}

Supply Installation Testing Commissioning Of Fume Hoods , Lab Cabinets Etc In Room No 202 , 206 , 210 , 232 And236 Of 1St Floor Main Building On Turnkey Basis, CSIR-IICT HYDERABAD-Telangana

Statutory Bodies & Commissions/Committees has published Supply Installation Testing Commissioning Of Fume Hoods , Lab Cabinets Etc In Room No 202 , 206 , 210 , 232 And236 Of 1St Floor Main Building On Turnkey Basis. Submission Date for this Tender is 17-03-2021. Industrial Gases Tenders in CSIR-IICT HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

27130572
Supply Installation Testing Commissioning Of Fume Hoods , Lab Cabinets Etc In Room No 202 , 206 , 210 , 232 And236 Of 1St Floor Main Building On Turnkey Basis
Open Tender
Indian
Telangana
Csir-Iict Hyderabad
17-03-2021

Tender Details

Supply Installation Testing Commissioning Of Fume Hoods , Lab Cabinets Etc In Room No 202 , 206 , 210 , 232 And236 Of 1St Floor Main Building On Turnkey Basis , Rennovation Of Lab No 202 , Removal Of Existing Pipeline , Old Fumehoods , Ducting Associated With The Hoods , Reagent Racks , Work Benches , Demolishion Of Concrete Structure In The Room , Removal Of Flooring Shifing Of Debris To Outside The Lab , Shifting Of Other Items To Scrap Yard , Closing Or Repair Of Any Opening Etc In The Room 202 As Per Chapter 4 Specficaions , Sitc Of Four Nos Of Fumehoots With Four Nos Of Spot Extracter , Modular Cabinet Below The Hood As Per Specification Mentioned In Para No 1 Of Chapter Four Of The Tender Document Including Appropriate Ducting To The Roof Level With Provision To Instal A Blower And Subsequent Provision For Installatio Of Scrubbing Systemas Per Chapter 4 Specficaions , Sitc Of Lab Benches With Granite Top , Sink With Tap And Eye Wash ( Water Inlet To Be Taken For Existing Point Through A Water Line And Out Let To Be Connectod To The Existing Drainage Line ) And Peg Holder Of 32 Pegs Cabinets Below The Lab Benches With Drqwers And Locking Arrangement With Modular Eletrical Structure For Wiring Haveng Seven Plugs Of 16A , Seven Plugs Of 5A Switches And Necessry Wiring As Per Specifications At Para No 2 Chapeter No Four Of This Tender Document . The Total Benches Shall Be As Per The Layout Drawingas Per Chapter 4 Specficaions , Sitc Of Island Table With Granite Top , Cabinets Below The Top , Reagent Rack Modular Electrical Wiring Structure Withatleast Four Plug Os 16A , Four Plugs Of 5A And Necessary Electrical Wiring And Switches As Per Specification As Per Chapter 4 Specficaions , Sitc Of Effluent Drain Pipe Connecting All The Fumehood Sinks And Finally Connecting To The Main Drainage Pipe For Effluent Disposal As Per Chapter 4 Specficaions , Sitc Pipeline Of Compressed Air , Vaccumm , Chilled Water With Insulation ( Must Supply 20 Fume Hoods And 20 Rota Vapurs ) , Raw Water , Nitrogen Gas Line With One Standby Line For Gas Of Appropriate Material Including Connection To The Fumehoods An Atleast Four Points On The Lab Benches For Connecting To Instruments As Per Chapter 4 Specficaions , Sitc Of Fire Alarm System With Celing Mounted Smoke Detector , Automatic Fire Extuingishing System Novec 1230 Fire Protection Fluid Or Equavalent Quantity Of The Fluid Must Be Sufficient To Cover The Whole Area For Which Calculation Sheet From The 3Rd Party Or From Website To Be Enclosed ( Specifications As Per Chapter 4 ) , Sitc Of False Ceiling With Fire Retardent Material , With Ceiling Mounted Led Fixtures And Lights , Ceiling Mounted Ceiling Fan With Remote , The Fire Alaram Hooter Shall Be Kept At A Central Place Connecting All The Rooms As Per Chapter 4 Specficaions , Sitc Of Flooring With Anti Skid Floor Tiles As Per Chapter 4 Specficaions As Per Chapter 4 Specficaions , Sitc Of Height Adjustable , 360 Degree Swieel Mehanisam Heavy Duty Stainless Steel Chair With Cushion At Seat And Backnd A Foot Rest As Per The Picture Shown In The Tender Document 8 Nos As Per Chapter 4 Specficaions , Sitc Of Solvent Storage Cabinets Two Nos As Per Chapter 4 Specficaions As Per Chapter 4 Specficaions , Sitc Of Modular Chemical Storage Cabinet Inside The Laboratory As Per The Layout As Per Chapter 4 Specficaions , Sitc Painting Of The Total Area Inside The Lab Including False Ceiling As Per Chapter 4 Specficaions , Rennovation Of Lab No 206 , Removal Of Existing Pipeline , Old Fumehoods , Ducting Associated With The Hoods , Reagent Racks , Work Benches , Demolishion Of Concrete Structure In The Room , Removal Of Flooring Shifing Of Debris To Outside The Lab , Shifting Of Other Items To Scrap Yard , Closing Or Repair Of Any Opening Etc In The Room 206 As Per Chapter 4 Specficaions , Sitc Of Four Nos Of Fumehoots With Four Nos Of Spot Extracter , Modular Cabinet Below The Hood As Per Specification Mentioned In Para No 1 Of Chapter Four Of The Tender Document Including Appropriate Ducting To The Roof Level With Provision To Instal A Blower And Subsequent Provision For Installatio Of Scrubbing Systemas Per Chapter 4 Specficaions , Sitc Of Lab Benches With Granite Top , Sink With Tap And Eye Wash ( Water Inlet To Be Taken For Existing Point Through A Water Line And Out Let To Be Connectod To The Existing Drainage Line ) And Peg Holder Of 32 Pegs Cabinets Below The Lab Benches With Drqwers And Locking Arrangement With Modular Eletrical Structure For Wiring Haveng Seven Plugs Of 16A , Seven Plugs Of 5A Switches And Necessry Wiring As Per Specifications At Para No 2 Chapeter No Four Of This Tender Document . The Total Benches Shall Be As Per The Layout Drawing As Per Chapter 4 Specficaions , Sitc Of Island Table With Granite Top , Cabinets Below The Top , Reagent Rack Modular Electrical Wiring Structure Withatleast Four Plug Os 16A , Four Plugs Of 5A And Necessary Electrical Wiring And Switches As Per Specification As Per Chapter 4 Specficaions , Sitc Of Effluent Drain Pipe Connecting All The Fumehood Sinks And Finally Connecting To The Main Drainage Pipe For Effluent Disposal As Per Chapter 4 Specficaions , Sitc Pipeline Of Compressed Air , Vaccumm , Chilled Water With Insulation ( Must Supply 20 Fume Hoods And 20 Rota Vapurs ) , Raw Water , Nitrogen Gas Line With One Standby Line For Gas Of Appropriate Material Including Connection To The Fumehoods An Atleast Four Points On The Lab Benches For Connecting To Instruments As Per Chapter 4 Specficaions , Sitc Of Fire Alarm System With Celing Mounted Smoke Detector , Automatic Fire Extuingishing System Novec 1230 Fire Protection Fluid Or Equavalent Quantity Of The Fluid Must Be Sufficient To Cover The Whole Area For Which Calculation Sheet From The 3Rd Party Or From Website To Be Enclosed ( Specifications As Per Chapter 4 ) , Sitc Of False Ceiling With Fire Retardent Material , With Ceiling Mounted Led Fixtures And Lights , Ceiling Mounted Ceiling Fan With Remote , The Fire Alaram Hooter Shall Be Kept At A Central Place Connecting All The Roomsas Per Chapter 4 Specficaions , Sitc Of Flooring With Anti Skid Floor Tiles As Per Chapter 4 Specficaions , Sitc Of Height Adjustable , 360 Degree Swieel Mehanisam Heavy Duty Stainless Steel Chair With Cushion At Seat And Backnd A Foot Rest As Per The Picture Shown In The Tender Document 8 Nos As Per Chapter 4 Specficaions , Sitc Of Solvent Storage Cabinets Two Nos As Per Chapter 4 Specficaions , Sitc Of Modular Chemical Storage Cabinet Inside The Laboratory As Per The Layout As Per Chapter 4 Specficaions , Sitc Painting Of The Total Area Inside The Lab Including False Ceiling As Per Chapter 4 Specficaions , Rennovation Of Lab No 210 , Removal Of Existing Pipeline , Old Fumehoods , Ducting Associated With The Hoods , Reagent Racks , Work Benches , Demolishion Of Concrete Structure In The Room , Removal Of Flooring Shifing Of Debris To Outside The Lab , Shifting Of Other Items To Scrap Yard , Closing Or Repair Of Any Opening Etc In The Room 210As Per Chapter 4 Specficaions , Sitc Of Four Nos Of Fumehoots With Four Nos Of Spot Extracter , Modular Cabinet Below The Hood As Per Specification Mentioned In Para No 1 Of Chapter Four Of The Tender Document Including Appropriate Ducting To The Roof Level With Provision To Instal A Blower And Subsequent Provision For Installatio Of Scrubbing System As Per Chapter 4 Specficaions , Sitc Of Lab Benches With Granite Top , Sink With Tap And Eye Wash ( Water Inlet To Be Taken For Existing Point Through A Water Line And Out Let To Be Connectod To The Existing Drainage Line ) And Peg Holder Of 32 Pegs Cabinets Below The Lab Benches With Drqwers And Locking Arrangement With Modular Eletrical Structure For Wiring Haveng Seven Plugs Of 16A , Seven Plugs Of 5A Switches And Necessry Wiring As Per Specifications At Para No 2 Chapeter No Fo

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail