Ss Duplex Bundle Replacement Jobs In Pant-212 ( Isom ) During Plant-212 Idle Shutdown , 2021 At Cpcl-Manali Ss Duplex Bundle Replacement Jobs In Pant-212 ( Isom ) During Plant-212 Idle Shutdown , 2021 At Cpcl-Manali , Part - A - Lumpsum Jobs , Part - A - Lumpsum Jobs: Lumpsum Rate For Carrying Out Maintenance Activities On The Following Equipments As Per The Enclosed Scope Of Work , Detailed Work Package And As Per All Other Annexures . Refer Work Package For List Of Jobs Excluded From Lumpsum Scope . , Exchanger Maintenance Jobs , 212-E-14 Heartcut Naptha Trim Cooler . , 212-E-16 Recycle Trim Cooler . , 212-E-30 Lean Oil Trim Cooler . , 212-E-56 Refrigerant Condenser . , 212-E-12 Heartcut Naptha Splitter Condenser . , 212-E-21 Isom Stabilizer Trim Condenser . , 212-E-31 Lpg Stripper Condenser . , 212-E-11 Amake-Up Comp Int St Cooler . , 212-E-11 Bmake-Up Comp Int St Cooler . , 212-E-15 C7+ Cut Naphtha Cooler . , 212-E-06 Raector Effluent Trim Cooler . , 212-E-09 Nhdt Stripper Over Head Trim Condenser . , Part - B - Unit Rate Jobs , Part - B - Unit Rate Jobs , Supply , Erection & Dismantling Of Steel Scaffolding: For External Purpose - Insulation Removal , Thickness Gauging , Ndt Jobs< / > < / > The Job Includes Supply , Transportaiton Of Scaffolding Materials Is In Contractors Scope Of Supply , Erection Of Scaffolding At Site Covering The Areas Specified Including Providing Vertical Posts Of Pipes At Inter Distance Of 1 . 5M And Horizontal Numbers At A Inter Distance Of 0 . 5 To 0 . 75 Meter , Providing Rods At Corners To Give Sufficient Strength To The Structure , Placing The Steel Planks / Frp Gratings On Top For Making Sufficient Area . Dismantling Scaffolding After Completion Of Job . Necessary Quantity Of Scaffolding Pipes At Various Lengths , Rolling / Fixed Clamps , Metal Jolley Including All Tools , Tackles , Consumables , Labours And Contractors Supervision To Be Mobilised For Completion Of The Jobs Scope . Note: I ) For Measurement In Sqm : 2 ( Length + Width ) X Height Area Covered By The Scaffolding Is To Be Taken . Ii ) Scaffolding Measurement To Be Done By Breaking The Height Into Parts As Per Height Slab Mentioned Below And Adopting Respective Rates Against Mentioned Height Slabs . Remarks: ( I ) Mode Of Measurement For The Above Items Shall Be In Meter Square . Measurement Shall Be Taken As 2 Times Length + Bredth Multiplied By Height . This Shall Be Applicable For Outside Of The Confined Space . ( Ii ) For Scaffolding Erected From Any Platform , Height Of The Scaffolding Shall Be Taken From The Platform I . E Platform Shall Be Taken As Zero Meter Level . ( Iii ) In Addition To Above For Any Other Locations The Measurement Of Eic Shall Be Final And Binding To Contractor . ( Iv ) Erection Of Scaffolding And Removal / Dismantling Of The Same Scaffolding After Completion Of Job Shall Be Considered As Completed Job . No Separate Payment For Removal Of Scaffolding Shall Be Made . , Supply , Scaffolding Erection & Dismantling ( External ) , Up To 6M Height . , Above 6 M Up To 10 M Height . , Above 10 M Up To 20 M Height . , Above 20 M Up To 30 M Height . , Intermediate Platform . , Blinding And De-Blinding: The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds , Gaskets , Fasteners , Etc . , From Owners Storage Point , Loosening & Tightening Of Studs ( Cold / Gas Cutting If Required ) , Wedge Opening , Cleaning Of Flanges , Insertions And Removal Of Blind & Gaskets , Providing New Gaskets After Removal Of Blinds , Overhauling Of Fasteners Using Oil , Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . Note: ( 1 ) Nominal Diameter Of The Flanges Shall Be Taken For All Measurements . ( 2 ) In Case Of Either One Of The Activity Like Blinding Or De-Blinding Arise , 50% Of The Applicable Rate Shall Be Paid For The Single Activity . ( 3 ) This Rate Will Be Applicable Only For The Pipeline Replcement Job / Modification Jobs Only . For All Other Jobs Bliding & Deblinding Is Included Inlumpsum . , Blinding And Deblinding For 150# & 300# Ratings: , Blinding & Deblinding - Size Upto 1-1 / 2 Inch Dia . , Blinding & Deblinding - Size 2 Inch Dia . To 5 Inch Dia . , Blinding & Deblinding - Size 6 Inch Dia . To 10 Inch Dia . , Blinding & Deblinding - Size 12 Inch Dia . To 16 Inch Dia . , Blinding & Deblinding - Size 18 Inch Dia . To 24 Inch Dia . , Removal / Installation / Refixing Of Flanged Valves , <H>Removal Of Flanged Valves ( Other Than Safety Valves ) < / > The Job Includes Removal Of Flanged Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting And Transportation Of The Valve To The Maintenance Valve Shop Or Any Other Designated Place Inside The Refinery Premises For Repair / Disposal . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Dumping The Generated Scrap Material To The Designated Area , All Consumables And Labour To Complete The Job In All Respects . , Valve Rating - 150# & 300# , Removal Of Valves - Size 2 Inch Dia . To 3 Inch Dia . , Removal Of Valves - Size 4 Inch Dia . To 6 Inch Dia . , Removal Of Valves - Size 8 Inch Dia . To 10 Inch Dia . , Removal Of Valves - Size 12 Inch Dia . To 14 Inch Dia . , Installation Of Flanged Valves ( Other Than Safety Valves ) : The Job Includes Transportation Of Valves , Gaskets , Fasteners , Etc . , From The Owners Storage Point Or Valve Maintenance Shop , Cleaning , Checking , Tightening The Gland , Greasing & Freeing Up Etc . , Servicing Of All The Fasteners Using Oil , Replacing With New Fasteners Wherever Required , Hydrotesting The Valve If Required , At The Specified Pressure At Valve Maintenance Shop , Installation Of Flanged Valve At All Heights & Grades Using Proper Gaskets & Studs . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Dumping The Generated Scrap Material To The Designated Area , All Consumables And Labour To Complete The Job In All Respects . , Valve Rating - 150# & 300# , Installation Of Valves - Size 2 Inch Dia . To 3 Inch Dia . , Installation Of Valves - Size 4 Inch Dia . To 6 Inch Dia . , Installation Of Valves - Size 8 Inch Dia . To 10 Inch Dia . , Installation Of Valves - Size 12 Inch Dia . To 14 Inch Dia . , Removal & Refixing Of Flanged Safety Valves: The Job Includes Removal Of Flanged Safety Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting , Providing A Temporary Blind Flange At The Inlet & Outlet Of Safety Valve , Providing Identification Mark On The Safety Valve With A Tag And Transportation Of The Valve To The Maintenance Valve Shop For Servicing / Testing . The Job Also Includes Transportation Of Safety Valves From Maintenance Valve Shop After Servicing & Testing , Servicing Of All The Fasteners Using Oil , Replacing With New Fasteners Wherever Required , Installation Of The Safety Valve At All Heights & Grades Using Proper Gaskets & Studs . The Job Also Includes Supplying Of All Types Of Tools & Tackles , Lifting Arrangements Like Chain Pulley Blocks , Machineries , All Consumables And Labour To Complete The Job In All Respects , Transportation Of Required Materials Like Gaskets & Fasteners From Owners Storage Point , Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions . , Upto 15 Metres Elevatio