| 1 | 1 | Earth work in excavation in foundation, trenches, etc. in all kinds of soils, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 meteres (HSR 6.6) @ Rs.1108.10+425% | | 137.24 | %Cum |
|---|
| 2 | 2 | First class brick work laid in cement, sand mortar 1:3 in foundation and plinth (HSR 11:4) @ Rs. 461.40+650% | | 33.8 | Cum |
|---|
| 3 | 3 | 12 mm thick cement plaster 1:3 (HSR 15.4) @ Rs. 15+600% | | 135.16 | Sqm |
|---|
| 4 | 4 | Cement rendering on plaster 1 mm thick. (HSR 15.75) @ Rs. 4.25+500% | | 100.92 | Sqm |
|---|
| 5 | 5 | Cement concrete 1:1.5:3 with stone aggregate 20 mm nominal size for reinforced concrete work in footing, strips, foundation, beams, rafts, pedestals and approach slabs of bridges etc. excluding steel-reinforcement and including centring and shuttering, laid in position, complete in all respects (For work upto 1.5 meteres below ground level) (as per HSR 10.90+10.95 (a) ) Rs. 687.10+86.90+450% | | 3.76 | Cum |
|---|
| 6 | 6 | Steel reinforcement TMT bars FE-500 EQR/FE-500 D grde or more for RCC work, where no included in the complete rate of RCC including straigthening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basement etc. (HSR item No. 18.22) @ 927.05+500% | | 5.04 | Qtl |
|---|
| 7 | 7 | Cement concrete 1:3:6 with stone aggregate 20 mm Nominal size in a foundation and plint (HSR item No.10.40) @ Rs. 516.90+450% | | 5.72 | Cum |
|---|
| 8 | 8 | 3 to 5 mm grade sand/gravel (zeera) | | 10 | Cum |
|---|
| 9 | 9 | 20 to 25 mm grade (Bajri) | | 10 | Cum |
|---|
| 10 | 10 | 50 to 75 mm grade boulders | | 10 | Cum |
|---|
| 11 | 11 | Boulder layer on top gravel layer | | 3.32 | Cum |
|---|
| 12 | 12 | Boring charges of 150 mm dia upto 64 meter including labour, HSD transpiration of boring machine & boring pipes, lowering of pipes gravel packing etc. | | 260 | Per Meter |
|---|
| 13 | 13 | Development charges of bore/cleaning by submersible pumping for 3 hours | | 4 | Job |
|---|
| 14 | 14 | 125 mm dia PVC slotting labour charges | | 56 | Per Meter |
|---|
| 15 | 15 | 125 mm 5\" dia 10 kg/Cm2 ISO/ISI/PVC pipe (including GST) | | 268 | Per Meter |
|---|
| 16 | 16 | Accessories like and iron clamp filter jaali etc | | 4 | Per Bore |
|---|
| 17 | 17 | Cost of gravels including extra gravels lost during development | | 6 | Cum |
|---|
| 18 | 18 | Carriage Charges of compressor machine other boring material etc | | 4 | Per Bore |
|---|
| 19 | 19 | Inlet Trash Rack | | 32 | Per inlet |
|---|