| 1 | 1 | Providing and fixing Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8-1980 and IRC:26, excavation and fixing in position in M-15 concrete, plastering the expsoed faces with C.M. 1:2, painting and printing letters, necessary reinforcements etc including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete. (precast) (i) 5th KM stone etc., complete. as per the direction of the Engineer In Charge of the work. | 1 | 9 | Each |
|---|
| 2 | 2 | Providing and fixing Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8-1980 and IRC:26, excavation and fixing in position in M-15 concrete, plastering the expsoed faces with C.M. 1:2, painting and printing letters, necessary reinforcements etc including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete. (precast) (ii) Ordinary KM stone etc., complete. as per the direction of the Engineer In Charge of the work. | 1.1 | 36 | Each |
|---|
| 3 | 3 | Providing and fixing Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8-1980 and IRC:26, excavation and fixing in position in M-15 concrete, plastering the expsoed faces with C.M. 1:2, painting and printing letters, necessary reinforcements etc including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete. (precast) (iii) Hectometer stone etc., complete. as per the direction of the Engineer In Charge of the work. | 1.2 | 176 | Each |
|---|
| 4 | 4 | Removal of earth from the choked hill side drain and disposing it on the valley side manually including cost of labour, lead, lift etc., complete MoSRT & H Specification No. 3000 etc., complete. as per the direction of the Engineer In Charge of the work. | 1.3 | 23005 | Rmtr |
|---|
| 5 | 5 | Filling potholes & patch repaires with Bituminous concrete, 40mm thick, Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, labour, hire charges of machinery, lead, lift loading, unloading stacking, transporting etc., complite except lead for Bitumen & Emulsion.. (A)Uisng 60/70 grade Bitumen mixed in HMP etc., complete. as per the direction of the Engineer In Charge of the work. | 1.4 | 127.83 | Sqm |
|---|