Maintenance And Operation Of Ht/Lt Underground Cable/Overhead Electric Supply And Assets At Tech Area Of Af Stn Jodhpur , Outsourcing The Maintenance Services Of Atc Power House Tech Area At Af Station Jodhpur As Described Below For Repair/Replacement Work To External Electrification , Repair/ Maintenance Of Installations /Equipments As Per Boq ( Schedule A ) , Notes Here-In-After , Special Conditions , Particular Specifications , Engineering Practices Including Keeping Proper Day To Day Records Of Maintenance Activities ( To Be Mentioned In Maintenance Record Register ) Etc Complete With Following Qualified Technical Staff Along With Proper Tools/Safety Measures , Own Conveyance , Transport And T&P Including Communication System For Personal Communication With Ge Office :- , Notes For Srl Item No 1 . 00 :- ( A ) Contractor Shall Employ Minimum Two Electrician For Outsourcing The Services In Each Shifts Of 8 Hours Each I . E Total Six Electricians For All Three Shifts ( 24 Hours ) Shall Be Employed . , ( B ) The Contractor Will Ensure Proper Functioning Of All Eletrical Installation Like Ht Vcb , Transformer , Lt Panels , Volage Stabilizer , , Ht/Lt Cables With Joints , Go/Do , All External Electric Supply Works As Per Site Requirement With And Including Identification Of Fault In External And Internal Electric Supply As Directed By Engineer-In-Charge And Providing Communication Facility For Lodging Complaint , Making Complaint Slips , Recording Of Daily Work Done , Getting Users Signature After Completing The Job Card/Complaint Slips And Providing Necessary Information To Engineer-In-Charge As And When Asked For . For All These , The Cost Shall Deemed To Be Included In The Quoted Rates . , ( C ) Any Complaint/Job Given By Engineer-In-Charge Telephonically And Through Complain Slip Other Then Receiving At Service Center Shall Be Attended And Rectified The Defects/Complete The Job By Duty Staff Without Any Extra Cost . , ( D ) Arrangement Shall Be Made To Attend The Complains On Holidays & Sunday Also The Cost Of This Deemed To Be Included In Quoted Rates . , ( E ) Cost Of Fixing/Refixing/Removing , Transport , Communication System , Uniform All Type Of Tools As Required Deemed To Be Included In The Rate Quoted By Tenderer . , ( F ) Any Complaint/Job Given On A Particular Day Shall Be Repaired/Rectified On Same Day . The Rate Of Recovery Against Non Attending/Completing Job On Same Day Shall Be Rs . 75/- Per Complaint Per Day . , ( G ) The Rate Of Recovery In Case Absence Of Manpower ( Electrician ) Shall Be Rs 1070/- Per Electrician Per Shift . , ( H ) Complaints Need To Be Attended And Rectified Within Stipulated Time As Directed By Engineer-In-Charge . Contractor Will Liaise , And Record Receipt Of Complaints With Complaint Team Members And With Centralized Complaint Cell And Obtain Rectification Certificate From Users , Including Stores Handling , Accounting Receipt All As Per Direction Of Engineer-In-Charge . Daily Status Of Complaint Received , Rectified And List Of Pending Complaint To Be Produced To Engineer-In-Charge In A Desired Format As Directed . , ( J ) Technician Of All Trades Shall Be Well Experienced ( Minimum 6-8 Yrs ) In The Field/Iti Qualified With ( 2-3 Yr ) Experience And Supervisor Employed By The Contractor For This Contract Shall Be Diploma Holder With Sound Knowledge Of Computer And Well Exeriance Of Electric Services Sectors All As Directed By Engineer-In-Charge . , ( K ) All Petty Small Parts Required For Repair Like Nuts , Bolts , Washers , Screws , Tapes , Grease Oil/Lubricants Copper Lugs , For Connections Etc Deemed To Be Included In The Unit Cost . Location And Place Of Complaint Attending Team Will Be As Per Expected Work Of Maintenance And Petty Repair To External Electrification In Different Area Either Building Wise Or Based On Type Of Accommodation All As Directed By Engineer-In-Charge . , ( L ) Contractor Will Provide All T&P Like Crimping Tools , 10 Kv Megger Of Fluke And Other Connecting T&P Like Clamp Meter , Multimeter , Phase Rotation Indicator Meter , 11 Kv Gloves Required For Rectification Of Fault In External And Internal Electric Supply Require For Attending All External Breakdown / Electricals Complaints . , ( M ) After Each And Every Repair / Replacement Testing Shall Be Carried Out To The Entire Satisfaction Of Engineer-In-Charge . , ( N ) It Will Be The Responsibility Of Contractor To Make The Sub Station & Power House Neat , Clean And Tidy Daily To The The Entire Satisfaction Of The Engineer-In-Charge , More Over As And When Je And Engineer-In-Charge Asked For Cleaning Of Substation And Installation It Will Be The Responsibility Of Contractor Staff On Duty To Make It Clean . It Will Be Also The Responsibility Of Contractor To Clearance Of Fault At The Time Of Tripping From Rseb After Thorougly Check Of Line . , ( O ) Dress Code Shall Be Used By Employee/Worker At Site Provided By The Contractor Showing Name Of The Firm On Left Pocket Of Apron Used In Orange Colors . It Is Mandatory To Each Employers To Provide Each Worker , Failing With 200/- Per Day Shall Levied From Contractors Due . Please Note Engineer-In-Charge Shall Closely Watch And Maintain A Record Of Each Labour At Site . , Outsourcing The Maintenance Services To Ps2 Mafi As Described Below For Repair/Replacement Work To External Electrification/Internal Electrification Of The Buildings , Including Maintenance And Repair Of Electrical Equipments As Per Boq ( Schedule A ) , Notes Here-In-After , Special Conditions , Particular Specifications , Engineering Practices Including Keeping Proper Day To Day Records Of Maintenance Activities ( To Be Mentioned In Maintenance Record Register ) Etc Complete With Following Qualified Technical Staff Along With Proper Tools/Safety Measures , Own Conveyance , Transport And T&P Including Communication System For Personal Communication With Ge Office . Notes For Srl Item No 2 . 00 :- ( A ) Contractor Shall Employ Minimum One Electrician For Outsourcing The Services In Each Shifts Of 8 Hours Each I . E Total Three Electricians For All Three Shifts ( 24 Hours ) Shall Be Employed . , ( B ) The Contractor Will Ensure Proper Functioning Of All Eletrical Installation Like Ht Vcb , Transformer , Lt Panels , Volage Stabilizer , , Ht/Lt Cables With Joints , Go/Do , All External Electric Supply Works As Per Site Requirement With And Including Identification Of Fault In External And Internal Electric Supply As Directed By Engineer-In-Charge And Providing Communication Facility For Lodging Complaint , Making Complaint Slips , Recording Of Daily Work Done , Getting Users Signature After Completing The Job Card/Complaint Slips And Providing Necessary Information To Engineer-In-Charge As And When Asked For . For All These , The Cost Shall Deemed To Be Included In The Quoted Rates . , ( C ) Any Complaint/Job Given By Engineer-In-Charge Telephonically And Through Complain Slip Other Then Receiving At Service Center Shall Be Attended And Rectified The Defects/Complete The Job By Duty Staff Without Any Extra Cost . , ( D ) Arrangement Shall Be Made To Attend The Complains On Holidays & Sunday Also The Cost Of This Deemed To Be Included In Quoted Rates . , ( E ) Cost Of Fixing/Refixing/Removing , Transport , Communication System , Uniform All Type Of Tools As Required Deemed To Be Included In The Rate Quoted By Tenderer . , ( F ) Any Complaint/Job Given On A Particular Day Shall Be Repaired/Rectified On Same Day . The Rate Of Recovery Against Non Attending/Completing Job On Same Day Shall Be Rs . 75/- Per Complaint Per Day . , ( G ) The Rate Of Recovery In Case Absence Of Manpower ( Electrician ) Shall Be Rs 1070/- Per Electrician Per Shift . , ( H ) Complaints Need To Be Attend