible Oil Temperature Indicator ( Oti ) , Dial 150Mm, With Capilary, Mercury Swicth Type , 11 Kv Stand Alone Fault Passage Indicator Complete With Gprs Enabled Modem ( Scada Compatible ) , Battery For 11Kv Stand-Alone Fault Passage Indicator ( Siemens Make Fpi ) , Ac / Dc Auxiliary Supply Board With Suitable Mcb & Fuse Protection , Earthing Of Rtu / Frtu Panel , Frtu:- Comprising Panels, Racks, Sub-Racks, Power Supply Modules, Minimum 02 Cards Of 32 Digital Input Module, Cpu Analog Mcu Card With Minimum 03 Ethernet Port04 Com Port, Dcai, 1 Dc Voltage Transducer & Support All Standard Protocol Iec ( I.E. 103, 61850, 104, Modbus ) , Dcps ( 24V ) With Dual Battery Of Minimum 4 Hrs Backup As Per Specification Interfacing Equipment Along With 30V Dc To 24V Dc Convertor, Dual Sim 4G Modem With Active-Active Mode With Fallback Facility Of 4G / 3G / 2G, Necessary Cables / Connectors For Successful Commissioning Complete With The Panels And 50% Additional Space For Modules , Multi Function Transducer 24V ( 5 Amp, 110 V With Rs485 Modbus Communication Protocol , Dc Voltage Transducer , Dual Sim 4G Router / Modem With Active-Active Mode With Fallback Facility Of 4G / 3G / 2G , Additional Rack For Rtu / Frtu , Mcu 6A Module Card Master 48V Operated , Mcu 1A Module Card Master 48V Operated , Mcu 4A Module Card Slave 48V Operated , Mcu 6A Module Card Master 24V Operated , Mcu 1A Module Card Master 24V Operated , Mcu 4A Module Card Slave 24V Operated , Power Module Card 48V Operated , Power Module Card 24V Operated , Di Card Having 32 Digital Input, 48V Operated , Di Card Having 32 Digital Input, 24V Operated , Do Card Having 16 Digital Output, 48V Operated , Do Card Having 16 Digital Output, 24V Operated , Ai Card Having 8 Analog Input, 48V Operated , Com 6 Card, 48V Operated , Dcps ( 24V ) With Dual Battery Of Minimum 4 Hrs Backup , Convertor 48V Dc To 230V Ac ( 200 Watt ) , Convertor 30V Dc To 48V Dc ( 200 Watt ) , Convertor 30V Dc To 24V Dc ( 200 Watt ) , Scada Rtu Installation & Commissioning Charges , Scada Rtu Integration With Control Centre, Creation Of Database, Sld And End To End Testing , Rt-Das Frtu Installation & Commissioning Charges , Rt-Das Frtu Integration With Control Centre, Creation Of Database, Sld And End To End Testing , Installation And Commissioning Of Scada Feeder Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any , Installation And Commissioning Of Scada Ptr Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any , Installation And Commissioning Of Scada Capacitor Bank Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any , Installation And Commissioning Of Rt-Das Feeder Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any , Installation And Commissioning Of Rt-Das Ptr Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any , Installation And Commissioning Of Rt-Das Capacitor Bank Panel Along With Necessary Retrofitting And Termination Of Either Ends Including All Cables, Lugs, Connectors And Accessories If Required Any