| 1 | 1 | Taking down exhaust fans 225/300/380/450 mm sweep, and then properly cleaning and greasing of bearings after opening of the fan including replacement of unserviceable parts, re-assembling and reconnecting of exhaust fan, complete all as specified and directed by Engr-in-Charge. Note:- Spare parts will be measured and paid separately at 'Supply only rates'. | | 15 | Each |
|---|
| 2 | 2 | Supply only ball bearing of exhaust fans of any size and type all as per site requirement including greasing, complete all as specified and directed by Engr-in-Charge.\nMake: SKF/NBC/ABC | | 6 | Each |
|---|
| 3 | 3 | Rewinding of exhaust fans of 225 to 300 mm sweep complete with super enameled insulated copper wire of appropriate size including all winding, insulating material and impregnation of insulating varnish as per detail given below of any make, type, model including transportation from AGE E/M store yard to site of rewinding, complete all as specified and directed by Engr-in-Charge. | | 8 | Each |
|---|
| 4 | 4 | All as per item No. 03 here-in-above but exhaust fan of 450 mm sweep. | | 4 | Each |
|---|
| 5 | 5 | Painting of exhaust fans after due preparation of surface 225/300/380/450mm sweep complete at site with super enamel synthetic paint of colour as per old one by spray gun including filling cavities with filler, two coats after cleaning of all dust, grease, smoke spots, complete all as specified and directed by Engr-in-Charge. | | 2 | Each |
|---|
| 6 | 6 | Supply only copper alloy bush of exhaust fan any make and size all as per site requirement,complete all as specified and directed by Engr-in-Charge. | | 2 | Each |
|---|
| 7 | 7 | Replacement of deshaped blades of exhaust fans of any size as per site requirement, complete all as specified and directed by Engr-in-Charge | | 2 | Each |
|---|
| 8 | 8 | Taking down ceiling fans 1200/1400mm sweep, and then properly cleaning and greasing of bearings after opening of the fans including replacement of unserviceable parts, re-assembling and re-connecting of the same and also writing MES No.existing with black paint, complete all as specified and directed by Engr-in-Charge. \nNote:- Spare parts will be measured and paid separately at 'Supply only rates'. | | 40 | Each |
|---|
| 9 | 9 | Strip opening of unserviceable ceiling fans, 230 volts, 1200/1400mm sweep, any make for undertaking repairs/greasing/oiling, re-assembling and testing after repairs/greasing etc complete all as specified and directed by Engr-in-Charge. | | 25 | Each |
|---|
| 10 | 10 | Rewinding of ceiling fans motor,1200mm sweep any make with super enameled copper winding wire of gauge as per existing including cutting and getting out old unserviceable winding, sleeve work, varnishing with E class insulation varnish, threading, connection with twin core copper flexible wire of size 0.0076mm of length not more than one metre with each fan complete all as specified and directed by Engr-in-Charge.\n(Material to be used as per ISI marked) \nNOTE:-\n(i) Fixing of repaired fan in any location of cantt area shall be contractors responsibility at his own arrangement of transport and T&P. \n(ii) Old burnt wire will be contractors property and necessary credit shall be recovered as per sch of credit attached. | | 25 | Each |
|---|
| 11 | 11 | Supply only ball bearing of ceiling fans of any size and type all as per site requirement including greasing, complete all as specified and directed by Engr-in-Charge. \nMake: SKF/NBC/ABC | | 10 | Each |
|---|
| 12 | 12 | Supply only gun metal copper alloy bush for ceiling fans, any type and size as per existing one, complete all as specified and directed by Engr-in-Charge. | | 10 | Each |
|---|
| 13 | 13 | Supply only capacitor of size 2.5 MFD for ceiling fans all as directed and specified by Engr-in-Charge. | | 25 | Each |
|---|
| 14 | 14 | Supply only canopy of ceiling fans of size and make as per existing one as required at site complete all as specified and directed by Engr-in-Charge. | | 10 | set of two |
|---|
| 15 | 15 | Supply only down rod of ceiling fans of size 15mm bore, G.I. pipe, heavy grade complete with drilling holes, cutting and making threads as per site requirement up to 0.75mtr including painting with two coats of white paint complete all as specified and directed by Engr-in-Charge. | | 10 | Each |
|---|
| 16 | 16 | Supply only bolts, nuts and washers, rubber reel, split pin for ceiling fans of any size of approprite size as required at site and directed by Engr-in-Charge. | | 25 | Each set |
|---|
| 17 | 17 | Spray painting of ceiling fans of any size with two coats of synthetic enamel white spary paint after cleaning the fan for dust,oil,grease etc, complete all as specified and directed by Engr-in-Charge. | | 25 | Each |
|---|
| 18 | 18 | Supply only of ceiling fans blades suitable for 1200mm/1400 mm sweep complete all as specified and directed by Engr-in-Charge. Make: Bajaj/USHA/CG | | 7 | Set of three |
|---|
| 19 | 19 | Taking down carefully geysers 50/35/25 ltr capacity from wall after unscrewing nut/bolts and opening the same for taking out internal tank, syphon assembly etc and re-assembling and re-fixing after repair complete all as specified and directed by Engr-in-Charge. \nNote:- Spares to be replaced shall be measured under respective items of Sch here-in-after. | | 50 | Each |
|---|
| 20 | 20 | Supply only heating unit (element), ISI marked of 1500 watts, triangular shape, rating as required at site including rubber washers, complete all as specified and as directed by Engr-in-Charge.\nMake: Umpire/Wondercool/Ditz/Toshiba | | 50 | Each |
|---|
| 21 | 21 | All as per serial item No 20 here-in-above but of circular shape. | | 50 | Each |
|---|
| 22 | 22 | Supply and fix (in replacement) internal steel tank of geyser 25 ltr capacity complete with syphon–assembly, 1.5 kw element, rubber gasket, thermostat switch, complete all as specified and as directed by the Engineer-in-Charge. \nNOTE:- \n(i) The tank shall be tested at site and shall be able to with-stand the requisite pressure & necessary testing equipment shall be arranged by the contractor. | | 6 | Each |
|---|
| 23 | 23 | Supply and fix (in replacement) internal steel tank of geyser 50 ltr capacity complete with syphon–assembly, 1.5 kw element, rubber gasket, thermostat switch, complete all as specified and as directed by the Engineer-in-Charge. \nNOTE:- \n(i) The tank shall be tested at site and shall be able to with-stand the requisite pressure & necessary testing equipment shall be arranged by the contractor. | | 2 | Each |
|---|
| 24 | 24 | Supply and fix (in replacement) of syphon assembly made out of brass of 50 ltr capacity including necessary studs screws and rubber gasket/washers, complete all as specified and as directed by the Engineer-in-Charge. | | 4 | Each |
|---|
| 25 | 25 | All as per Srl item No. 24 above but 25 ltr capacity. | | 4 | Each |
|---|
| 26 | 26 | Supply and fix (in replacement) glass wool of 25 ltrs capacity geyser, complete all as specified and as directed by the Engineer-in-Charge. | | 12 | job |
|---|
| 27 | 27 | All as per Srl item No. 26 here in before but 50 ltr capacity geyser. | | 5 | job |
|---|
| 28 | 28 | De-scaling of geyser of capacity 25/50 ltr after taking down the geyser from wall, strip opening the assembly, de-scaling the syphon assembly and refixing the assembly and re-installation of geyser, complete all as directed by Engineer-in-charge. | | 15 | Each |
|---|
| 29 | 29 | Supply and fix (in replacement) PVC connection 15mm dia complete with brass flair nuts at both ends (ISI marked) and suitable for hot water supply upto 100 degree celcius, complete all as specified and as directed by the Engineer-in-Charge. | | 30 | Each |
|---|
| 30 | 30 | Supply and fix (in replacement) brass pressure relief valve, chromium plated suitable for geyser 25/50 ltr capacity,complete all as specified and directed by Engr-in-Charge. | | 10 | Each |
|---|
| 31 | 31 | Supply and fix (in replacement) anchor bolt 12mmX100mm long, complete all as specified and as directed by the Engineer-in-Charge. \n(Note:- Anchor bolt shall be grouted with hammer drill only) | | 20 | Each |
|---|
| 32 | 32 | Supply and replacement of defective mild steel base plate cup, any type with screws of suitable size as per requirement, complete all as specified and as directed by Engr-in-Charge. | | 6 | Each |
|---|
| 33 | 33 | Supply only ISI marked thermostat range 0°-75°C for the geysers of 25 to 50 liters capacities complete, all as specified and as directed by Engr-in-Charge. | | 50 | Each |
|---|
| 34 | 34 | Supply only 15mm stop valve, CP, fancy type, cast copper alloy, screwed down high pressure with cutch or butterfly handle screwed both ends for iron pipe unions and suitable, complete all as specified and directed by Engr-in-Charge. | | 8 | Each |
|---|
| 35 | 35 | Supply only non return valve 15mm dia, cast copper alloy, ISI mark, complete all as specified and as directed by Engineer-in-charge. | | 5 | Each |
|---|
| 36 | 36 | Supply only indicator lamp rectangular/round type, complete all as specified and directed by Engr-in-Charge. | | 10 | Each |
|---|
| 37 | 37 | Supply only 1100 volt grade cable flexible 3 core, PVC insulated, PVC sheathed with stranded copper conductor of size 2.5 sqmm all as specified and directed by Engr-in-Charge. | | 150 | RM |
|---|
| 38 | 38 | Supply and fix (in replacement) CP connection brass with flair nuts all as per sample,complete all as specified and directed by Engr-in-Charge. | | 4 | Each |
|---|
| 39 | 39 | Supply only GI union, 15mm dia complete for fixing the non return valve complete all as specified and as directed by Engineer-in-Charge | | 6 | Each |
|---|
| 40 | 40 | Cleaning/ scrapping of old paint/ dust and painting of geysers of 25/35/50 litres capacity at site/ store with two coat of super enameled painting by spray complete, all as specified and as directed by Engr-in-Charge. | | 20 | Each |
|---|
| 41 | 41 | Supply and fix (in replacement) single pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole MCB 20Amps complete all as specified by Engr-in-Charge. | | 10 | Each |
|---|
| 42 | 42 | Supply and fix (in replacement) mild steel galvanised iron water tubing 15mm bore with screwed & socket joints, medium grade, in short lenghts, with and including all fittings such as sockets, bends, elbows,unions, tees diminishing pieces etc; fixed to wall or ceiling or in floor complete all as specified and as directed by Engineer-in-Charge. | | 40 | RM |
|---|
| 43 | 43 | Supply & fix (in replacement) of existing unserviceable Sheet metal enclosure with new DB’s suitable for MCBs of single pole and neutral 8 way, double door type with 200 amp rated bus bar complete all specified and as directed by the Engineer-in-Charge. \nNote: \n(i) Connnections of the MCB's shall be done with appropriate size of brass/ Copper thimble. \n(ii) The disturbed surface shall be make good to match with existing surface.\nMake: Havells/Legrand/ABB | | 12 | Each |
|---|
| 44 | 44 | Supply and fixing MCB SPN 40 Amp, 240 Volts, 10 KA, complete all as specified and directed by Engr-in-Charge. | | 30 | Each |
|---|
| 45 | 45 | Supply and fix (in replacement) MCB SP 10 to 32 Amp, 240 Volts, 10 KA, complete all as specified and directed by Engr-in-Charge. | | 72 | Each |
|---|
| 46 | 46 | Supply and fix (in replacement) plug top, 15 Amp, three pin for geysers, complete all as specified and directed by Engr-in-Charge. | | 30 | Each |
|---|
| 47 | 47 | Supply and fix (in replacement) metal clad socket three pin for geysers, complete all as specified and directed by Engr-in-Charge. | | 30 | Each |
|---|
| 48 | 48 | Supply and fix (in replacement)1100 volts grade, heavy duty cable, PVC insulated, stranded aluminium conductor, served with inner sheathing of PVC tape and overall PVC sheathed in service connections, one twin core cable flat or circular stranded conductor size of 10 Sqmm, 2 core complete all specified and as directed by the Engineer-in-Charge. | | 500 | RM |
|---|
| 49 | 49 | Supply and fix (in replacement) of existing unserviceable FTL with new technology ultra bright LED tubelight with aluminium heat sink & polycarbonate diffuser having high efficiency suited for installation in existing T5 or T8 tubelight with G5 lamp holders to give glare free light with separate LED driver of capacity 18W 865 1148mm LED including necessary electric connection wih batten complete all specified and as directed by the Engineer-in-Charge.\nMake:- Havells/Polycab/Wipro | | 300 | Each |
|---|
| 50 | 50 | Supply and fix ( in replacement ) of existing unserviceable batten with BOX TYPE Pre-coated CRCA body, heavy duty regal batten for LED tube universal batten for G13 T5 or T-8 lamps includings necessary fitting on wall and making electric connection from ceiling rose to connector with suitable size of electric cable and making good the disturbed surface complete all specified and as directed by the Engineer-in-Charge. \nMake: Havells or Equivalent to Wipro/Polycab. | | 300 | Each |
|---|
| 51 | 51 | Supply and fix (in replacement) in replacement of Recess mounted LED luminaire with more light distribution and clutter free ceilings of 36 watt suitable for grid ceiling (Cutout dimensions: 2x2 Model :ImmaculateLED Trimless) complete all as specified and as directed by Engineer-in-Charge.\nMake: WIPRO Cat part No :CRCO10R038HP57SLAB or equivalent in Havells/CG\n | | 14 | Each |
|---|
| 52 | 52 | Supply and fix (in replacement) of existing unserviceable environmental friendly, ultra modern, energy saving, surface mounted, decorative oval bulk head edge-lit LED luminaire comprising of high brightness LEDs of capacity 10 watt complete all as specified and directed by the Engineer-in-Charge.\nMake: Havells cat part no IHEOAOP7UZ6W010 equivalent in WIPRO/CG/Philips. | | 40 | Each |
|---|
| 53 | 53 | Angular type lamp holder, PVC/ polycarbonate type with back plate suitable for 15/18 watts for batten fitting, including plastic square board of required size complete all specified and as directed by the Engineer-in-Charge. | | 200 | Each |
|---|
| 54 | 54 | Supply and fix (in replacement) LED Lamp LED new Adore 7W E27 WW Ball Lamp complete all as specified and as directed by Engineer-in-Charge.\nMake: Havells cat part No LHLDERHEMD 8X007 7 watt or equivalent in Bajaj/CG/Havells. | | 200 | Each |
|---|
| 55 | 55 | Ceiling rose, surface type, 65 mm x 50 mm, two to three terminals/ PVC/ polycarbonate, isolated body fixed on PVC block, complete all as specified and as directed by the Engineer-in-Charge. | | 100 | Each |
|---|
| 56 | 56 | Supply & fix in replacement of existing UNSV sealed unit for Refrigerator of any capacity including Gas charging complete all as specified and as directed by Engineer-in-Charge. \nMake: LG/Kirloskar/Kelvinator/Tecum seh/Godrej/Copeland. | | 3 | Each |
|---|
| 57 | 57 | Supply and charging the refrigerator gas R-134A including replacement of Compressor oil, complete all as specified and as directed by Engineer-in-Charge. | | 4 | Kgs |
|---|
| 58 | 58 | Supply and fix (in replacement) of existing UNSV cooling Thermostat switch No 10180 for Refrigerator of any complete all as specified and as directed by Engineer-in-Charge.\nMake: SIEBE/Renutrol/Pacific or equivalent. | | 4 | Each |
|---|