Annual Civil Maintenance Addition And Alteration Work In Factory And Township At Bel Kotdwara . Annual Civil Maintenance , Addition And Alteration Work In Factory And Township At Bel Kotdwara . , Earth Work In Excavation In All Kind Of Soil In Foundation And Trench Including Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1 . 5 M , As Directed By Engineer-In-Charge . , Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15 Cm Deep And Disposal Of Rubbish , Lead Up To 50 M And Lift Up To 1 . 5 M . All Kinds Of Soil , Cutting Road And Making Good The Same Including Supply Of Extra Quantities Ofmaterials I . E . Aggregate , Moorum Screening , Red Bajri And Labour Required . , Filling Available Excavated Earth ( Excluding Rock ) In Trenches , Plinth , Sides Of Foundations Etc . In Layers Not Exceeding 20Cm In Depth , Consolidating Each Deposited Layer By Ramming And Watering , Lead Up To 50 M And Lift Upto 1 . 5 M . , Diluting And Injecting Chemical Emulsion For Post Constructional; Antitermite Treatment Excluding The Cost Of Chemical Emulsion . , Along External Wall With Apron Using Ch . Emulsion @ 2 . 255 Liter/ Linear Meter Including Drilling And Plugging Holes , Etc . , Treatment Of Soil Under Existing Floor Using Ch . Emulsion @ 1 Liter . Per Hole 300 Mm Apart Including Drilling 12 Mm Diameter Holes And Plugging With Cement Mortar 1:2 To The Full Depth Of The Hole And Match The Existing Floor . , Treatment At Points Of Contact Of Wood Work By Chemical Emulsion Chlorpyriphos/ Lindane ( In Oil Or Kerosene Based Solution ) @ 0 . 5 Litres Per Hole By Drilling 6 Mm Dia Holes At Downward Angle Of 45 Degree At 150 Mm Centre To Centre And Sealing The Same . Treatment Of Existing Masonry Using Ch . Emulsion , Mixing And Laying Of Cable Including Filling With Sand 100Mm All Around And Laying Of Brick Widthwise . , Mixing And Laying Lean Cement Concrete Of Required Ratio As Per The Direction Of Engineer-In-Charge , Including Cost Of Vibrator Etc . Complete , But Excluding The Cost Of Shuttering . , All Work Upto Plinth Level , Cc Work Above Plinth Level Up To Floor V Level , Mixing And Laying Cement Concrete 1:2:4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone Aggregate 40 Mm Nominal Size ) In Pavements , Laid To Required Slope And Camber In Panels As Required Including Consolidation Finishing And Tamping Complete , Mixing And Laying In Position Required Grade Of Reinforced Cement Concrete , Including Cost Of Vibrator , Carriage Of Material , Scaffolding But Excluding The Cost Of Centering , Shuttering , Finishing And Reinforcement - All Work Up To Plinth Level , Mixing And Laying Rcc Work Of Required Ratio As Per The Direction Of Engineer-In-Charge In Super Structure Up To Floor Iv Shelves , Lintel , Beams , Slabs , Etc . Including The Cost Of Vibrator But Excluding Shuttering , Mixing And Laying Reinforced Cement Concrete In Walls ( Any Thickness ) , Including Plinth And String Courses , Fillets , Columns , Pillars , Pierse Of Required Ratio As Per The Direction Of Engineer-In-Charge But Excluding The Cost Of Shuttering . ( Item Includes Cost Of , Scaffolding , Lifting Of Material , Vibrator ) , Shuttering Work Excluding Cost Of Shuttering , Props , Balli , Etc . But Including The Cost Of Nails , Etc . , In Foundation , Footings , Bases Of Columns , Etc . For Mass Concrete Up To Plinth , . , Suspended Floors , Roofs , Landings , Balconies And Access Platform Etc . , Shuttering Work Columns , Pillars , Piers , Abutments , Posts And Struts , Etc . , Placing Of Steel Reinforcement For Rcc Work Including Cutting , Bending , Cost Of Binding Wire , Cover Block . , Constructing Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Foundation Up To Plinth . ( Excluding The Cost Of Brick , Cement , Sand ) , Constructing Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) Above Plinth Up To Floor Iv Level Including Scaffolding Etc . ( Excluding The Cost Of Brick , Cement , Sand ) , Construction Of Half Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Foundation Up To Plinth . ( Excluding The Cost Of Brick , Cement , Sand ) , Construction Of Half Brick Work In Cement Mortar ( Of Any Ratio As Per The Direction Of Eic ) In Super Structure Above Plinth Including Scaffolding Etc . ( Excluding The Cost Of Brick , Cement , Sand ) , Dry Brick On Edge Flooring In Required Pattern With Bricks Including Laying Of Bed Of 12 Mm Mud Mortar And Sand Filling . , Fixing Wooden Door Shutters Including The Cost Of Necessary Screws . , Fixing Pvc Door Shutters Including The Cost Of Necessary Screws . , Fixing Pvc Door Frame Including The Cost Of Necessary Screws . , Extra For Providing Vision Panel Not Exceeding 0 . 1 Sqm In All Type Of Flush Doors ( Cost Of Glass Excluded ) ( Overall Area Of Door Shutter To Be Measured ) , Fixing Door Fittings Including The Cost Of Necessary Screws , Carriage Of Material Etc Complete . , Door Handle/Stopper Etc . , Fixing Tower Bolt , Fixing Sliding Bolt/ Pull Bolt , Refixing Door/Windows Hinges/ Brackets By Welding At Locations Including The Cost Of Welding Rods Etc , Fixing/ Repairing Of Mortise Lock , Cupboard , Ward Rob Lock , Fixing Hydraulic Door Closer In New Location Including Drilling Ms Chaukhat , Cost Of Necessary Screws Etc , Fixing/ Repairing Hydraulic Door Closer In Old Location Including Thecost Of Necessary Screws Etc Complete , Fixing Section Window Handle/ Peg Stay Including Cost Of All Types Of Necessary Screws . , Repairing Of Al . Door In Its Location Including Cost Of All Type Of Necessary Screws , Fixing Board In Wall Lining Or Partitions Including The Cost Of Nails , Necessary Screws , Etc . , Fixing Wooden Moulded Beading Up To 50X12 Mm Including Nails , Necessary Screws Etc . , Fixing Of Pelmet Including Repairing , Including The Cost Of Necessary Screws And Rawal Plugs . , Fixing Of Pelmet In Its Location , Refixing/ Fixing Pelmet Rods , Fixing Of Boards Including Imbedding Bolt In Wall , Fabrication Work For Door Chaukhat , Frame Including Primer Coat , Including Cost Of Welding Rods , Etc . , Fabrication Structural Steel Work In Single Section Including Primer Coat , Including Cost Of Welding Rod , Refixing Wire Mesh Including Cost Of Nails , Necessary Screws , Fixing Door/Windows Chaukhat With Hold Fast , Extra For Fixing/ Grouting Angle/ Tee/ Pipe , Etc . On Wall/ Floor/ Ground . , Fixing Gi Chain Link Fencing Including Strengthening With 2Mm Dia Wire Or Nuts Bolts And Washer As Required Complete , Including The Cost Of Wire Or Nuts Bolts . , Fabrication And Fixing Al . Partition , Frame , Door & Window Shutters , Etc . Including The Cost Of Nut , Bolt , Washers , Neccesary Screws Etc . , Cutting And Fixing Nova Pan Board Pre-Laminated In The Al . Partition , Door Shutter Etc . Including The Cost Of Necessary Screws , Fixing Glass Pane In The Al . Partition , Door Shutter Etc . Including The Cost Of Rubber Gasket . , Renewal Of Rubber Gasket In The Al . Partition , Door Including The Cost Of Rubber Gasket . , Refixing Double Action Hydraulic Floor Door Closer Including Cost Of Cutting Hole As Per Size And Finishing Good The Floor , Fixing Double Action Hydraulic Floor Door Closer Including Cost Of Cutting Hole As Per Size And Finishing Good The Floor , Fixing False Ceiling Frame Structured For False Ceiling Tile Size 600X600 Mm And Placing The Tile Including The Cost Of Necessary Screws , Etc . , Repair Of False Ceiling Frame Structured Of Tile Size 600X600 Mm And Placing The Tile Including The Cost Of Wire , Necessary Screws , Etc . , Repairing Of Rolling Shutter , Changing Of Hinges Including Cost Of Hinges . , Change Of Spring Including Cost Of 27 . 5Cm Long Wire Spring Including The Cost Of Necessary Bolts Etc Complete