Overhauling Of Ows System On Mfv Matsya Drushti , To Undertake Complete Overhauling Of Ows System As Per The Following Sow And Annexure-A To The Satisfaction Of Hsl & Shipstaff . , Ows System Tank To Be Dismantled , All Parts , Inspection Carried Out On Body , Transmitter , Oil Level Detector ( 03Nos ) , Solenoid Valves ( 03Nos ) , Safety Valve , Airvent Valve , Strainer , Pressure Gauge ( 02Nos ) , Test Cocks ( 03Nos ) , Ball Valves ( 02Nos ) , 3Way Cock Valve With Solenoid Operation Body Covers ( 02Nos ) , Calescer Unit , Gauge Cocks , Hanging , Bolts , Connected Pipe Lines Degutted And Regutted , Ppm Meter , Cleaned All Parts , Pressure Tested , Damaged Parts To Be Renewed , Boxuped With New Gaskets , Painted , Operation To Be Showned To Ship Staff And Surveyor , Materials Procurement And Fitment In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 6 Of Boq ) . , Ows Pump With 5Hp Motor:A ) Pump To Be Dismantled , Bearings And Leather Seals To Be Renewed , Overhauled , Clearances Measured , Pump Pressure Tested , Aligned With Motor , Pulley Belts To Be Renewed , Pulley ( 02Nos ) To Be Checked And Serviced Derective Parts To Be Renewed , Pump Operation To Be Showned To Ship Staff And Surveyor . Materials Procurement And Fitment In Contractor Scope . B ) Motor To Be Dismantled , Serviced , Renewed The Bearings , Fitted Back With New Ss Foundation Bolts Materials Procurement And Fitment In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 6 Of Boq ) . , 3Way Valve With Pneumatic Solendoid Operation To Be Removed From The Position , Renewed As Per Sample , New Valve Fitted With End Connectors And New Ss Bolts & Nuts . Materials Procurement And Fitment In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 6 Of Boq ) . , Ppm Meter:Ppm Meter To Be Removed , Calibrated As Per System Guide Manual , Defective Parts To Be Renewed , Fitted Back And Operation To Be Showned To Ship Staff And Surveyor . Materials Procurement And Fitment In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 6 Of Boq ) . , System Pipe Lines ( Ms ) -40Mm Dia & Sch-80:Ms Pipes To Be Removed , Renewed As Per Existing With New Flanges , New End Connectors , New Ss Bolts And Fitted Back , System Pressure Test To Be Showned To Ship Staff . Material: Ms Pipes , Flanges , Ss Bolts , Nut With Washer , End Connectors , Gaskets , All Machinery Works And Welding / Brazing Works , All Consumable In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 6 Of Boq ) . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 1 ) And Annexure-A . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 1 . 6 ) Against Third Party/Oem Invoice .