Tender Enquiry For In Asset Erdd Of In Asset - 1.0001 Sow- In Asset -01 001 Docking- Vessel To Be Docked In Both Versions. Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises Last Undock -Sep 18 1.0002 002 Hull Cleaning Under Water Free Flood And Boot Top Area Hp Jet Clean Entire Under Water Area Including Free Flood Area And Boot Top Area ( With A Pressure Not Exceeding 3000 Psi ) Including Ship Side And Remove The Mud / Marine Growth / Barnacles And Prepare For Survey. 1.0003 002 Hull Cleaning Above Water Area ( A ) Clean The Entire Above Water Area With Hp Jet Washing ( With A Pressure Not Exceeding 3000 Psi ) I.A.W. No 01 / 15 And Present For Survey 1.0004 002 Hull Cleaning Weather Deck ( B ) Clean The Entire Weather Deck Including Deck Fittings With Hp Jet Washing ( Not Exceeding 3000 Psi ) I.A.W. No 01 / 15 And Present For Survey 1.0005 002 Hull Cleaning Tanks ( C ) Manually Clean Internal Tanks I.A.W. No 01 / 15 And Present For Survey. 1.0006 003 Hull Survey External And Internal Hull Survey. Hull Survey. Carry Out Visual And Hammer Survey / Utg Survey In Accordance With No 19 / 06 Of Under Water Hull, Boot Top, Above Water Hull, Weather Decks And All Internal Tanks Etc, All Stiffeners And Deck Fittings Including Lifting Hooks / Eyes. Approx Area: 2690 Sqm 1.0007 004 Utg Survey Quote For Utg Survey Points At U / W Hull , Above Water And Weater Deck And Internal Tanks . 1.0008 005 Steel Renewals Quote For Steel Renewal At Various Locations As Per Survey Report. Note 1:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A’ Quality Ship Building Steel For Shell And Is 2062 Grade `B’ Quality Steel For Non Structural Works, Renewal Of All Obstructions In Way Of Steel Renewals Including Minor Fittings With Their Foundations, Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. 1.0009 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor ( A ) Approx Size 25X25 Mm-250 Nos 1.001 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor ( B ) Approx Size 50X50 Mm - 150 Nos 1.0011 007 Fairing Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team / Surveyor 1.0012 008 Re-Welding Run Carry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team / Qc / Rmt. 1.0013 009 Draught Marks Draught Marks Corroded / Eaten Away, To Be Renewed And Painted. Both Roman And Numeric. 1.0014 010 Sacrificial Anodes Renew Sacrificial Anodes ( Mk I ) Those Consumed More Than 50% Note:- Anodes Navy / Coy Supply. 1.0015 011 Surface Preparation With Grit Blasting Under Water Area Including Free Flood Area And Boot Top Area Spot Blasting To Sa 2.5 On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. 1.0016 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer - 50 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0017 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0018 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0019 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.002 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F:Sea Quantum Pro U And Spectrum 150 Microns ( Light Red / Dark Red ) Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0021 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Sea Quantum Pro U And Spectrum 150 Microns ( Light Red / Dark Red ) Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0022 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Black ) - 2 X 150 Microns 1.0023 013 Surface Preparation Above Water Area Carry Out Surface Preparation W On Above Water Area To Sa2.5 Standard Under The Suprvision Of Paint Oem. 1.0024 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Penguard Primer - 50 Microns Dft 1.0025 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic ( Grey / Red Brown ) - 125 Microns Dft 1.0026 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jotamastic ( Grey / Red Brown ) - 125 Microns Dft 1.0027 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Hard Top Xp Grey - 60 Microns Dft 1.0028 015 Surface Preparation Weather Decks And Fittings Carry Out Surface Pre [ Partion To Wj 2 Standard As Per Survey Report Of Paint Oem For Paint Application For Entire Weather Deck. 1.0029 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 1.003 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic 87 Of 200 Microns 1.0031 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jota Armour Dark Grey Of 800 Microns 1.0032 017 Surface Preparation Internal Tanks Carry Out Grit Blasting To Sa 2.5 Standard At Paint Defective Area / As Survey Report Of Paint Oem For Paint Application. 1.0033 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 1.0034 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anticorrosive Balloxy ( Hb Light ) - 150 Microns 1.0035 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anticorrosive Balloxy ( Hb Light ) - 150 Microns 1.0036 019 Deck Fitting Fair Lead ( Ms Cleats ) Including Base Plate Corroded / Perished, To Be Renewed As Per Survey Report ( A ) Size Of Eye Plate- 230X550x20 Mm Thick Plate, 1.0037 019 Deck Fitting Twin Bollards On Weather Deck Including Base Plate Corroded / Perished, To Be Renewed As Per Survey Report ( B ) Twin Bollard Size Dia- 400X800x20 Mm Height 1.0038 019 Deck Fitting Twin Bollards On Weather Deck Including Base Plate Corroded / Perished, To Be Repaired As Per Survey Report ( C ) Twin Bollard Size Dia- 400X800x20 Mm Height 1.0039 020 Manhole Cover ( A ) Manhole Cover Neoprene Rubber Joints Perished, To Be Renewed ( Rubber Joint Size: - 520Mm X 760Mm X08 Mm ) 1.004 020 Manhole Cover ( B ) Manhole Cover Including Coamings Perihsed / Thinned To Be Renewed As Per Survey Report ( Approx Size - 3X18 ) 1.0041 020 Manhole Cover ( C ) Manhole Stud Nut And Bolts With Washers Corroded / Perished To Be Renewed. ( Size Of Stud Bolt -16 Mm X 50Mm Length, 30 Nos On Each Manhole, Mat Ss ) . 1.0042 020 Manhole Cover ( D ) Handle Of Manhole Covers Corroded / Thinned, To Be Renewed As Per Survey Reports ( Mat-Ms Rod -12 Mm Thick ) 1.0043 021 Apt Air Pressure Test The Following Tanks And Rectify The Defects Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Note:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. Internal Tank ( Note- Priority For Below W / L Tanks ) 1.0044 022 Distortion Areas In Which Distortion Of Hull Structures Exceeds 3 Times The Thickness Of Plate Or 1 / 20 Of The Frame Spacing ( Which Ever Is Smaller ) Shall Be Renewed. In The Areas Of Dents, The Structure Shall Be Inspected For Any Distortion Of The Stiffeners Inside And Cracks By Dp Test. 1.0045 023 Circular Fenders -Horizontal Fenders Circular Rubber Fenders Perished / Cracked, To Be Renewed Whichever Is Damaged As Per Nes170 ( A ) Fenders Details Are As Follows- Mat-Epdm, Colour-Black Rubber Size- Ø250 ( Od ) Xø125 ( Id ) X1600mm Long. 1.0046 023 Circular Fenders Securing Arrangment -Horizontal Fenders ( B ) Circular Fender Securing Brackets ( Flat Bars With Ms Pad Of Both Ends, Mat- Ms Corroded / Thinned / Perishe , To Be Renewed As Per Survey Reports . Thickenss Of The Brackets 12 Mm 1.0047 023 Fenders Securing Arrangment ( C ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of The Nut & Bolt Length- 400 Mm, Dia 20 Mm For Nut And Bolt , Mat- Ms 1.0048 023 D Type Rubber Fenders -Vertical Fenders ( D ) D Shaped Rubber Fenders Perished / Cracked, To Be Renewed, As Per Nes 170 Fenders Details Are As Follows - Mat-Epdm, Colour-Black Rubber Size Of The Fenders - 6900 X250x300 Mm - 54 Nos 1.0049 023 Fenders Securing C Channel ( E ) Vertical Fender Securing Brackets ( Flat Bars With Ms Pad Of Both Ends, Mat- Ms Corroded / Thinned / Perishe , To Be Renewed As Per Survey Reports . Thickenss Of The Brackets 12 Mm, 6200 Mm X200mm 1.005 023 Fenders Securing Arrangment ( F ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of The Nut & Bolt Length- 400 Mm, Dia 20 Mm For Nut And Bolt , Mat- Ms Qty- 600 Nos 1.0051 023 Fenders Securing Arrangment ( G ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of Nylon Washer- Ø50 ( Od ) Xø21 ( Id ) X3mm Thik- Qty - 1200 Nos 1.0052 023 Fenders Securing Arrangment ( H ) Vertical And Horizonatl Fender Is To Be Secured With Gi Chain 1.0053 023 Fenders Securing Arrangment ( J ) Ms Eye Fitted On Ship Side For Securing Of Vertical / Horizontal Fenders Corroed / Thinned / Holed , To Be Renewed / Repaired As Per Survey Reports 1.0054 024 Vent Pipes And Breathers Vent Pipes And Breaters Corroded / Thinned / Holed , To Be Renewed / Repaired . 1.0055 025 Dead Weight Carryout Removal Of Dead Weights To Facilitate Uw Routines And Fitted Back After Routines As Required 1.0056 Sow- In Asset -02 001 Docking- Vessel To Be Docked In Both Versions. Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried Out In Navy Premises Last Undock -Sep 18 1.0057 002 Hull Cleaning Under Water Free Flood And Boot Top Area Hp Jet Clean Entire Under Water Area Including Free Flood Area And Boot Top Area ( With A Pressure Not Exceeding 3000 Psi ) Including Ship Side And Remove The Mud / Marine Growth / Barnacles And Prepare For Survey. 1.0058 002 Hull Cleaning Above Water Area ( A ) Clean The Entire Above Water Area With Hp Jet Washing ( With A Pressure Not Exceeding 3000 Psi ) I.A.W. No 01 / 15 And Present For Survey 1.0059 002 Hull Cleaning Weather Deck ( B ) Clean The Entire Weather Deck Including Deck Fittings With Hp Jet Washing ( Not Exceeding 3000 Psi ) I.A.W. No 01 / 15 And Present For Survey 1.006 002 Hull Cleaning Tanks ( C ) Manually Clean Internal Tanks I.A.W. No 01 / 15 And Present For Survey. 1.0061 003 Hull Survey External And Internal Hull Survey. Hull Survey. Carry Out Visual And Hammer Survey / Utg Survey In Accordance With No 19 / 06 Of Under Water Hull, Boot Top, Above Water Hull, Weather Decks And All Internal Tanks Etc, All Stiffeners And Deck Fittings Including Lifting Hooks / Eyes. Approx Area: 2690 Sqm 1.0062 004 Utg Survey Quote For Utg Survey Points At U / W Hull , Above Water And Weater Deck And Internal Tanks . 1.0063 005 Steel Renewals Quote For Steel Renewal At Various Locations As Per Survey Report. Note 1:- Quoted Repair Cost Shall Include Cost Of Both Sides Blasted And Primed Grade `A’ Quality Ship Building Steel For Shell And Is 2062 Grade `B’ Quality Steel For Non Structural Works, Renewal Of All Obstructions In Way Of Steel Renewals Including Minor Fittings With Their Foundations, Etc., As Indicated By Survey Team / Rmt, Proving Of The Weld Runs By Non-Destructive Tests And By Hose Test On Completion Of Welding, Pressure Testing And Proving Of Tanks Where Steel Renewal Undertaken Etc. 1.0064 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor ( A ) Approx Size 25X25 Mm-250 Nos 1.0065 006 Build Ups Carry Out Build Ups As Indicated By The Hull Survey Team / Surveyor ( B ) Approx Size 50X50 Mm - 150 Nos 1.0066 007 Fairing Carryout Fairing Of Deformed Structures As Indicated By Hull Survey Team / Surveyor 1.0067 008 Re-Welding Run Carry Out Re-Welding Runs On Weld Seams As Indicated By Hull Survey Team / Qc / Rmt. 1.0068 009 Draught Marks Draught Marks Corroded / Eaten Away, To Be Renewed And Painted. Both Roman And Numeric. 1.0069 010 Sacrificial Anodes Renew Sacrificial Anodes ( Mk I ) Those Consumed More Than 50% Note:- Anodes Navy / Coy Supply. 1.007 011 Surface Preparation With Grit Blasting Under Water Area Including Free Flood Area And Boot Top Area Spot Blasting To Sa 2.5 On Paint Damaged Areas / Renewed Plate Areas As Per The Paint Oem Rep Recommendation For Paint Application. 1.0071 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer - 50 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0072 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anti Corrosive - Jotacote Universal ( Aluminium ) - 150 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0073 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anti Corrosive - Jotacote Universal ( Grey ) - 150 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0074 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Tie Coat: Safeguard Es - 125 Microns Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0075 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( E ) 5Th Coat: A / F:Sea Quantum Pro U And Spectrum 150 Microns ( Light Red / Dark Red ) Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0076 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( F ) 6Th Coat: A / F: Sea Quantum Pro U And Spectrum 150 Microns ( Light Red / Dark Red ) Pontoon Was Manufacture In 2010. Life Of U / W Paint Scheme Is 10 Years. However Full Paint Is To Be Renewed. 1.0077 012 Painting - Jotun Scheme Under Water Area Including Free Flood Area And Boot Top Area Paint Under Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( G ) 7Th Coat: A / F: Seaquantum Ultra ( Black ) - 2 X 150 Microns 1.0078 013 Surface Preparation Above Water Area Carry Out Surface Preparation W On Above Water Area To Sa2.5 Standard Under The Suprvision Of Paint Oem. 1.0079 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Penguard Primer - 50 Microns Dft 1.008 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic ( Grey / Red Brown ) - 125 Microns Dft 1.0081 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jotamastic ( Grey / Red Brown ) - 125 Microns Dft 1.0082 014 Painting - Jotun Scheme. Above Water Area Paint Above Water Area With Following Paint Scheme As Per Oem Recommendations:-Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( D ) 4Th Coat: Hard Top Xp Grey - 60 Microns Dft 1.0083 015 Surface Preparation Weather Decks And Fittings Carry Out Surface Pre [ Partion To Wj 2 Standard As Per Survey Report Of Paint Oem For Paint Application For Entire Weather Deck. 1.0084 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 1.0085 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Jotamastic 87 Of 200 Microns 1.0086 016 Painting - Jotun Scheme Weather Decks And Fittings Paint Weather Decks And Fittings With Following Paint Scheme:- Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Jota Armour Dark Grey Of 800 Microns 1.0087 017 Surface Preparation Internal Tanks Carry Out Grit Blasting To Sa 2.5 Standard At Paint Defective Area / As Survey Report Of Paint Oem For Paint Application. 1.0088 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( A ) 1St Coat: Primer - Penguard Primer -50 Microns Dft 1.0089 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( B ) 2Nd Coat: Anticorrosive Balloxy ( Hb Light ) - 150 Microns 1.009 018 Painting - Jotun Scheme Paint All Internal Tanks With Following Paint Scheme Note:- Quoted Repair Cost Shall Be Inclusive Of Cost Of Paints Also. ( C ) 3Rd Coat: Anticorrosive Balloxy ( Hb Light ) - 150 Microns 1.0091 019 Deck Fitting Fair Lead ( Ms Cleats ) Including Base Plate Corroded / Perished, To Be Renewed As Per Survey Report ( A ) Size Of Eye Plate- 230X550x20 Mm Thick Plate, 1.0092 019 Deck Fitting Twin Bollards On Weather Deck Including Base Plate Corroded / Perished, To Be Renewed As Per Survey Report ( B ) Twin Bollard Size Dia- 400X800x20 Mm Height 1.0093 019 Deck Fitting Twin Bollards On Weather Deck Including Base Plate Corroded / Perished, To Be Repaired As Per Survey Report ( C ) Twin Bollard Size Dia- 400X800x20 Mm Height 1.0094 020 Manhole Cover ( A ) Manhole Cover Neoprene Rubber Joints Perished, To Be Renewed ( Rubber Joint Size: - 520Mm X 760Mm X08 Mm ) 1.0095 020 Manhole Cover ( B ) Manhole Cover Including Coamings Perihsed / Thinned To Be Renewed As Per Survey Report ( Approx Size - 3X18 ) 1.0096 020 Manhole Cover ( C ) Manhole Stud Nut And Bolts With Washers Corroded / Perished To Be Renewed. ( Size Of Stud Bolt -16 Mm X 50Mm Length, 30 Nos On Each Manhole, Mat Ss ) . 1.0097 020 Manhole Cover ( D ) Handle Of Manhole Covers Corroded / Thinned, To Be Renewed As Per Survey Reports ( Mat-Ms Rod -12 Mm Thick ) 1.0098 021 Apt Air Pressure Test The Following Tanks And Rectify The Defects Any Observed During Pressure Testing And Prove To 0.14 Kg / Cm2. Note:- Apt And Proving Of Those Tanks Wherein Steel Renewal Undertaken As Part Of Steel Renewal Dl. 0003 ( C ) Above Is That Of Firms Liability With No Additional Cost And Those Tanks Where No Steel Renewals Undertaken Only Would Be Considered For Payment As Per The Indicated Rates Under This Dl. Serial. Internal Tank ( Note- Priority For Below W / L Tanks ) 1.0099 022 Distortion Areas In Which Distortion Of Hull Structures Exceeds 3 Times The Thickness Of Plate Or 1 / 20 Of The Frame Spacing ( Which Ever Is Smaller ) Shall Be Renewed. In The Areas Of Dents, The Structure Shall Be Inspected For Any Distortion Of The Stiffeners Inside And Cracks By Dp Test. 1.01 023 Circular Fenders -Horizontal Fenders Circular Rubber Fenders Perished / Cracked, To Be Renewed Whichever Is Damaged As Per Nes170 ( A ) Fenders Details Are As Follows- Mat-Epdm, Colour-Black Rubber Size- Ø250 ( Od ) Xø125 ( Id ) X1600mm Long. 1.0101 023 Circular Fenders Securing Arrangment -Horizontal Fenders ( B ) Circular Fender Securing Brackets ( Flat Bars With Ms Pad Of Both Ends, Mat- Ms Corroded / Thinned / Perishe , To Be Renewed As Per Survey Reports . Thickenss Of The Brackets 12 Mm 1.0102 023 Fenders Securing Arrangment ( C ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of The Nut & Bolt Length- 400 Mm, Dia 20 Mm For Nut And Bolt , Mat- Ms 1.0103 023 D Type Rubber Fenders -Vertical Fenders ( D ) D Shaped Rubber Fenders Perished / Cracked, To Be Renewed, As Per Nes 170 Fenders Details Are As Follows - Mat-Epdm, Colour-Black Rubber Size Of The Fenders - 6900 X250x300 Mm - 54 Nos 1.0104 023 Fenders Securing C Channel ( E ) Vertical Fender Securing Brackets ( Flat Bars With Ms Pad Of Both Ends, Mat- Ms Corroded / Thinned / Perishe , To Be Renewed As Per Survey Reports . Thickenss Of The Brackets 12 Mm, 6200 Mm X200mm 1.0105 023 Fenders Securing Arrangment ( F ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of The Nut & Bolt Length- 400 Mm, Dia 20 Mm For Nut And Bolt , Mat- Ms Qty- 600 Nos 1.0106 023 Fenders Securing Arrangment ( G ) Vertical And Horizonatl Fender Is To Be Secured With Nut And Bolt Including Nylon Washer And Secured With Skirting Plate . Size Of Nylon Washer- Ø50 ( Od ) Xø21 ( Id ) X3mm Thik- Qty - 1200 Nos 1.0107 023 Fenders Securing Arrangment ( H ) Vertical And Horizonatl Fender Is To Be Secured With Gi Chain 1.0108 023 Fenders Securing Arrangment ( J ) Ms Eye Fitted On Ship Side For Securing Of Vertical / Horizontal Fenders Corroed / Thinned / Holed , To Be Renewed / Repaired As Per Survey Reports 1.0109 024 Vent Pipes And Breathers Vent Pipes And Breaters Corroded / Thinned / Holed , To Be Renewed / Repaired . 1.011 025 Dead Weight Carryout Removal Of Dead Weights To Facilitate Uw Routines And Fitted Back After Routines As Required 1.0111 Services Docking And Undocking Charges ( Both Versions ) Firm Not To Quote. Docking And Undocking Will Be Done By Navy In Navy Permises I.E Nd ( V ) / Slipway. 1.0112 Dock Blocks Preparation & Laying Out As Per Docking Plan Firm Not To Quote. Job Will Be Done By Navy . 1.0113 Dock Hire Charges For An Estimated Duration Of Days As Per Ocr Firm Not To Quote. Dry Dock Facility Will Provided By Navy In Navy Permises I.E Nd ( V ) / Slipway. 1.0114 Wet Basin / Alongside Hire Charges For The Remaining Duration ( I.E. Total Refit Duration Of – Days Docking Period ) Firm Not To Quote. Dry Dock Facility Will Will Provided By Navy In Navy Permises 1.0115 Quote For Maintenance Of Two In No. Fire Lines For The Refit Duration . Firm To Quote. 1.0116 Provision Of Two Transports ( Cars ) For Entire Refit Duration ( One For Refit Co-Ordinating Staff And One For Nd ( V ) Monitoring Team ) For 12 Hrs Or 100Km / Day Whichever Is Less Firm To Quote. 1.0117 Provision Of Stationory / Office Items For Nd ( V ) / Refit Monitoring Team For Entire Refit Duration Period. Cater Budget Of Rs 2000 / - Per Month. Requirement Will Be Intimated Rmt / Ndv On As Requirement Basis. Payment At Actuals. Note:- Firms To Quote. 1.0118 Qc Inspection For The Entire Scope Of Work By Third Party Irs / Lrs / Abs / Qc / Tpi For The Refit Duration As Per The Qis. Firm Not To Quote. Services Will Be Provided By Nd ( V ) / Qc