| 1 | 1 | Lowering of 03 nos of HT pump 02nos. 4000gpm pump and 1no. 2000gpm turbine at 3rd patch: Dismantling and withdrawal of 03 nos. of HT pump along with their motor starter and baseplate from their existing position | | 3 | set |
|---|
| 2 | 2 | transporting of all 03 nos. of dismantled pump along with motor starter & baseplate from their existing position to the lower side of the sump | | 3 | set |
|---|
| 3 | 3 | installation of 03 nos. pump motor set on the wooden sliper with proper alignment including fitting of coupling belt & greasing packing of the pump | | 3 | set |
|---|
| 4 | 4 | dismantling transporting & fitting of 10inch dia MS nipple 10inch dia MS bend 10inch dia MS pipe & footvalve in the suction of all the pump | | 3 | set |
|---|
| 5 | 5 | dismantling transporting & fitting of 10inch dia MS nipple 10inch dia shortpiece in the delivery of all the pump | | 3 | set |
|---|
| 6 | 6 | dismantling transporting & fitting of 10inch dia MS pipe in the delivery of all the pumps 4+4+4 = 12nos.X20ft | | 240 | ft |
|---|
| 7 | 7 | dismantling transporting & fitting of 8inch dia MS pipe in the delivery of all the pumps 10+09+08 =27 nos.X20ft | | 540 | ft |
|---|
| 8 | 8 | dismantling transporting & fitting of 8inch dia hose for jointing the delivery of all the pumps | | 3 | nos |
|---|
| 9 | 9 | shifting & laying of cable from starter to the motor of all the pumps 60mtr+65mtr.+55mtr | | 180 | mtr |
|---|
| 10 | 10 | providing & fitting of bearing in all the pumps 2+2+2 | | 6 | nos |
|---|
| 11 | 11 | extension of suction pipe of 03 nos. pumps 3+3+3 | | 9 | time |
|---|
| 12 | 12 | Shifting of 02 nos. of HT pump at MOCP Jharna sump: Dismantling & withdrawal of 02 nos. of HT pump along with their motor starter & baseplate from their existing position | | 2 | set |
|---|
| 13 | 13 | transporting of 02 nos. of dismantled pump along with motor starter & baseplate from their existing position to the east side of the sump | | 2 | set |
|---|
| 14 | 14 | installation of 02 nos.pump motor set on the wooden sliper with proper alignment including fitting of coupling belt & greasing packing of the pump | | 2 | set |
|---|
| 15 | 15 | dismantling transporting & fitting of 10inch dia MS nipple 10inch dia MS bend 10inch dia MS pipe & footvalve in the suction of all the pump | | 2 | set |
|---|
| 16 | 16 | dismantling transporting & fitting of 10inch dia MS nipple 10inch dia MS bend 10inch dia shortpiece in the delivery of all the pump | | 2 | set |
|---|
| 17 | 17 | dismantling transporting & fittin of 10inch dia MS pipe in the delivery of 02 nos. of the pump 7+6 = 13nos. X20ft. | | 260 | ft |
|---|
| 18 | 18 | dismantling transporting & fitting of 8inch dia MS pipe in the delivery of 02 nos. of the pump 13+17 = 30nos.X20ft. | | 600 | ft |
|---|
| 19 | 19 | dismantling transporting & fitting of 8inch dia sluice valve & NR valve in the delivery of both the pump 02+02 | | 4 | set |
|---|
| 20 | 20 | dismantling transporting & fitting of 10inch dia hose for jointing the delivery | | 1 | nos |
|---|
| 21 | 21 | fabrication & fitting of a matching piece of 8inch dia MS pipe for jointing the delivery of both the pump | | 2 | nos |
|---|
| 22 | 22 | shifting & laying of cable from starter to the motor of both the pumps 70mtr+65mtr. | | 135 | mtr |
|---|
| 23 | 23 | providing & fitting of bearing in all the pumps 2+2 | | 4 | nos |
|---|
| 24 | 24 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |
|---|