Repair And Maintenance Of Permanent Way And Other Civil Works Incaptive Rail System , Nalco S And P Complex , Angul , Maintenance Of Permanent Way ( Smelter ) , Overhauling Of Track As Per Technical Specification At Jointly Identified Locations Including Return Of Salvageable Materials At Nalco Stores With All Complete As Per The Direction Of Mic . ( Smelter ) , Through Packing Of Track As Mentioned In Technical Specification Enclosed With All Labour , T&P , Complete As Per The Direction Of Mic . ( Hilti Off Track Hand Held Tamper Te 905 With Built In Avr System Or Equivalent To Be Procured And Used For Packing ) ( Smelter ) , Supplying And Stacking Of Graded Machine Crushed Hard Granite Stone Ballast In Accordance With Is:2386 Part Iv-1963 At Jointly Identified Locations With All Lift And Lead Of Along Railway Track Inclusive Of All Labour , Supervision , Material , T&P ( Void Deduction To Arrive Net Quantity For Payment Shall Be As Per Technical Specification All Complete As Per The Direction Of Mic . ( Smelter ) , Leading Ballast From Stacks , Putting In To Track And Packing Inclusive Of All Labour , Supervision And Tools & Plant In Nalco Railway Siding Including Leveling And All Leads All Complete As Per Specifications And Directions Of Mic . ( Smelter ) , Replacement Of Prestressed Concrete Sleepers At Jointly Identified Spots With Opening Of Ballast , Removal And Refixing Of Rails With All Fittings And Fixtures , Repacking Of Ballast Etc . Complete As Per Technical Specification With All Labour , T&P , Supervision Etc . Including Return Of Salvageable Material At Nalco Stores Complete As Per The Direction Of Mic . ( Smelter ) , Prestressed Concrete Turnout Sleepers Of 1 In 8 . 5 Including Coordination With East Coast Railway If Necessary Signaling And Interlocking Arrangements All Complete Including Overhauling & Thorough Packing As Per Specification And Direction Of Mic . ( Smelter ) , Earth Work In Rough Excavation , Banking Excavated Earth In Layers Not Exceeding 20Cm In Depth , Breaking The Clods , Watering , Compacting And Dressing Up In Embankments For Repair Of Cess , Formation , Roads , Flood Banks / Embankments Etc . Along / Adjacent To Nalco Track And Land Including All Labour , Tools , Tackles , Dewatering Etc . Complete With All Lead With Lift As Directed By Mic . ( Payment Shall Be Made On Borrow Area Measurement ) ( Smelter ) , Maintenance Of Level Crossing And The Approaches Including Opening Of The Level Crossing With Sleepers , Fittings , Check Rails And Fastenings , Inspecting The Same Thoroughly And Refixing Of The Same With Renewal Of Psc Sleepers & Rails If Required , Maintenance Of Proper Flange Way Clearance , Cross Level , Gauge And Alignment Etc . And Return Of All Salvageable Materials To Nalco Stores With All Cost Complete As Per Direction Of Mic . ( Note:- Payment Of Rails And Sleepers Shall Be Made Separately Under Respective Items ) . ( Smelter ) , Cleaning Of Masonry Drains , Catch Water Drains , Culverts By Taking Out Loose-Earth , Soft Debris , Broken Stone / Brick , Sand , Silt And Other Foreign Materials Up To All Depth And Disposing Off At Designated Locations Within A Lead Of 100 Meters And At Any Lift As Per Instruction Of Mic . ( Smelter ) , Supplying And Stacking Of Crusher Dust At Jointly Identified Locations Along / Adjacent To Railway Track With All Lead & Lift Inclusive Of All Labour , T&P , Supervision Etc . Complete As Per Specification And Direction Of Mic . ( Smelter ) , Leading And Spreading Of Crusher Dust From Above Stacks In Track And Packing , Dressing Etc . At Jointly Identified Locations Inclusive All Labour , T&P , Supervision Etc . Complete As Per Specification And Direction Of Mic . ( Smelter ) , Earth Work In Excavation In Over Areas , Foundation , Trenches Or Drains Including All Labour , Tools , Tackles Etc . Complete With Dressing Of Sides / Top And Ramming Of Surfaces , At All Lead And Lift In All Kinds Of Soil , Soft Rock Along / Adjacent To Nalco Track And Land Including Disposal Of Surplus Excavated Soil & Dewatering If Required Beyond Track Area As Directed By Mic . ( Smelter ) , Renewal Of Worn-Out Rails With New Rail Including Transportation Of Materials From Nalco Stores Up To Site , Dismantling The Worn Out Rail And Fixing The New One With Drilling Required Holes , Cutting To Required Shape And Size , Fitting With All Fixtures , Lubricating , Complete With All Tools , Tackles And Labour Etc . Complete And Return Of Dismantling Materials At Nalco Stores As Per The Direction Of Mic . ( Smelter ) , Cleaning Of Grass , Weeds , Bushes Etc . Including Uprooting Of Trees Up To Girth 150Mm From Crs Track / Permanent Way And Adjacent Areas . Disposal Of The Rubbish To Designated Places Within A Lead Of 1 . 0 Km As Directed By Mic . ( Smelter ) , Transportation Of Surplus Earth /Moorum/Sand/Debris /Foreign Material/Waste Track Material Etc By Mechanical Means Including , Unloading , Levelling Etc Within A Lead Of 2 . 00 Km With All Tools , Tackcles And Labour Etc Asper Instruction Of Mic . ( Smelter ) , Maintenance Of Permanent Way ( Cpp ) , Overhauling Of Track As Per Technical Specification At Jointly Identified Locations Including Return Of Salvageable Materials At Nalco Stores With All Complete As Per The Direction Of Mic . ( Cpp ) , Through Packing Of Track As Mentioned In Technical Specification Enclosed With All Labour , T&P , Complete As Per The Direction Of Mic . ( Hilti Off Track Hand Held Tamper Te 905 With Built In Avr System Or Equivalent To Be Procured And Used For Packing ) ( Cpp ) , Supplying And Stacking Of Graded Machine Crushed Hard Granite Stone Ballast In Accordance With Is:2386 Part Iv-1963 At Jointly Identified Locations With All Lift And Lead Of Along Railway Track Inclusive Of All Labour , Supervision , Material , T&P ( Void Deduction To Arrive Net Quantity For Payment Shall Be As Per Technical Specification All Complete As Per The Direction Of Mic . ( Cpp ) , Leading Ballast From Stacks , Putting In To Track And Packing Inclusive Of All Labour , Supervision And Tools & Plant In Nalco Railway Siding Inclusing Levelling And All Leads All Complete As Per Specifications And Directions Of Mic . ( Cpp ) , Replacement Of Bridge Timber/ Steel Channel Sleeper At Jointly Identified Spots With Opening Of Ballast , Removal And Refixing Of Rails With All Fittings And Fixtures , Repacking Of Ballast Etc . Complete As Per Technical Specification With All Labour , T&P , Supervision Etc . Including Return Of Salvageable Material At Nalco Stores Complete As Per The Direction Of Mic . ( Cpp ) , Replacement Of Prestressed Concrete Sleepers At Jointly Identified Spots With Opening Of Ballast , Removal And Refixing Of Rails With All Fittings And Fixtures , Repacking Of Ballast Etc . Complete As Per Technical Specification With All Labour , T&P , Supervision Etc . Including Return Of Salvageable Material At Nalco Stores Complete As Per The Direction Of Mic . ( Cpp ) , Prestressed Concrete Turnout Sleepers Of 1 In 8 . 5 Including Coordination With East Coast Railway If Necessary Signalling And Interlocking Arrangements All Complete Including Overhauling & Thorough Packing As Per Specification And Direction Of Mic . ( Cpp ) , Earth Work In Rough Excavation , Banking Excavated Earth In Layers Not Exceeding 20Cm In Depth , Breaking The Clods , Watering , Compacting And Dressing Up In Embankments For Repair Of Cess , Formation , Roads , Flood Banks / Embankments Etc . Along / Adjacent To Nalco Track And Land Including All Labour , Tools , Tackles , Dewatering Etc . Complete With All Lead With Lift As Directed By Mic . ( Payment Shall Be Made On Borrow Area Measurement ) ( Cpp ) , Maintenance Of Level Crossing And The Approaches Including Opening Of The Level Crossing With Sleepers , Fittings , Ch