| 1 | 1 | Supply, install, testing & commissioning of Microprocessor based single phase tamper proof electronic static energy meter,surface mount type and of rating 240 Volts, 50 HZ, of range 10-60 Amps, confirming to IS 13779 & IS 15884 with LED display and parameters like Voltage, Current, Frequency, Power, Power factor,KWh/KVA, default /in built dual source, inbuilt long range (LORAWAN) Communication suitable for outdoor LoRa data accumulator and also compatible for Prepaid cum Postpaid online energy monitoring / billing system, with disconnection/reconnection through remote software/data export to ERP complete all as specified and as directed by Engr-in Charge. \nMake : Elmeasure, Cat No : PE5121 or its techno-commercially equivalent. | | 30 | Each |
|---|
| 2 | 2 | Supply, install, testing & commissioning of Microprocessor based Three phase tamper proof electronic static energy meter,surface mount type and of rating 415 Volts, 50 HZ, of range 10-60 Amps, confirming to IS 13779 & IS 15884 with LED display and parameters like Voltage, Current, Frequency, Power, Powerfactor,KWh/KVA, default /in built dual source, inbuilt long range (LORAWAN) Communication suitable for outdoor LoRa data accumulator and also compatible for Preaid/Postpaid online energy monitoring/ billing system, with disconnection /reconnection through remote software /data export to ERP complete all as specified and as directed by Engr-inCharge. \nMake : Elmeasure, Cat No : PE5120 or its techno-commercially equivalent.\n | | 10 | Each |
|---|
| 3 | 2.01 | Note for Item Nos 1 to 2 (a) Arial Distance between the quaters and the building at which the server is installed,is with in 1.5 KM. (b) The Meter warranty should be 2 years. (c) The software should be capable of sending email & sms of billing information to the users/occupants. (d) The Complete work of installation, testing, Commisioning & Software enabling for bill generation as per the requirement of GE/Eng-incharge is to be executed by the OEM or his authorized channel partner only. (e) Any items missed out in the specification but technically required for the satisfactory performance of the meter is deemed to be included in the unit quoted rates. | | | |
|---|
| 4 | 3 | Supply, install, commissioning & testing of Outdoor LoRa accumulator for long range communication suitable for communicating with Prepaid / postpaid meter with LoRa communication protocol and the data transfer to the existing Elmeasure Elnet V5 Software complete all as specified and as directed by Engr-in-Charge. \nMake : EL Measure or its techno - commercially equivalent.\nNote:(a) The cost of pole /fixing /mounting arrangement on which the accumulator to be installed and SMPS power supply is deemed to be included in the unit quoted rates. (b) The complete work of installation, testing, commisioning & software linking should be as per the requirement of GE/Engr-in-Charge to be got executed by the OEM or his authorized channel partner only. (c) Any item missed in the specification but technically required for satisfactory working of the device is deemed to be included in the unit quoted rates. | | 2 | Each Job |
|---|
| 5 | 4 | Supply and Installation of Network Server, MQTT based intelligent network server for bridging between gateway and end application. Eliminate duplicate packets, schedule acknowledgement, and adapts data rates. | | 1 | Each Job |
|---|
| 6 | 5 | Supplying, Fixing, Commissioning and testing of configuration of Cloud Hosted multi user web based software with following modules:\n(i) Meter Data Management Module: The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The system would support offline meter data entry. The meter data management system would capture and provide the follwing data:\n(a) 30min instantaneous data from all the meters for seven parameters- Cumulative\nEnergy,Power, Current, Voltage, Power factor and Frequency.\n(b) Monthly and quarterly billing survey data for cumulative energy and max demand.\n(ii) Billing Module: The billing module would collectg the data from the meter data management module, calculate billing determinant and make energy data/ billing data available to admin and end users.\n(iii) Occupation and vacation Module: The System would support occupation/vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events.\n(iv) Customer portal: The system would include a customer portal for the resident/occupant to log in and view their own energy / billing data.\n(v) Energy Accounting Module: The system would include features of energy accounting. the system would be able to account for total energy bloack wise, facility wise and would also allow calcyulations of unaccounted energy in case total energy meter is also available.\n(vi) Communication module: The system would provide conmmunication of energy data and bills via print, email and sms methods\n(vii) Meter Master Data : The system would support meter data repository. The system wouls support meter replacment process.\n(viii) Excel Export:The system would support export of metering and billing data in excel format. \nMake : Elmeasure or its techno-commercially equivalent. | | 40 | Each Job |
|---|
| 7 | 5.01 | Note : Design/Drawing /Technical specification of the meter /Outdoor data accumulator /Software is to be obtained from OEM /Auth supplier & the same shall be got approved by GE . | | | |
|---|
| 8 | 6 | S&F desktop computer with the following specifications complete all as specified and directed by Engr-inCharge :- \nSoftware Parameters:- (a) 8GB RAM, DDR4 RAM with Genuine Windows 10 Operating system or higher version (b) Intel Processer with 8th Gen core i5 processor with min speed of 2.3GHz (c) Hardware storage of min 1TB \nHardware Parameters:- (a) Screen size of min 19.5 inches of black in color with full HD display (1920 x 1080), LED antiglare backlit display (b) Minimum of 3 USB ports. (c) With optical drive of tray load DVD Drive. (d) With one Qwerty keyboard & wireless mouse.\nMake : Dell, Model No : Optiplex 5060MT commercially equivalent. | | 1 | Each Job |
|---|
| 9 | 7 | S&F UPS with following specifications complete all as specified and directed by Engr-in-Charge:- (a) Capacity of 600VA with Output voltage 230V AC +10 % of frequency 50HZ + 1%. (b) Battery of 12 Volts, 7 AH- 1 No with min 30 mins backup with full battery condition. (c) Output waveform of Pseudo Sine. (d) Off mode battery charging with high voltage protection (e) Battey warrenty of atleast 2 years.\nMake : V- Guard, Model No : Slender Plus 600, or its techno-commercially equivalent. | | 1 | Each Job |
|---|
| 10 | 8 | S&F laserjet printer with single function black & white with USB connection with printing speed of min 18 pages per minute with resolution 600 x 600 x 2DPI complete all as specified and directed by Engr-inCharge. \nMake : HP, Model No: P1108 or its techno-commercially equivalent. | | 1 | Each \nJob |
|---|
| 11 | 8.1 | Notes: (i) Design/Drawings of items is to be obtained from OEM /Auth supplier & The same is to be got approved from the Engr- in-charge before placing teh final order to the OEM/Auth supplier (ii) The Complete work of installation, testing,Commisioning & Software enabling for bill generation as per the requirement of GE/Eng-in-charge is to be executed by the OEM or his Authorized channel partner only. | | | |
|---|
| 12 | 9 | S&F sheet metal enclosures for MCB distribution board 230 Volts Single pole and neutral 4 way Double door complete including flushing the DBs inside the wall and making good to the disturbed surfaces and also matching with the existing surface incl taking down old unsv DBs all as specified and directed by Engr in charge. | | 2 | Each |
|---|
| 13 | 10 | S&F MCB Single pole & neutral 240 volts, 5 to 30 Amps 10 KA all as specified and as directed. | | 2 | Each |
|---|
| 14 | 11 | S&F MCB single pole, 240 volts, 5 to 30 Amps 10 KA all as specified and as directed by Engr-in-Charge. | | 4 | Each |
|---|
| 15 | 12 | Sub main wiring complete with two runs of 4 sqmm single core PVC insulated heavy duty ISI Marked , unsheathed cable 1100 volts grade, multistranded with FRLS copper conductor drawn through and including 20 mm dia non metallic rigid PVC white conduit and conduit accessories Concealed /fixed to walls / roofs / floors etc., and including provision of PVC insulated heavy duty ISI Marked , unsheathed cable 1100 volts grade FRLS 4 sqmm for earth continuity conductor and making good the disturbed surfaces also matching the exisiting surfaces all as specified and as directed by Engr-in-Charge. | | 100 | RM |
|---|
| 16 | 13 | Maintenance of electric metering system and Paying Charges of SIM cards 40 Nos (for two gate ways)of energy meter (monthly payments,Hosting, GPRS charges) as received from the service provider as per instructions.(during defect liability period)\nNote:Defects liability Period is for two years which commence after actual completion of the work.During Defect Liability period, contractor is responsible for the following:-\n i)Meter data collection ii) Complete Knowledge sharing with MES and Project Handed over iii) Both Hardware and software installation and commissioning. | | 2 | Year |
|---|
| 17 | 14 | Annual comprehensive maintenance (for a period of two years) of Energy meters including repair / replacement of energy meters, gateways, antennas, RTU and contactors as well as solving any software related issues including charges of SIM cards for 40 Nos of energy meters network,(monthly payments,Hosting, GPRS charges) Network software, all hardwares etc., complete all as specified and as directed.\nNote: The AMC shall commence after completion of 2 years Defects liability period from date of actual completion of the work. | | 2 | Year |
|---|
| 18 | Total in Figures | | | | |
|---|