Cs For Preparation Of Detailed Project Report And Detailed Engineering For Up Gradation To 2 Lane With Paved Shoulders Of The Stretch From Km 0 To 36 . 400 Of Nh 167Bg From Seetharampuram To Duttalur In The State Of Andhra Pradesh , Key Personnel : , Team Leader Cum Senior Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Meterial Cum Geotechnical Engineer - Geologist , Senior Survey Engineer , Traffic And Safety Expert , Environmental Specilist , Quantity Surveyor / Documentation Expert , Land Acquistion Expert , Utility Expert , Sub-Professional Staff : ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub Professional Be A Fresh Graduate ) , . . , . . , . . , . . , . . , . . , . . , Support Staff : , Office Manager , Typist , Office Boy , Night Watchman , Transportation ( Fixed Costs ) , The Vehicles Provided By The Consultants Shall Include The Cost For Rental Drivers Operation , Maintenance , Repairs , Insurance Etc . , A . For Use Of Consultant , Duty Travel To Site ( Fixed Costs ) : , Office Rent ( Fixed Costs ) The Rent Includes Maintenance , Cleaning , Repairing Etc . , , . . , Office Supplies , Utilities And Communications ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computer Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Rental ) , Office Furniture And Ecquipment ( L . S ) , Reports & Documents Printing ( For Clubbed Projects ) , Monthly Report ( 3Copies Per Month ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With La Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report & Rap , Final Environmental Assessment Report And Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp . , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , Topographic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Detailed Topographic Surveys Using Mobile / Aerial Lidar Or Better Technology , Investigation ( Fixed Cost ) , Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffice Survey , Socio-Economic & Census Survey/Studies , Land Acquisition Studies , Any Other Investigations/Surveys , Sub-Soil Investigation ( Boring ) , A ) Boring In All Type Of Soils ( Other Than Hard Rock ) , B ) Boring In Hard Rock , Network Survey And Gpr , Network Survey Of The Existing Highways As A Repository For Civil Works As Per Directions From Authority , Gpr Survey For Detection Of Under Ground Utilities , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Wherever The Proposed Alignment Follows The Existing Alignment , The Boundary Pillars Shall Be Fixed Atan Interval Of 200M On Either Side Of Proposed Right Of Way . Wherever There Is A Proposal Of Realignment Of The Existing Highway And/ Or Construction Of New Bypasses , Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . ( Lumpsum ) , Land Acquisition Team Including Support Staff And Logistics/ Transportation , Ex-Land Revenue Inspector/ Officer Or Equivalent , Ex-Kanoogo/Girdwar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , B . Logistics For Land Acquisition Team , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km , Estimate Of Costs For Expatriate Consultants ( In Indian Rupees ) , I . Remuneration Of Expatriate Staff Including Per Diem Allwances , Ii . Mobiliation And Demobilization , 1 . International Airfares ( Fixed Costs ) , Total Cost Net Of Tax: , I . Income Tax ( Expatriate Staff ) , Ii . Other Taxes/ Duties ( If Any ) Specify Clearly , Goods And Service Taxes @ 18%