Outsourcing Services For Manning And Operation Of Water Supply And Em Installation At ( Alg ) Walong Uder Ge ( Af ) Mohanbari . , Providing Services At ( Walong ) For Manning , Operation And Maintenance Of Main Receiving Installations Comprising Of Lt Panel And Transformers 315 Kva - 02 Nos And Fixing Of Burnt Out Ht/Lt Fuse , All Cables & Joints Alongwith All Connected Accessories Including Entering And Maintenance Of Electrical Readings Of Main Incoming And Outgoing Feeder Voltage , Ampere , Power Factor Details Etc On Hourly Basis , Apseb Breakdowns/Load Shedding/Shutdown , Mes Breakdown/ Load Shedding/ Shutdown In Registers/Documents , Lodging Elect Complaint And Cleaning Of Installations , Maintenance Of Earthing Pits Of All The Equipment & Plants Carrying Out Regular Testing Of The Equipment And Maintaining Of The Earth Testing Registers Etc In All Respect By Employing One Skilled Electrician / Operator Per Shift Of 08 ( Eight ) Hours In 3 ( Three ) Shift Per Day Round The Clock For 24 Hours Including Sunday & Holiday , Complete All As Specified And Directed By The Engineer-In- Charge In-Charge . Note 1 . Refer Particular Specification For Detail Of Work To Be Carried Out During Working Period . , Providing Services At ( Walong ) For Manning , Operation And Maintenance Of Dg Sets Near Atc And Pump House By Employing One Skilled Pump Operator Per Shift Of 8 ( Eight ) Hours In 2 ( Two ) Shift Round The Clock For 16 Hours Including Sunday & Holiday , Alongwith All Connected Accessories , Cleaning Of Installations In All Respects Complete All As Specified And Directed By Engineer-In-Charge From Time To Time . ( A ) Pump House Is Having Submersible Pump 05 Hp-2 Nos Including Chloropower Plant , Filtration Plant Complete With Bp Dozer , Oh Tanks Including Pumping , Valve Control , Chlorination , Back Washing Of Filtration Plant And Daily Testing Of Ph Value Of Water Sample , Collection Of Liquid Chlorine/Bleaching Powder Etc From Department As Per The Frame Time Given , Maintenance Of Log Sheet/Document Of Pumping Hours , Voltage , Amp Etc In All Respect During 2 Shift For 334 Days Complete All As Directed By Engineer-In-Charge From Time To Time As Specified . ( B ) Dg Set At Pump House Of Capacity 320 Kva 2 Nos Complete With Lt Panel , Cable , Accessories Including The Maintenance Of Log Sheet/Documents Of Dg Set , Operation Hours Voltage , Amp , Frequency On Mains Failures And Collection Of Diesel From Department For Day To Day Requirement Complete All As Specified And Directed . ( C ) All As Per Item No 1 ( B ) Here-In-Before But Capacity 35 Kva 1No . Note 1 . Refer Particular Specification For Detail Of Work To Be Carried Out During Working Period . , Chemical Analysis ( Turbidity , Ph , Total Hardness , Iron , Chlorides , Sulphates , Fluorides , Nitrates , Calcium , Arsenic ) Of Raw Water ( Before Filtration And After Filteration ) For Pump House At Alg Walong From Regional Reasearch Laboratory , Jorhat Including Collection Of Water Arrangement For Sending The Water , For Testing And Submission Of The Test Report Complete All As Directed And Specified By Engineer-In-Charge . Note : For Set Of One Bore Well ( Both After & Before Treating ) Will Be Measured As One Job .