| 1 | 1 | Optical Fibre Cable Construction and allied works in Satara Telecom District. Excavating of trenches up to a depth of 165cms and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Normal Soil | BI01010001010000000000000515BI0100001113 | 3100 | Per Meter |
|---|
| 3 | 3 | Soft Rock | BI01010001010000000000000515BI0100001114 | 2000 | Per Meter |
|---|
| 4 | 4 | Hard rock | BI01010001010000000000000515BI0100001115 | 2000 | Per Meter |
|---|
| 5 | 5 | Laying of HDPE/PLB Pipes/Coils, Coupled with HDPE sockets and drawing PP rope. The BSNL Will supply HDPE/PLB Pipes and Coils , Rest of material will be arranged by the contractor. . | BI01010001010000000000000515BI0100001116 | 7100 | Per Meter |
|---|
| 6 | 6 | Horizontal Direction Drilling for laying of U/G , PLB /HDPE Pipes to a standard depth of 1.65 mtr as specified in laying practices of OF cable, by HDD method. | BI01010001010000000000000515BI0100001118 | 1000 | Per Meter |
|---|
| 7 | 7 | Laying and fixing of 65 mm/40mm G.I. /DWC Pipes in trenches with HDPE Pipe/Coils inside and drawing PP rope. | BI01010001010000000000000515BI0100001119 | 1000 | per meter |
|---|
| 8 | 8 | Laying and fixing of 100 mm G.I. Pipes in trenches with HDPE Pipe/Coils inside and drawing PP rope. | BI01010001010000000000000515BI0100001120 | 100 | per meter |
|---|
| 9 | 9 | Providing RCC Protection at Site to HDPE /PLB OR G.I. Pipes reinforced by Weld Mesh & Drawing of P.P. Rope. | BI01010001010000000000000515BI0100001122 | 10 | per Cub Meter |
|---|
| 10 | 10 | Opening of Manholes, replacing 6mm PP Rope, Pulling of 24 F O.F. Cable, Sealing of HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/RCC Split Pipes in manholes/Back filing of Manholes. | BI01010001010000000000000515BI0100001123 | 4000 | Per Meter |
|---|
| 11 | 11 | Opening of Manholes, replacing 6mm PP Rope, Pulling of 48/96 F O.F. Cable, Sealing of HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/RCC Split Pipes in manholes/Back filing of Manholes. | BI01010001010000000000000515BI0100001126 | 4500 | Per Meter |
|---|
| 12 | 12 | 48/96F cable Blowing on Existing Ducts, Including opening on Man Holes, Cleaning of Existing duct Pipes, insertion of 8 mm rope and Blowing of Optical fiber Cable. | BI01010001010000000000000515BI0100001128 | 2000 | Per Meter |
|---|
| 13 | 13 | Digging of pit for jointing chamber, construction of brick Chamber, and filling of brick chamber with clean sand, supply and placing of Pre-cast RCC Slabs on brick chamber, and back filling of jointing pit. | BI01010001010000000000000515BI0100001129 | 20 | Per Jointing Chamber |
|---|
| 14 | 14 | Digging of pit 1 meter towards jungle side on each manhole/joint chamber for fixing of route/joint indicator, fixing and concreting of routes/joint indicator. Painting and sign writing of route/joint indicators. | BI01010001010000000000000515BI0100001130 | 45 | Per Indicator |
|---|
| 15 | 15 | Recovery of empty Cable Drum | BI01010001010000000000000515BI0100001131 | 4 | Per Drum |
|---|
| 16 | 16 | Documentation ( six copies of the document for each rout / section = One Set ) | BI01010001010000000000000515BI0100001132 | 11 | Per Set |
|---|
| 17 | 17 | Splicing / Termination of 48 F Optical Fibre Cable | BI01010001010000000000000515BI0100001133 | 30 | Per |
|---|
| 18 | 18 | O/H OF Cable erection & tighting on existing posts/Trees/any other infra support | BI01010001010000000000000515BI0100001135 | 7000 | Per Meter |
|---|