| 1 | 1 | Fabrication jobs | | | |
|---|
| 2 | 1.001 | PIPE LINES [M.S./ G.I.] Dismantling up to12'' including bends, reducers, flanges etc. | 1 | 1 | per inch dia/ feet length |
|---|
| 3 | 1.002 | PIPE LINES [M.S./ G.I.] Erection up to 2\" dia. | 2 | 1 | -do- |
|---|
| 4 | 1.003 | PIPE LINES [M.S./ G.I.] - do- above 2\" to 12\" dia. | 3 | 1 | -do- |
|---|
| 5 | 1.004 | Dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) | 4 | 1 | -do- |
|---|
| 6 | 1.005 | M.S Pipe line above 12\" dia. Dismantling | 5 | 1 | -do- |
|---|
| 7 | 1.006 | M.S Pipe line above 12\" dia. Fabrication | 6 | 1 | -do- |
|---|
| 8 | 1.007 | M.S Pipe line above 12\" dia. Erection | 7 | 1 | -do- |
|---|
| 9 | 1.008 | Dismantling of flanges/ Blind for reuse | 8 | 1 | per inch dia/ pc. |
|---|
| 10 | 1.009 | Refitting of old flanges/Blind[reuse] new | 9 | 1 | -do- |
|---|
| 11 | 1.01 | Fabrication of flanges/Blind from M. S. Plate | 10 | 1 | -do- |
|---|
| 12 | 1.011 | Valves Dismantling & fitting up to 6\" Size | 11 | 1 | per inch dia/ pc. |
|---|
| 13 | 1.012 | Valves Dismantling & fittingfrom 7\" to 12'' Size | 12 | 1 | -do- |
|---|
| 14 | 1.013 | Valves Dismantling & fitting above 12\" Size | 13 | 1 | -do- |
|---|
| 15 | 1.014 | Dismantling & fitting of MS fabricated right angle/ globe valve of size more than 12\" size | 14 | 1 | -do- |
|---|
| 16 | 1.015 | Dismantling & fitting of C.I. pipe &accessories | 15 | 1 | Per inch dia/ft. length |
|---|
| 17 | 1.016 | Dismantling& fitting of S.S.Pipe & accessories. | 16 | 1 | -do- |
|---|
| 18 | 1.017 | Dismantling of MS bend, Tee, nipple, reducer above 12\" | 17 | 1 | -do- |
|---|
| 19 | 1.018 | Fabrication of MS bend, tee, nipple, reducer above 12\" | 18 | 1 | - do - |
|---|
| 20 | 1.019 | Erection of MS bend, tee, nipple, reducer above 12\" | 19 | 1 | - do - |
|---|
| 21 | 1.02 | Dismantling, Fab. & Erection of M.S./S.S. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) | 20 | 1 | per inch dia/ feet length |
|---|
| 22 | 1.021 | Dismantling, Fab. & Erection of M.S. Plate jobs (tanks, gutters, chutes Pipe rolling, Boiler ducting etc.) | 21 | 1 | PMT |
|---|
| 23 | 1.022 | Dis./fab./erection of internal structure of wet scrubber. | 22 | 1 | Lump sum |
|---|
| 24 | 1.023 | Dismantling of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) | 23 | 1 | PMT |
|---|
| 25 | 1.024 | Fabrication of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) | 24 | 1 | PMT |
|---|
| 26 | 1.025 | Erection of Structure work (Staging, columns,trusses & pipes support, purline, new platform etc.) | 25 | 1 | PMT |
|---|
| 27 | 1.026 | Repairing of old platform dismantling,fab.&erection | 26 | 1 | Per sq. Meter. |
|---|
| 28 | 1.027 | Dismantling, fab. & Erection of railing | 27 | 1 | Per meter length. |
|---|
| 29 | 1.028 | Patch work upto 4 sq. ft. max. | 28 | 1 | Per sq. feet. |
|---|
| 30 | 1.029 | Patch work above 4 sq. ft. Welding work ( Two round ) | 29 | 1 | per feet length |
|---|
| 31 | 1.03 | Dismantling, Fab. & Erection of plumber blocks holding structure (complete) for tail shafts of rake type carriers, B.E. & B.C. | 30 | 1 | Each |
|---|
| 32 | 1.031 | Dismantling & erection of chain roller covering runners at bends of troughs including ribs. | 31 | 1 | per mtr length |
|---|
| 33 | 1.032 | Dismantling, Fab. & Erection of M.S. side & bottom Plate jobs (Rake carrier, CC,BE,BC,RBC trough,Donnelly chute, Fibrizor, cane leveller, kicker, juice screen box, juice screen tray, bagacillo casing etc. | 32 | 1 | Per sq. mtr. |
|---|
| 34 | 1.033 | Fabrication & erection of new discharge chute for mill no. 1,2 & 3 | 33 | 1 | Per chute |
|---|
| 35 | 1.034 | Fabrication & erection of new discharge chute for mill no. 4. | 34 | 1 | Per chute |
|---|
| 36 | 1.035 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of runners of various chain. | 35 | 1 | per mtr length |
|---|
| 37 | 1.036 | Rake carrier, C.C., B.E., B.C., R.B.C Troughs, Donnelly chute - Dismantling & fitting of side angles | 36 | 1 | -do- |
|---|
| 38 | 1.037 | Shifting of cane carrier trough side plate about 25 mm towards outside & alignment to avoid wear & tear of side plates | 37 | 1 | Per mtr length |
|---|
| 39 | 1.038 | To shift cane carrier runner beam according to alignment | 38 | 1 | per mtr length |
|---|
| 40 | 1.039 | Dismantling& erection of cane carrier runner beam | 39 | 1 | per mtr length |
|---|
| 41 | 1.04 | Fabrication & erection of top cover gear & pinion guard for cane carrier | 40 | 1 | each |
|---|
| 42 | 1.041 | Rake carrier, C.C., B.E., B.C., R.B.C - Fabrication & erection of tail end sprocket wheel | 41 | 1 | each |
|---|
| 43 | 1.042 | Fabrication & erection of Maceration water tray at 4th mill | 42 | 1 | per tray |
|---|
| 44 | 1.043 | Fabrication & erection of imbibition juice tray for mill no. 1,2 | 43 | 1 | per tray |
|---|
| 45 | 1.044 | Dismantling , fabrication & erection of imbibition juice distributor | 44 | 1 | each |
|---|
| 46 | 1.045 | Fabrication of MS cover for mill bottom bearing (Journal size dia- 430mmx540mm) | 45 | 1 | per pc. |
|---|
| 47 | 1.046 | Cane Unloaders - Dismantling of square bar (size-2\") runner . | 46 | 1 | per mtr |
|---|
| 48 | 1.047 | Cane Unloaders - Fitting of square bar size 2” runner at cane unloader | 47 | 1 | per mtr |
|---|
| 49 | 1.048 | Cane Unloaders - Fabrication & fitting of M.S. Plate 10 mm thk. (appx.) at cane unloaders 300 mm gantary channel | 48 | 1 | per mtr |
|---|
| 50 | 1.049 | Cane Unloaders-To provide horizontal support of gantary beam with vertical column using channel piece 100 mmx1.3 M length | 49 | 1 | per support |
|---|
| 51 | 1.05 | Cane Unloaders- To provide vertical support of gantary beam (200 mm) using channel piece 150 mmx780 mm length | 50 | 1 | per support |
|---|
| 52 | 1.051 | Cane Unloaders- Dismantling, Fab. & Erection of gantary (span 10 meters) | 51 | 1 | per gantary |
|---|
| 53 | 1.052 | Erection of new I-beam 200 mm between 24 meters span at cane unloaders for chain blocks | 52 | 1 | each |
|---|
| 54 | 1.053 | Cleaning, welding of cane unloader bridge wheel | 53 | 1 | per wheel |
|---|
| 55 | 1.054 | Cleaning, welding of cane unloader trolley wheel | 54 | 1 | per wheel |
|---|
| 56 | 1.055 | Fab & erection of new Donnelly chute | 55 | 1 | per chute |
|---|
| 57 | 1.056 | Replacement of side boxes (dis.,fab/erection) for runners at rack carrier troughs | 56 | 1 | per mtr |
|---|
| 58 | 1.057 | Dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. | 57 | 1 | per mtr running length |
|---|
| 59 | 1.058 | Dismantling, fabrication and erection of beds (for reduction gear and motor) | 58 | 1 | per bed |
|---|
| 60 | 1.059 | Bagacillo screens fabrication & erection. | 59 | 1 | P. piece |
|---|
| 61 | 1.06 | Dismantling of bagassecillo screens | 60 | 1 | P. piece |
|---|
| 62 | 1.061 | Fabrication of crown pinion gear guard | 61 | 1 | per piece |
|---|
| 63 | 1.062 | Repair of transmission gear guard. | 62 | 1 | Per sq. mtr. |
|---|
| 64 | 1.063 | Fabrication and erection of transmission gear guard top cover | 63 | 1 | per pc. |
|---|
| 65 | 1.064 | Fabrication and erection of transmission gear guard bottom cover | 64 | 1 | per pc. |
|---|
| 66 | 1.065 | Fabrication and erection of transmission gears bed | 65 | 1 | per mtr length |
|---|
| 67 | 1.066 | Strengthening of Mill House crane bridge structure with 6 mm thk .MS plate between upper & lower beam | 66 | 1 | per sq. Ft |
|---|
| 68 | 1.067 | Fabrication of D.S.M. screens juice boxes. | 67 | 1 | per box |
|---|
| 69 | 1.068 | Hard facing of trash plates teeth side and top surface. | 68 | 1 | per trash plate |
|---|
| 70 | 1.069 | Dis,fab& erection of scroll of screw conveyor for DSM screen | 69 | 1 | per pc. |
|---|
| 71 | 1.07 | Fabrication & erection of complete casing of screw conveyor | 70 | 1 | per pc. |
|---|
| 72 | 1.071 | Replacement of bottom juice collecting tray of DSM screw conveyor casing (Dis,fab& erection) | 71 | 1 | LS |
|---|
| 73 | 1.072 | TUFR - Build up of existing TUFR tips with M.S. Electrodes | 72 | 1 | per roller |
|---|
| 74 | 1.073 | TUFR - Hardfacing of existing of TUFR tips | 73 | 1 | per roller |
|---|
| 75 | 1.074 | Through out welding except holes of Mills TUFR shell | 74 | 1 | -do- |
|---|
| 76 | 1.075 | Fabrication and erection of mill juice tray alongwith discharge pipe. | 75 | 1 | Per tray |
|---|
| 77 | 1.076 | Fabrication,erection& commissioning of bagasse drier at 4th Mill’s discharge chute complete including staging,bed,alignmentetc, | 76 | 1 | LS |
|---|
| 78 | 1.077 | Cleaning, welding & grinding of teeth sprockets as per profile - Sprocket C.C./B.C. | 77 | 1 | per sprocket |
|---|
| 79 | 1.078 | Cleaning, welding & grinding of teeth of sprockets as per profile - Rack carrier sprocket | 78 | 1 | per sprocket |
|---|
| 80 | 1.079 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 22 teeth under feed roller drive (one side of teeth) | 79 | 1 | per pinion |
|---|
| 81 | 1.08 | Cleaning, welding & grinding of teeth of pinion as per profile - Pinion 17 teeth of under feed roller (one side) | 80 | 1 | per pinion |
|---|
| 82 | 1.081 | Chevron groove cutting in rollers. | 81 | 1 | each |
|---|
| 83 | 1.082 | Cane carrier to be covered with 3mm M.S. plate on top upto desired length with hinges and angles bolted | 82 | 1 | per mtr running length of CC |
|---|
| 84 | 1.083 | Blower fan with alignment Fabrication, errection & commissioning. | 83 | 1 | per fan |
|---|
| 85 | 1.084 | Fabrication & erection of donnellychute top cover folding type | 84 | 1 | each |
|---|
| 86 | 1.085 | Blower Fan Casing - dismantling,fab,erection | 85 | 1 | per casing |
|---|
| 87 | 1.086 | Dismantling, fabrication & erection of Bagacillopipe from bagacillo to vacuum filter | 86 | 1 | per inch/mtr |
|---|
| 88 | 1.087 | Dismantling, fitting & hydraulic testing of S.S. Tubes (Semi-kestnner, juice heaters ) | 87 | 1 | per tube |
|---|
| 89 | 1.088 | Dismantling, fitting & hydraulic testing of S.S. Tubes (vapour cell & evaporator bodies) | 88 | 1 | per tube |
|---|
| 90 | 1.089 | Dismantling, fitting & hydraulic testing of S.S /Brass tubes ( pans ) | 89 | 1 | -do- |
|---|
| 91 | 1.09 | Dismantling, fabrication & erection of Pan and quad down take | 90 | 1 | LS |
|---|
| 92 | 1.091 | Dismantling, fab. & erection of Pan and Quad calanderia jacket. | 91 | 1 | Per sq. mtr. |
|---|
| 93 | 1.092 | Dismantling of up to 4 \" pump & 15 HP motor. | 92 | 1 | Per inch dia/HP |
|---|
| 94 | 1.093 | Erection of up to 4 \" pump & 15 HP motor. | 93 | 1 | Per inch dia/ HP |
|---|
| 95 | 1.094 | Dismantling of 4” to 8” pump & 15 to 40 H.P.Motor | 94 | 1 | per inch dia/hp |
|---|
| 96 | 1.095 | Erection of 4” to 8” pump & 15 to 40 H.P.Motor | 95 | 1 | per inch dia/ hp |
|---|
| 97 | 1.096 | Dismantling of above 8” pump & above 40 H.P.Motor | 96 | 1 | per inch dia/ hp |
|---|
| 98 | 1.097 | Erection of above 8” pump & above 40 H.P.Motor | 97 | 1 | per inch dia/ hp |
|---|
| 99 | 1.098 | Dismantling of G.I./ A.C.C. Sheet | 98 | 1 | per sq. ft |
|---|
| 100 | 1.099 | Fitting (Erection) of G.I./ A.C.C. Sheet | 99 | 1 | per sq. Ft. |
|---|
| 101 | 1.1 | Dismantling of water gutter & ridge | 100 | 1 | Per running feet |
|---|
| 102 | 1.101 | Erection of water gutter & ridge | 101 | 1 | Per running feet |
|---|
| 103 | 1.102 | Dismantling, fabrication, erection of Sulphur furnace complete | 102 | 1 | LS each |
|---|
| 104 | 1.103 | Dismantling, fab. & erection of the Melter/ receiver of Sulphur furnace. | 103 | 1 | per pc. |
|---|
| 105 | 1.104 | Dismantling, fabrication & erection of Shell of Sulphur furnace | 104 | 1 | per shell |
|---|
| 106 | 1.105 | Dismantling, fabrication & erection of scrubber of sulphur furnace | 105 | 1 | Per M.T. |
|---|
| 107 | 1.106 | Dismantling , fabrication & erection of steam jacket of sulphur furnace | 106 | 1 | per pc. |
|---|
| 108 | 1.107 | Dismantling, fabrication, erection of Sulphur furnace cooler | 107 | 1 | LS each |
|---|
| 109 | 1.108 | Dismantling, Fabrication & erection of the Bottom portion of weight juice tank with MS plates | 108 | 1 | Per M.T. |
|---|
| 110 | 1.109 | Dismantling, Fabrication & erection of the Scrappers of Dorr clarifier with MS plates | 109 | 1 | PMT |
|---|
| 111 | 1.11 | Dismantling, Fabrication & erection of the Catcher bottle of Vac. Filter with MS plates | 110 | 1 | PMT |
|---|
| 112 | 1.111 | Dismantling, Fabrication & erection of the Bottom of Dorr clarifier with MS plates | 111 | 1 | PMT |
|---|
| 113 | 1.112 | Dismantling, Fabrication & erection of the Mud tray of Vac. Filter with MS plates | 112 | 1 | -do- |
|---|
| 114 | 1.113 | Dismantling, Fabrication & erection of the Mud tank bottom of vac. Filter with MS plates | 113 | 1 | PMT |
|---|
| 115 | 1.114 | Dismantling, Fabrication & erection of the Conical portion of juice/ water/ mud tank with MS plates | 114 | 1 | per sq mtr |
|---|
| 116 | 1.115 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Pans | 115 | 1 | Per M.T. |
|---|
| 117 | 1.116 | Dismantling, Fabrication & erection of MS plates of Pan station - Pan tops | 116 | 1 | -do- |
|---|
| 118 | 1.117 | Dismantling, Fabrication & erection of MS plates of Pan station - Saveall | 117 | 1 | per save all |
|---|
| 119 | 1.118 | Dismantling, Fabrication & erection of MS plates of Pan station - Shell of Vac. Crystallizer | 118 | 1 | PMT |
|---|
| 120 | 1.119 | Dismantling, Fabrication & erection of MS plates of Pan station Bottom plates of Syrup & molasses tanks & conditioners | 119 | 1 | PMT |
|---|
| 121 | 1.12 | Dismantling, Fabrication & erection of MS plates of Pan station Side plates of Syrup & molasses tanks & conditioners | 120 | 1 | PMT |
|---|
| 122 | 1.121 | Dismantling, Fabrication & erection of MS plates of Pan station Pan shell strengthening work with MS channels/ angles/ MS plate rings | 121 | 1 | per pan |
|---|
| 123 | 1.122 | Dismantling, Fabrication & erection of MS plates of Pan station Top cone strengthening work with MS channels/ angles/ MS plate rings | 122 | 1 | per cone |
|---|
| 124 | 1.123 | Dismantling, Fabrication & erection of MS plates of Pan station Strengthening of vapour line by inner side supporting of angles/ pipes | 123 | 1 | per vapour line |
|---|
| 125 | 1.124 | Dismantling, fab. & erection of coils of horizontal crystallizers | 124 | 1 | Per inch dia/ feet length |
|---|
| 126 | 1.125 | Dismantling of shaft of crystallizers | 125 | 1 | per inch dia/ ft length |
|---|
| 127 | 1.126 | Fabrication of shaft of crystallizers | 126 | 1 | Per inch dia./ feet length |
|---|
| 128 | 1.127 | Erectionof shaft of crystallizers | 127 | 1 | Per inch dia./ feet length |
|---|
| 129 | 1.128 | Replacement of 3” MS coils (including bends, flange, etc.) of Vertical crystallizers | 128 | 1 | per inch dia/ ft length |
|---|
| 130 | 1.129 | Dismantling, fab. & erection of arms of A- crystallizers | 129 | 1 | PMT |
|---|
| 131 | 1.13 | Replacement of coils of Dorr & evaporator bodies - Juice coils (Dismantling, Fab. & erection) | 130 | 1 | per inch dia per ft length |
|---|
| 132 | 1.131 | Replacement of coils of Dorr & evaporator bodies - Ammonia & gas coils (Dismantling, Fab. & erection) | 131 | 1 | per inch dia/feet length |
|---|
| 133 | 1.132 | Replacement of weak MS plates & cooling coils of Molasses tanks Bottom plates | 132 | 1 | PMT |
|---|
| 134 | 1.133 | Replacement of weak MS plates & cooling coils of Molasses tanks Side plates upto height 10mtr | 133 | 1 | PMT |
|---|
| 135 | 1.134 | Replacement of weak MS plates & cooling coils of Molasses tanks Top cone plates with supports | 134 | 1 | PMT |
|---|
| 136 | 1.135 | Replacement of weak MS plates & cooling coils of Molasses tanks Cooling coils | 135 | 1 | per inch dia per ft length |
|---|
| 137 | 1.136 | Dismantling, fabrication, erection of MS pipe coil fitting at various station | 136 | 1 | per inch dia per ft length |
|---|
| 138 | 1.137 | Fabrication of Drum internal plates of boiler | 137 | 1 | per pc. |
|---|
| 139 | 1.138 | Dismantling, fabrication and erection of expansion joints of boiler | 138 | 1 | LS per expansion joint |
|---|
| 140 | 1.139 | Dismantling of Existing transient Heaters | 139 | 1 | per pc. |
|---|
| 141 | 1.14 | Shifting of new transient heater at Site | 140 | 1 | per piece |
|---|
| 142 | 1.141 | Erection of new/ existing transient heaters | 141 | 1 | -do- |
|---|
| 143 | 1.142 | Dismantling/ Fab./ Erection of weak portion of partition plates of juice heaters | 142 | 1 | LS per juice heater |
|---|
| 144 | 1.143 | Dis./ Repairing/ Fabrication & erection of Bagasse belt conveyor on turnkey basis | 143 | 1 | LS |
|---|
| 145 | 1.144 | Dismantlingofspurgar of juice sulphitor for cleaning | 144 | 1 | per pc. |
|---|
| 146 | 1.145 | Fabricationofspurgar of juice sulphitor for cleaning | 145 | 1 | per pc. |
|---|
| 147 | 1.146 | Erection/refitting.ofspurgar of juice sulphitor for cleaning | 146 | 1 | Per piece |
|---|
| 148 | 1.147 | Dis, fab & erection of stainer of injection pump/spray pump | 147 | 1 | per pc. |
|---|
| 149 | 1.148 | Injection channel jail dismantling, fab. & erection. | 148 | 1 | per jali |
|---|
| 150 | 1.149 | Repairing of agitator of vaccum filter dismantling, fab. & erection. | 149 | 1 | per agiattor |
|---|
| 151 | 1.15 | Fabrication of sweeper trolly | 150 | 1 | per pc. |
|---|
| 152 | 1.151 | Repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape | 151 | 1 | Lump sump |
|---|
| 153 | 1.152 | ETP middle shaft repairing/ replacement | 152 | 1 | LS |
|---|
| 154 | 1.153 | Fab of new lime tank with its shaft, stirer etc. at ETP | 153 | 1 | -do- |
|---|
| 155 | 1.154 | Dismantling, fab & erection of save all of evaporator bodies | 154 | 1 | per save all |
|---|
| 156 | 1.155 | Replacement of juice sulphiter top | 155 | 1 | LS |
|---|
| 157 | 1.156 | Dismantling of vibro screen | 156 | 1 | per screen |
|---|
| 158 | 1.157 | Fabriaction of vibro screen | 157 | 1 | per screen |
|---|
| 159 | 1.158 | Erection of vibro screen | 158 | 1 | per screen |
|---|
| 160 | 1.159 | Repairing/ replacement of shell of sugar melter | 159 | 1 | PMT |
|---|
| 161 | 1.16 | Replacement of shaft of sugar melter | 160 | 1 | per inch dia per ft length |
|---|
| 162 | 1.161 | Replacemnet of arm of sugar melter | 161 | 1 | per ft length |
|---|
| 163 | 1.162 | Stair case ( With chequared plate) - Dismentling | 162 | 1 | per stair |
|---|
| 164 | 1.163 | Stair case ( With chequared plate) - Fabrication | 163 | 1 | -do- |
|---|
| 165 | 1.164 | Stair case ( With chequared plate) - Erection | 164 | 1 | -do- |
|---|
| 166 | 1.165 | Labour supply (per day 8 hours basis) - Fitter | 165 | 1 | per person |
|---|
| 167 | 1.166 | Labour supply (per day 8 hours basis) - Welder | 166 | 1 | -do- |
|---|
| 168 | 1.167 | Labour supply (per day 8 hours basis) - Helper | 167 | 1 | per person |
|---|
| 169 | 1.168 | Labour supply (per day 8 hours basis) - Khalasi | 168 | 1 | per person |
|---|
| 170 | 1.169 | Juice heater cover dismantling, fab. & erection | 169 | 1 | each |
|---|
| 171 | 1.17 | Juice heater Refitting with testing by pump. | 170 | 1 | -do- |
|---|
| 172 | 1.171 | Sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. | 171 | 1 | LS |
|---|
| 173 | 1.172 | dismantling, fabrication, erection of stainer of injection and spray pump | 172 | 1 | Lump sum each |
|---|
| 174 | 1.173 | Stair case at sugar bin fabrication & erection. | 173 | 1 | LS each |
|---|
| 175 | 1.174 | Vaccum crystallizer shell fabrication,erection& patch. | 174 | 1 | LS each |
|---|
| 176 | 1.175 | New planatory gear boxes for B massecuite crystallizer. | 175 | 1 | per unit Lump sum |
|---|
| 177 | 1.176 | F.D. old impeller is to be removed and new is to be fitted and trial. | 176 | 1 | LS |
|---|
| 178 | 1.177 | Straightening of old pipe line of thickness 6-8mm into plain sheet by rolling machine | 177 | 1 | PMT |
|---|
| 179 | 1.178 | To provide slidde gate at B.C. Or desired size with rack &pinion. | 178 | 1 | per gate |
|---|
| 180 | 1.179 | To provide a tapering suit under idler of B.C. To remove the falling bagasse in bagasse year. | 179 | 1 | Lump sum |
|---|
| 181 | 1.18 | Pan No. 4 mechanical circulator is to be dismantled and parts to be shifted to W | 180 | 1 | per tail pipe |
|---|
| 182 | 1.181 | Pan No. 4 mechanical circulagtoris to be dismantled and parts to be shifted to Workshop for machining. After machining the same circulator parts to be fitted and trial. | 181 | 1 | L. S. |
|---|
| 183 | 1.182 | Pan/quad condenser tail pipe double support is to be provided with atleast L 3”/pipe 2.1/2” with clamp system. | 182 | 1 | per tail pipe |
|---|
| 184 | 1.183 | Rori melter is to be fabricated and erected as per drg. | 183 | 1 | L.S. |
|---|
| 185 | 1.184 | Replacement of ID fan ducting & casing. | 184 | 1 | per sq mtr |
|---|
| 186 | 1.185 | SS condenser repairing by support to be given by rings | 185 | 1 | L.S. each. |
|---|
| 187 | 1.186 | Clear juice filter arrangement by jali fitting - dismantling, fabrication, erection | 186 | 1 | LS each |
|---|
| 188 | 1.187 | Dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. | 187 | 1 | LS each column |
|---|
| 189 | 1.188 | Juice heater header partition plate top & bottom both side - dismantling, fabrication, erection | 188 | 1 | LS each header |
|---|
| 190 | 1.189 | Oliver filter tray dismantling, fabrication, erection | 189 | 1 | LS each |
|---|
| 191 | 1.19 | Centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam | 190 | 1 | per running ft |
|---|
| 192 | 1.191 | Dismantling, erection of SS tail pipe at pan & quad condenser | 191 | 1 | per pipe |
|---|
| 193 | 1.192 | Dismantling, fabrication, erection tail pipe support angle channel | 192 | 1 | each tail pipe |
|---|
| 194 | 1.193 | Dismantling, fabrication, erectionof complete Pug Mill for continuous machine B- massecuite.v | 193 | 1 | each pug mill |
|---|
| 195 | 1.194 | Repairing of bottom portion of hot water tank replacement | 194 | 1 | Lump sump each. |
|---|
| 196 | 1.195 | Dismantling, fabrication, erection of Sulphur furnace no. 2, complete scrubber with its internal pipes. | 195 | 1 | Lump sump each. |
|---|
| 197 | 1.196 | Dismantling, fabrication, erection of Sulphur furnace no. 3 (Lime side) complete scrubber with its internal pipes. | 196 | 1 | Lump sump each. |
|---|
| 198 | 1.197 | SF melter and receiver steam jacket and its coil | 197 | 1 | Lump sump each. |
|---|
| 199 | 1.198 | Dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter | 198 | 1 | Lump sump each. |
|---|
| 200 | 1.199 | Dismantling, fabrication, erection of save all at spare body of quad | 199 | 1 | Lump sump each. |
|---|
| 201 | 1.2 | Dismantling of Condensate pit | 200 | 1 | Lump sump each. |
|---|
| 202 | 1.201 | Dismantling, fabrication and erection of top and shell of Quad body | 201 | 1 | Lump sump each. |
|---|
| 203 | 1.202 | Dismantling, fabrication and erection of Wt. juice tank | 202 | 1 | Lump sump each. |
|---|
| 204 | 1.203 | Dismantling, fabrication and erection of Maceration water tank | 203 | 1 | Lump sump each. |
|---|
| 205 | 1.204 | Dismantling, fabrication and erection of feed water tank | 204 | 1 | Lump sump each. |
|---|
| 206 | 1.205 | Dismantling, fabrication and erection of wet scrubber | 205 | 1 | Lump sump each. |
|---|