}

Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara . , BEL Kotdwara-Uttarakhand

Bharat Electronics Limited has published Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara . . Submission Date for this Tender is 23-02-2021. Soldering and Welding Machinery Tenders in BEL Kotdwara Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

26816463
Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara .
Open Tender
Indian
Uttarakhand
Bel Kotdwara
23-02-2021

Tender Details

Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara . , Earth Work In Excavation In All Kind Of Soil In Foundation And Trench Including Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1 . 5 M , As Directed By Engineer-In-Charge . , Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish , Lead Up To 50 M And Lift Up To 1 . 5 M . All Kinds Of Soil , Cutting Road And Making Good The Same Including Supply Of Extra Quantities Ofmaterials I . E . Aggregate , Moorum Screening , Red Bajri And Labour Required . , Filling Available Excavated Earth ( Excluding Rock ) In Trenches , Plinth , Sides Of Foundations Etc . In Layers Not Exceeding 20Cm In Depth , Consolidating Each Deposited Layer By Ramming And Watering , Lead Up To 50 M And Lift Upto 1 . 5 M . , Diluting And Injecting Chemical Emulsion For Post Constructional; Antitermite Treatment Excluding The Cost Of Chemical Emulsion . , Along External Wall With Apron Using Ch . Emulsion @ 2 . 255 Liter/ Linear Meter Including Drilling And Plugging Holes , Etc . , Treatment Of Soil Under Existing Floor Using Ch . Emulsion @ 1 Liter . Per Hole 300 Mm Apart Including Drilling 12 Mm Diameter Holes And Plugging With Cement Mortar 1:2 To The Full Depth Of The Hole And Match The Existing Floor . , Treatment At Points Of Contact Of Wood Work By Chemical Emulsion Chlorpyriphos/ Lindane ( In Oil Or Kerosene Based Solution ) @ 0 . 5 Litres Per Hole By Drilling 6 Mm Dia Holes At Downward Angle Of 45 Degree At 150 Mm Centre To Centre And Sealing The Same . Treatment Of Existing Masonry Using Ch . Emulsion , Mixing And Laying Of Cable Including Filling With Sand 100Mm All Around And Laying Of Brick Widthwise . , Mixing And Laying Lean Cement Concrete Of Required Ratio As Per The Direction Of Engineer-In-Charge , Including Cost Of Vibrator Etc . Complete , But Excluding The Cost Of Shuttering . , All Work Upto Plinth Level , Cc Work Above Plinth Level Up To Floor V Level , Mixing And Laying Cement Concrete 1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 40 Mm Nominal Size ) In Pavements , Laid To Required Slope And Camber In Panels As Required Including Consolidation Finishing And Tamping Complete , Mixing And Laying In Position Required Grade Of Reinforced Cement Concrete , Including Cost Of Vibrator , Carriage Of Material , Scaffolding But Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement - All Work Up To Plinth Level , Mixing And Laying Rcc Work Of Required Ratio As Per The Direction Of Engineer-In-Charge In Super Structure Up To Floor Iv Shelves , Lintel , Beams , Slabs , Etc . Including The Cost Of Vibrator But Excluding Shuttering , Mixing And Laying Reinforced Cement Concrete In Walls ( Any Thickness ) , Including Plinth And String Courses , Fillets , Columns , Pillars , Pierse Of Required Ratio As Per The Direction Of Engineer-In-Charge But Excluding The Cost Of Shuttering . ( Item Includes Cost Of , Scaffolding , Lifting Of Material , Vibrator ) , Shuttering Work Excluding Cost Of Shuttering , Props , Balli , Etc . But Including The Cost Of Nails , Etc . , In Foundation , Footings , Bases Of Columns , Etc . For Mass Concrete Up To Plinth , . , Suspended Floors , Roofs , Landings , Balconies And Access Platform Etc . , Shuttering Work Columns , Pillars , Piers , Abutments , Posts And Struts , Etc . , Placing Of Steel Reinforcement For Rcc Work Including Cutting , Bending , Cost Of Binding Wire , Cover Block . , Constructing Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Foundation Up To Plinth . ( Excluding The Cost Of Brick , Cement , Sand ) , Constructing Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) Above Plinth Up To Floor Iv Level Including Scaffolding Etc . ( Excluding The Cost Of Brick , Cement , Sand ) , Construction Of Half Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Foundation Up To Plinth . ( Excluding The Cost Of Brick , Cement , Sand ) , Construction Of Half Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Super Structure Above Plinth Including Scaffolding Etc . ( Excluding The Cost Of Brick , Cement , Sand ) , Dry Brick On Edge Flooring In Required Pattern With Bricks Including Laying Of Bed Of 12 Mm Mud Mortar And Sand Filling . , Fixing Wooden Door Shutters Including The Cost Of Necessary Screws . , Fixing Pvc Door Shutters Including The Cost Of Necessary Screws . , Fixing Pvc Door Frame Including The Cost Of Necessary Screws . , Extra For Providing Vision Panel Not Exceeding 0 . 1 Sqm In All Type Of Flush Doors ( Cost Of Glass Excluded ) ( Overall Area Of Door Shutter To Be Measured ) , Fixing Door Fittings Including The Cost Of Necessary Screws , Carriage Of Material Etc Complete . , Door Handle/Stopper Etc . , Fixing Tower Bolt , Fixing Sliding Bolt/ Pull Bolt , Refixing Door/Windows Hinges/ Brackets By Welding At Locations Including The Cost Of Welding Rods Etc , Fixing/ Repairing Of Mortise Lock , Cupboard , Ward Rob Lock , Fixing Hydraulic Door Closer In New Location Including Drilling Ms Chaukhat , Cost Of Necessary Screws Etc , Fixing/ Repairing Hydraulic Door Closer In Old Location Including Thecost Of Necessary Screws Etc Complete , Fixing Section Window Handle/ Peg Stay Including Cost Of All Types Of Necessary Screws . , Repairing Of Al . Door In Its Location Including Cost Of All Type Of Necessary Screws , Fixing Board In Wall Lining Or Partitions Including The Cost Of Nails , Necessary Screws , Etc . , Fixing Wooden Moulded Beading Up To 50X12 Mm Including Nails , Necessary Screws Etc . , Fixing Of Pelmet Including Repairing , Including The Cost Of Necessary Screws And Rawal Plugs . , Fixing Of Pelmet In Its Location , Refixing/ Fixing Pelmet Rods , Fixing Of Boards Including Imbedding Bolt In Wall , Fabrication Work For Door Chaukhat , Frame Including Primer Coat , Including Cost Of Welding Rods , Etc . , Fabrication Structural Steel Work In Single Section Including Primer Coat , Including Cost Of Welding Rod , Refixing Wire Mesh Including Cost Of Nails , Necessary Screws , Fixing Door/Windows Chaukhat With Hold Fast , Extra For Fixing/ Grouting Angle/ Tee/ Pipe , Etc . On Wall/ Floor/ Ground . , Fixing Gi Chain Link Fencing Including Strengthening With 2Mm Dia Wire Or Nuts Bolts And Washer As Required Complete , Including The Cost Of Wire Or Nuts Bolts . , Fabrication And Fixing Al . Partition , Frame , Door & Window Shutters , Etc . Including The Cost Of Nut , Bolt , Washers , Neccesary Screws Etc . , Cutting And Fixing Nova Pan Board Pre-Laminated In The Al . Partition , Door Shutter Etc . Including The Cost Of Necessary Screws , Fixing Glass Pane In The Al . Partition , Door Shutter Etc . Including The Cost Of Rubber Gasket . , Renewal Of Rubber Gasket In The Al . Partition , Door Including The Cost Of Rubber Gasket . , Refixing Double Action Hydraulic Floor Door Closer Including Cost Of Cutting Hole As Per Size And Finishing Good The Floor , Fixing Double Action Hydraulic Floor Door Closer Including Cost Of Cutting Hole As Per Size And Finishing Good The Floor , Fixing False Ceiling Frame Structured For False Ceiling Tile Size 600X600 Mm And Placing The Tile Including The Cost Of Necessary Screws , Etc . , Repair Of False Ceiling Frame Structured Of Tile Size 600X600 Mm And Placing The Tile Including The Cost Of Wire , Necessary Screws , Etc . , Repairing Of Rolling Shutter , Changing Of Hinges Including Cost Of Hinges . , Change Of Spring Including Cost Of 27 . 5Cm Long Wire Spring Including The Cost Of Necessary Bolts Etc Complete

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 60.44 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail