Painting To The Steel Structural Works Such As Columns, Trusses, Purlins, Bracings, Cladding Runners, Plates, Gratings Etc. With Using Marine Quality Paint And Primer. Applying One Marine Primer And Two Coat Of Marine Paint ( Paint First And Second Coat Applying Different Shade ) Using Ppg Asian / Jotun / Hemel Make At All Heights After Cleaning, Wire Brushing, Emery Papering, Buffing Etc. Including All Cost And Conveyance Of Materials, All Labour Charges, Loading Unloading Charges, Hire Charges For Tools & Plants, Providing Necessary Scaffolding Etc. Complete As Per Standard Specification. Labour Charges For Dismantling And Removing Steel Structures With Ms Angles, Channels, Plates Etc. Of Trusses, Purlins Etc. At All Heights Using Proper Tools And Plants Without Damaging The Structures, Lowering Carefully And Stacking The Usable Trusses, Purlins, Beams Etc. At Convenient Place As Directed By The Company Authorities And Depositing The Waste Materials With In The Lead Of 50M Including All Labour Charges, Hire Charges For Tools And Plants, Loadingunloading Charges, All Consumables, Providing Necessary Scaffolding Etc. Complete As Per Standard Specification. Fabrication, Supply And Erection Of Steel Structural Work Such As Column, Lattice Beams, Bracings, Cladding Runners, Foundation Bolts, Plates Etc. By Using Ismb, Channels, Angles, Flats, Rods, Plates By Welded Or Bolted Connection At All Heights And Levels, Applying One Coat Of Marine Primer Including All Cost And Conveyance Of Materials , All Consumables, Labour Charges, Hire Charges For Tools And Plants, Loadingunloading Charges, Necessary Scaffolding Etc. Complete As Per Standard Specification. Sundry & Petty Maintenance Works: Skiled Labour