Removal , Supply , Installation And Commissioning Of Electrolyte Preparation Equipments For Augmentation Of Energy Block ( Building 7 Extension ) At Nd ( V ) , Removal Of Following Electrolyte Preparation Equipment On Buy Back Offer , 03 In Nos Glass-Lined Reactors , 02 Nos Dosing Tanks , 01 No Pit Tnank And Associated Services Lines As Specified In Para 1 ( A ) ( I ) Of Part Ii Of Rfp , 02 In Nos Glass Lined Electrolyte Collector , 01 No Glass Lined Acid Collector , Associated Service Lines And Glass Lined Valves And Other Accessories As Specified In Para 1 ( A ) ( Ii ) Of Part Ii Of Rfp , Supply , Installation And Commissioning Of Electrolyte Preparation Equipment Comprising Of Following Items , 6300L Glass Lined Reactorss As Specified In Para 1 ( B ) ( I ) Of Part Ii Of Rfp , 160L Glass Lined Dosing Tank As Specified In Para 1 ( B ) ( Ii ) Of Part Ii Of Rfp , 500L Glass Lined Pit Tank As Specified In Para 1 ( B ) ( Iii ) Of Part Ii Of Rfp , Glass Lined Electrolyte Collectors Of Capacity 8000L Each As Specified In Para 1 ( B ) ( Iv ) Of Part Ii Of Rfp , Glass Lined Acid Collector Of 8000L Capacity As Specified In Para 1 ( B ) ( V ) Of Part Ii Of Rfp , Acid System Piping Between Acid Collector ( Incl . Pouring Basin & Pit Tank ) , Dosing Tank And Reactorsas Specified In Para 1 ( B ) ( Vi ) Of Part Ii Of Rfp , Glass Lined Electrolyte System Piping Between Electrolyte Collectors , Gravity Tank Through Etcr Pumps As Specified In Para 1 ( B ) ( Vii ) Of Part Ii Of Rfp , Interconnection Between Acid System And Electrolyte System And Connection To Drain As Specified In Para 1 ( B ) ( Viii ) Of Part Ii Of Rfp , Compressed Air System Including Pipe Line , Ss 316 L Including Valves And Pressure Regulator And End Connection As Specified In Para 1 ( B ) ( Ix ) Of Part Ii Of Rfp , Dm Water Piping . Moc - Hdpe Including Ptfe Lined Valves As Specified In Para 1 ( B ) ( X ) Of Part Ii Of Rfp , Electrolyte Chemical Resistance Pumps With 10Hp Motor And Starter As Specified In Para 1 ( B ) ( Xi ) Of Part Ii Of Rfp , 40Hp Lp Air Compressor And Accessories As Specified In Para 1 ( B ) ( Xii ) Of Part Ii Of Rfp , Erection , Testing And Commissioning Charges For Above Including Civil Works . As Specified In Para 1 ( B ) ( Xiii ) Of Part Ii Of Rfp , Standard Accessories Items 2 . 01 To 2 . 13 ( Refer To Para 8 Of Part Ii ) , Two Years Operation & Maintenance Spares Items 2 . 01 To 2 . 13 ( Refers To Para 9 Of Part Ii ) , Special Maintenance Tools And Test Equipment Items 2 . 01 To 2 . 13 ( Refers To Para 10 Of Part Ii ) , Technical Literature / Certificates / Documentation Items 2 . 01 To 2 . 13 ( Refers To Para 11 Of Part Ii ) , Acceptance , Testing , Trials And Commissioning Charges Items 2 . 01 To 2 . 13 ( Refers To Para 12 Of Part Ii ) , Training Items 2 . 01 To 2 . 13 ( Refers To Para 14 Of Part Ii ) , Any Other Item Such As Transportation , Insurance , Freight , Packing Etc Items 2 . 01 To 2 . 13