| 1 | 1.01 | Excavation of pole pit for 7.5/8 metres Normal | item1 | 200 | per each |
|---|
| 2 | 1.02 | Excavation of pole pit for 7.5/8 metres Semi Rocky | item2 | 50 | per each |
|---|
| 3 | 1.03 | Excavation of pole pit for 7.5/8 metres Rocky Soil | item3 | 20 | per each |
|---|
| 4 | 1.04 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Normal | item4 | 50 | per each |
|---|
| 5 | 1.05 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Semi Rocky | item5 | 20 | per each |
|---|
| 6 | 1.06 | Excavation of 9/9.14 RCC/RSJ all sizes and other poles including excavation of pole pit (pit size 3'x3'x1/6th of the length of poles) Rocky Soil | item6 | 10 | per each |
|---|
| 7 | 1.07 | Erection of pole 7.5/8 metres and refilling of earth | item7 | 270 | per each |
|---|
| 8 | 1.08 | Erection of pole 9/9.14 metres and refilling of earth | item8 | 50 | per each |
|---|
| 9 | 1.09 | Erection of pole RSJ Poleabove 30' and refilling of earth | item9 | 30 | per each |
|---|
| 10 | 1.1 | Trasportation of pole of all sizes from Road side upto 2KM | item10 | 270 | per each |
|---|
| 11 | 1.11 | Trasportation of pole of all sizes from Road side upto 2KM Above 2 Km - Per Km | item11 | 200 | Per each/Km |
|---|
| 12 | 1.12 | Base concerting 30 cm thick for one pole including of all materials | item12 | 150 | per each |
|---|
| 13 | 1.13 | Erection of V cross arm 3 1/2' size | item13 | 30 | per each |
|---|
| 14 | 1.14 | Erection of V cross arm 4 1/2' size | item14 | 20 | per each |
|---|
| 15 | 1.15 | Erection of Tapping channel 5 ' size / V Cross Arm 5' size | item15 | 20 | per each |
|---|
| 16 | 1.16 | Excavation of stay pit Normal Soil | item16 | 200 | per loc |
|---|
| 17 | 1.17 | Excavation of stay pit Semi Rocky | item17 | 50 | per loc |
|---|
| 18 | 1.18 | Excavation of stay pit Rocky Soil | item18 | 20 | per loc |
|---|
| 19 | 1.19 | Erection of stay set complete | item19 | 270 | per set |
|---|
| 20 | 1.2 | Fixing of 11 KV TI fitting | item20 | 40 | per each |
|---|
| 21 | 1.21 | Fixing of 33 KV TI fitting | item21 | 30 | per each |
|---|
| 22 | 1.22 | Fixing of LT 3 phase cross arm | item22 | 180 | per each |
|---|
| 23 | 1.23 | Fixing of LT TI fitting | item23 | 100 | per each |
|---|
| 24 | 1.24 | Fixing of single phase cross arm | item24 | 90 | per each |
|---|
| 25 | 1.25 | LT pin insulator with pin | item25 | 600 | per each |
|---|
| 26 | 1.26 | LT shackle with strap sets | item26 | 300 | per each |
|---|
| 27 | 1.27 | 11 KV pin insulator with GI pin | item27 | 150 | per each |
|---|
| 28 | 1.28 | 33 KV pin insulator with GI pin | item28 | 50 | per each |
|---|
| 29 | 1.29 | 11 KV strain disc with metal parts | item29 | 75 | per each |
|---|
| 30 | 1.3 | 33 KV strain disc with metal parts | item30 | 50 | per each |
|---|
| 31 | 1.31 | Fixing of Aluminium knob | item31 | 270 | per each |
|---|
| 32 | 1.32 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height)7.5 metres/8 metres pole | item32 | 25 | per each |
|---|
| 33 | 1.33 | Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height) 9.14 metres pole (with coping of 1' dia upto height of 1.1/2' above ground level) | item33 | 20 | per each |
|---|
| 34 | 1.34 | Coil Earthing of poles | item34 | 100 | per each |
|---|
| 35 | 1.35 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle 7/2.59 mm ACSR/7/2.50 AAAC | item35 | 8000 | RM |
|---|
| 36 | 1.36 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle 7/3.35 mm ACSR/7/3.15 AAAC | item36 | 4000 | RM |
|---|
| 37 | 1.37 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle Raccoon 7/4.09 mm | item37 | 2000 | RM |
|---|
| 38 | 1.38 | Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle Dog conductor 7/4.72 mm | item38 | 1500 | RM |
|---|
| 39 | 1.39 | Providing of guarding per span excluding of stay set erection 2 wire flat guarding(Split neutral grounding) | item39 | 80 | per span |
|---|
| 40 | 1.4 | Providing of guarding per span excluding of stay set erection 4 wire flat guarding | item40 | 30 | per span |
|---|
| 41 | 1.41 | Erection of spacers & jumpers Provision of 'PA' jumpers | item41 | 1000 | per each |
|---|
| 42 | 1.42 | Maintenance of DT structure for various capacity (pole mounted structure),DP/TP Structure maintenance,DT maintenance,Structure earthing wire redoing,Replacement of Structure earthing in complete without material,DT structure Yard cleaning,Watering to earth pits, | item42 | 100 | Per Structure |
|---|
| 43 | 1.43 | Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 11 KV AB switch structure | item43 | 40 | per set |
|---|
| 44 | 1.44 | Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 11 KV AB switch centre rotating | item44 | 10 | per set |
|---|
| 45 | 1.45 | Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 33 KV AB switch structure | item45 | 10 | per set |
|---|
| 46 | 1.46 | Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating). 33 KV AB switch centre rotating | item46 | 20 | per set |
|---|
| 47 | 1.47 | Tree Branches cutting | item47 | 1000 | Per Branch |
|---|
| 48 | 1.48 | Cutting of big tree fouling on the line. | item48 | 500 | per tree |
|---|
| 49 | 1.49 | Cutting of tree branches fouling on the line. | item49 | 500 | per tree |
|---|
| 50 | 1.5 | Clearing of heavy bushes/ Jungle/bushes/velikathan clearence | item50 | 150 | per sq.mtr |
|---|
| 51 | 1.51 | Set righting leaned HT Poles Pin Point location HT | item51 | 50 | per loc |
|---|
| 52 | 1.52 | Set righting leaned LT Poles Cut Point Location LT | item52 | 150 | per loc |
|---|
| 53 | 1.53 | Set righting leaned HT Poles Cut Point Location HT | item53 | 50 | per loc |
|---|
| 54 | 1.54 | Set righting leaned LT Poles Cut Point Location LT | item54 | 100 | per loc |
|---|
| 55 | 1.55 | Re-sagging (HT) 7/4.72 mm | item55 | 300 | RM |
|---|
| 56 | 1.56 | Re-sagging HTorLT 7/4.09 mm | item56 | 500 | RM |
|---|
| 57 | 1.57 | Re-sagging HTorLT 7/3.35 mm | item57 | 500 | RM |
|---|
| 58 | 1.58 | Re-sagging HTorLT 7/2.59 mm | item58 | 500 | RM |
|---|
| 59 | 1.59 | Dismantling of 7.5m/8.0m Poles | item59 | 150 | per pole |
|---|
| 60 | 1.6 | Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles | item60 | 50 | per pole |
|---|
| 61 | 1.61 | Dismantling of Stay set complete | item61 | 100 | per Loc |
|---|
| 62 | 1.62 | Dismantling of conductors including Coiling workspot upto 7/3.35 mm without transport | item62 | 10000 | RM |
|---|
| 63 | 1.63 | Dismantling of conductors including Coiling road side above 7/3.35 mm without transport | item63 | 3000 | RM |
|---|
| 64 | 1.64 | Releasing of LT S ph \"X\" Arm/TI Fitting | item64 | 200 | per each |
|---|
| 65 | 1.65 | Releaasing of LT 3 ph \"X\" Arm | item65 | 300 | per each |
|---|
| 66 | 1.66 | Releasing of 3' - 6\" \"V\" Cross Arm orTapping channal/Guarding \"X\" Arm | item66 | 100 | per each |
|---|
| 67 | 1.67 | Releasing of 4' - 6\"/ \"V\" Cross Arm | item67 | 50 | per each |
|---|
| 68 | 1.68 | Releasing of 5' \"V\" Cross Arm | item68 | 25 | per each |
|---|
| 69 | 1.69 | Dismantling of Guarding including Dismantling of cross arm per span | item69 | 50 | per span |
|---|
| 70 | 1.7 | Dismantling of Single ph service wire & re-effecting service including meter | item70 | 1500 | per Sc |
|---|
| 71 | 1.71 | Dismantling of three ph service wire & re-effecting service including meter | item71 | 1000 | per Sc |
|---|