| 1 | 1 | Transportation of rig machine 1x2x1x50 | | 100 | kms |
|---|
| 2 | 2 | Transportation of rig T&P 1x2x1x50 | | 100 | kms |
|---|
| 3 | 3 | Loading & unloading of rig T&P 1x1x2 job | | 2 | job |
|---|
| 4 | 4 | Transportation of compresser T&P 1x2x1x50 | | 100 | kms |
|---|
| 5 | 5 | Loading & unloading of compresser T&P 1x1x2 job | | 2 | job |
|---|
| 6 | 6 | Toeing of OP unit 1x2x1x50 by trator | | 100 | kms |
|---|
| 7 | 7 | Transportation of OP unit T&P 1x2x1x50 | | 100 | kms |
|---|
| 8 | 8 | Loading & unloading of OP unit T&P 1x1x2 job | | 2 | job |
|---|
| 9 | 9 | Desmentling of rig machine and camp equpage after\ncompletion of work.\n | | 1 | job |
|---|
| 10 | 10 | Drilling bore 250 mm dia with pilot bore GL to 80 MBGL 250 mm dia bore hole | | 70 | m |
|---|
| 11 | 11 | Lowering of tubewell assembly of 200 mm dia 10\nkg/cm2 PVC pipe sharounding of Pea-Graval.\n | | 1 | m |
|---|
| 12 | 12 | 200 mm dia PVC Plain pipe | | 58 | m |
|---|
| 13 | 13 | 200 mm dia pvc slotted pipe | | 12 | m |
|---|
| 14 | 14 | 200 dia pvc well cap | | 1 | no |
|---|
| 15 | 15 | 200 mm pvc bail plug | | 1 | no |
|---|
| 16 | 16 | 200 mm dia pvc socet | | 13 | no |
|---|
| 17 | 17 | 200 mm dia MS clamp | | 1 | no |
|---|
| 18 | 18 | MS sopport gurder 4''x6\"x7' | | 1 | pair |
|---|
| 19 | 19 | Extraction of 250 mm dia. Casing pipe after lowering of\n200 mm dia. P.V.C. pipe\n | | 60 | m |
|---|
| 20 | 20 | Supply of pea Graval | | 15 | cum |
|---|
| 21 | 21 | Development of tubwell by air compresser | | 40 | hrs |
|---|
| 22 | 22 | Development of tubwell by OP unit | | 70 | hrs |
|---|
| 23 | 23 | Chemical & bacteriological testing of water sample. | | 1 | job |
|---|
| 24 | 24 | Desmentling of OP unit | | 1 | job |
|---|
| 25 | 25 | Lowering of 80 mm dia G.I. column pipe | | 51 | m |
|---|
| 26 | 26 | Cost of 12.50 HP ISI mark 8 stage submersible motor pump set copper binded 03 phase 50 cycle AC supply suitable to operate on 415+6% voltage AS PER IS8034- 1989. | | 1 | no |
|---|
| 27 | 27 | Supply of 3 phase fully automatic switch starter panel box type ISI mark suitable for 12.50 HP motor pump. | | 1 | no |
|---|
| 28 | 28 | Supply of Cu.Submerssible cable 10 mm2 3core. | | 90 | m |
|---|
| 29 | 29 | Supply of Al. round Service cable 16 mm2 4core. | | 120 | m |
|---|
| 30 | 30 | Cost of Presure & Depth gauge with 6 mm MS airline\nand other fittings\n | | 1 | job |
|---|
| 31 | 31 | Cost of valves of 80 mm size for water supply and by\npass system.\n | | 1 | set |
|---|
| 32 | 32 | Installation of Pumping Plant and fitting of Tee, bend, reflux valve with by pass system & pillar for fixing of\npower electricity starter panel.\n | | 1 | job |
|---|
| 33 | 33 | one month watch and ward during period of instalation | | 1 | job |
|---|
| 34 | 34 | Painting work | | 1 | job |
|---|
| 35 | 35 | Construction of masonary chamber,cable connection\nand misslanious work\nConstruction of masonary chamber,cable connection\nand misslanious work\n | | 1 | job |
|---|
| 36 | 36 | Add 12% GST | | 1 | no |
|---|