Consultancy Services For Preparation Of Detailed Project Report For 2 Laning With Paved Shoulder In The Ut Of Jammu And Kashmir And Ladakh , Remuneration For Local Staff ( Including Per Diem Allowance ) , Professional Staff , Team Leader Cum Senior Highway Engineer , Senior Bridge Engineer , Highway Cum Pavement Engineer , Material Cum Geotechnical Engineer Cum Geologist , Senior Survey Engineer , Traffic And Safety Expert , Environmental Specialist , Quantity Surveyor / Documentation Expert , Land Acquistion Expert , Utility Expert , Sub-Professional Staff: ( To Be Assessed By Consultant As Per Requirement Of Assignment Out Of Which 3 Nos . Sub-Professional Having 3 Years Experience And 2 Nos . Sub-Professional Be A Fresh Graduate ) , Tbn , Tbn , Tbn , Tbn , Tbn , Support Staff ( Fixed Rates ) , Office Manager ( 1 No . ) , Typist ( 1 No . ) , Office Boy ( 1 No . ) , Night Watchman ( 1 No . ) , Transportation ( Fixed Costs ) , The Vehicles Hired By The Consultants Shall Include The Cost For Rental , Drivers , Operation , Maintenance , Repairs , Insurance , Etc . For Use Of Consultants ( 2 Vehicle For 8Months Each ) , Duty Travel To Site ( Fixed Costs ) , All Trips , Office Rent ( Fixed Costs ) , The Rent Cost Includes Operation & Maintenance , Cleaning , Repairs , Etc For Entire Duration Of Services . , Office Supplies , Utilities And Communication ( Fixed Costs ) , Office Supplies , Drafting Supplies , Computor Running Costs , Domestic And International Communication , Office Furniture And Equipment ( Fixed Costs ) , Office Furniture And Equipment , Reports And Document ( Fixed Costs ) , Monthly Report ( 03 Sets ) , Inception Report & Qap , Environment And Social Impact Screening Report , Draft Feasibility Report , Final Feasibility Report , Strip Plan With L . A . Reports , Draft La And Clearances I Report , Final La And Clearances I Report , Draft Environmental Assessment Report & Rap , Final Environmental Assessment Report & Rap , Draft Detailed Design Report & Drawings Etc . , Draft Emp , Draft Bidding Documents , Final Detailed Project Report With Bill Of Quantities , Cost Estimates , Updated Drawings Etc . , Final Emp , Final Bidding Documents , Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) , La & Clearances Ii Report , Survey And Investigation , A . Topographical Survey ( Fixed Rate ) , Complete Topographic Survey Using Mobile / Aerial Lidar Or Equivalent / Better Technology For Project Approach Area Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer , Preparation Of Drawings And Their Submission As Per Contract Provision . , B . Investigation ( Fixed Cost ) , All Investigations / Surveys Including Road And Bridge Inventory , Fwd Test And Pavement Evaluation , Roughness Survey , Axle Load Survey , Material Survey And Investigation , Sub-Grade Investigation , Traffic Survey , Socio-Economic & Census Survey / Studies , Land Acquisition Studies , Etc . , Net Work Survey And Gpr , Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority . , Gpr Survey For Detection Of Under Ground Utilities , Sub-Soil Investigation & Other Works , Sub-Soil Investigation , A ) Boring In All Type Of Soils ( Other Than Hard Rock ) , B ) Boring In Hard Rock , Cost Of Supply And Fixing Boundary Pillars , Procuring And Fixing Boundary Pillars And Its Installation , Complete In All Respect As Per Irc:25 , 1967: Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval . , Land Acquisition Team Including Support Staff And Logistics / Transportation , A . Land Acquisition Team Including Support Staff , Ex-Land Revenue Inspector / Officer Or Equivalent , Ex-Kanoongo / Girdawar Or Equivalent , Ex-Patwari Or Equivalent , Typist , Peon , B . Logistics For Land Acquisition Team , Computer Including Necessary Peripherals , Printers , Vehicles ( Bolero Or Equivalent ) With Monthly Running Limit Of 4000 Km