| 1 | 1 | Surface excavation n.exc 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and as directed. | | 990 | Sqm |
|---|
| 2 | 2 | Removing excavated material to a distance n.exc 50M and deposited/ spreaded where directed at a level n. exc 1.5 M above the starting point complete all as specified and as directed . | | 303.6 | Cum |
|---|
| 3 | 3 | Material and labour for repairs to potholes of depth not exc 30mm and area not exc 1 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25mm in depth, making good by applying tack coat @ 5 Kg per 10Sqm (VG-10), putting in premixed bituminous macadam, well rammed and sealed with binder 9.80 kg per 10 sqm (using paving bitumen VG-30), blinded with 0.09 cum of stone chippings, 6.30 mm size and again well rammed (including supply of premixed macadam, binder and chippings), rolled with smooth wheeled power roller 8 to 10 tonne and compacted to required camber and gradient and finishes to a uniform and smooth surfaces complete all as specified and as directed. | | 4 | 10 Sqm |
|---|
| 4 | 4 | Material and labour for 150mm thick soling (or sub base) with broken boulders or quarried stone, inter stices filled, surface formed and rolled with smooth wheeled power roller 8 to 12 tonne and consolidated to required gradient and camber complete all as specified and as directed. | | 88 | 10 Sqm |
|---|
| 5 | 5 | Material and labour for 150mm thick (75mm thick in two layer) (compacted thickness) water bound macadam (WBM) with coarse aggregates of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20mm size), using granite, trap or basalt stone, spread, rolled with smooth wheeled power roller 8 to 12 tonne and consolidated to required gradient and camber complete all as specified and as directed. | | 88 | 10 Sqm |
|---|
| 6 | 6 | Material and labour for preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming/ tack coat with bituminous primer @ 5 Kg per 10Sqm using paving bitumen grade VG-10 complete all as specified and as directed. | | 272 | 10 Sqm |
|---|
| 7 | 7 | Material and labour for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a priming/ tack coat with grade with paving bitumen VG-10 @ 10 Kg per 10Sqm complete all as specified and as directed. | | 88 | 10 Sqm |
|---|
| 8 | 8 | Material & labour for 40mm consolidated thickness bituminous premixed carpet with 0.54 Cum of stone chippings mixed with 29.2 Kg of binder (using paving bitumen VG-30), rolled with smooth wheeled power roller 8 to 12 tonne to required camber and gradient complete all as specified and as directed. | | 364 | 10 Sqm |
|---|
| 9 | 9 | Material and labour for liquid seal coat applying evenly binder @ 9.80Kg per 10 Sqm using paving bitumen of grade VG-30 blinding with 6.3mm size stone chippings @ 0.09 Cum per 10Sqm and rolled to a uniform smooth surface with power roller 8 to 12 tonne complete all as specified and as directed. | | 364 | 10 Sqm |
|---|
| 10 | 10 | Material and labour for painting lines, dashes, arrows, letters, etc on roads, pavements and the like exc. 10cm wide with road marking paint, white or golden yellow after preparation of old/new surfaces complete all as specified and as directed.\n | | 194 | Sqm |
|---|