Cmc Of Installed Medical Gas Pipeline System In Trauma Centre Rims , Ranchi , Operation And Maintenance Of Medical Gas Equipment , Pipeline For Internal Supply Of Medical Gases And Other Allied Works Installed At Trauma Centre Including Oxygen Pipeline With Alarm , Control Panel , Oxygen Bank Assembly , N2o Gas Pipeline , Control Panel , N2o Bank Assembly , Central Vacuum Pipeline System , Compressed Air System , Electrical Panel For Vacuum And Compresser . , 1St Year Cmc Charges , 2Nd Year Cmc Charges , 3Rd Year Cmc Charges , 4Th Year Cmc Charges , 5Th Year Cmc Charges , Spares , Outlet Complete For O2 , Outlet Complete For Vacuum , Outlet Complete For Air , Outlet Complete For N2o , Bed Head Panel With Rail System And Mounting , Bpc Flow Meter 0-15 Lpm W/O Humidifier Bottle , Humidifier Bottle W/Cap , Unit Ward Vacuum With 600Ml Collection Jar , Tube For Suction Lp Local/Meter , Hp Non Compressed Tube For N2o , O2 , Air And Vacuum Per Meter , Medical Grade Copper Pipe 12Mm , Medical Grade Copper Pipe 15Mm , Medical Grade Copper Pipe 22Mm , Medical Grade Copper Pipe 28Mm , Medical Grade Copper Pipe 35Mm , Medical Grade Copper Pipe 42Mm , Medical Grade Copper Pipe 54Mm , Ball Valve With Adaptor 12Mm , Ball Valve With Adaptor 15Mm , Ball Valve With Adaptor 22Mm , Ball Valve With Adaptor 28Mm , Ball Valve With Adaptor 35Mm , Ball Valve With Adaptor 42Mm , Ball Valve With Adaptor 54Mm , Labour Charges Extra For Extension Work Of O2 , N2o , Vacuum And Compressed Air Pipeline ( To Be Quoted In Per Mtr Along With Complete Accessories Per Point , Up Gradation Of The Systems , Upgradation Of Compressed Air System , Upgradation Of Vacuum System , Upgradation Of Duplex Cascading Electrical Control Panel