| 1 | 2 | 01.01 - Proper surface preparation of primer/paint over towers, columns, vessels, heat exchangers, gas cylinders, steel sheets/plates used for structural purposes, chimneys, bunkers transformers, equipments, steel strutures, hand railings, toe guards, ladders, pipe lines, pipe fittings, pipe suports, cabletrays etc. at any height in the plant. | 1.01 | | |
|---|
| 2 | 3 | 01.01.01 -Surface preparation and one coat chlorinated rubber paint suitable for and upto 120o C [Refer Table-I at S. No. I(a)]. | 01.01.01 | 20 | SqM |
|---|
| 3 | 4 | 01.01.02 One coat high build zinc phosphate primer & two coat chlorinated rubber paint suitable for and upto 120o C [Refer Table-I at S. No. I(b)]. | 01.01.02 | 2000 | SqM |
|---|
| 4 | 5 | 01.01.03 - Surface preparation and one coat epoxy finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(c)]. | 01.01.03 | 20 | SqM |
|---|
| 5 | 6 | 01.01.04 - One coat epoxy red oxide zinc chromate primer & two coat epoxy finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(d)]. | 01.01.04 | 40000 | SqM |
|---|
| 6 | 7 | 01.01.05- Surface preparation and one coat synthetic enamel finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(e)]. | 01.01.05 | 1250 | SqM |
|---|
| 7 | 8 | 01.01.06 - One coat red oxide zinc chromate primer & two coat synthetic enamel paint suitable for and upto 120o C [Refer Table-I at S. No. I(f)]. | 01.01.06 | 14000 | SqM |
|---|
| 8 | 9 | 01.01.07 - One coat red oxide zinc chromate primer & two coat heat resisting aluminium paint suitable for and upto 250o C [Refer Table-I at S. No. I(g)]. | 01.01.07 | 1500 | SqM |
|---|
| 9 | 10 | 01.01.08 - Two coat heat resisting aluminium paint suitable for and upto 600o C [Refer Table-I at S. No. I(h)]. | 01.01.08 | 20 | SqM |
|---|
| 10 | 11 | 01.01.09 - One coat epoxy oxide zinc chromate primer and two coat high build epoxy finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(i)]. | 01.01.09 | 1500 | SqM |
|---|
| 11 | 12 | 01.01.10 - One coat epoxy oxide zinc chromate primer ,one coat high build epoxy and one coat polyuretahne finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(i)]. | 01.01.10 | 700 | SqM |
|---|
| 12 | 13 | 01.01.11 - One coat protectomastic primer & two coat epoxy finish paint suitable for and upto 120o C [Refer Table-I at S. No. I(j)]. | 01.01.11 | 1000 | SqM |
|---|
| 13 | 14 | 2.01 - Proper surface preperation & application of primer/paint over Gratings. | 01.01.12 | | |
|---|
| 14 | 15 | 2.01.01 - Primer & Paint suitable for and upto 120o C [Refer Table-I at S. No..-II(a)]. | 01.01.13 | 70 | MT |
|---|
| 15 | 16 | 3.01 - Proper surface preperation & application of one coat red oxide zinc chromate primer and two coat synthetic enamel paint suitable for and upto 120o C [Refer Table-I at Sr. No. I(f)] | 01.01.14 | | |
|---|
| 16 | 17 | 3.01.01 - Dozer | 01.01.15 | 1 | NO |
|---|
| 17 | 18 | 3.01.02 - Terex | 01.01.16 | 1 | NO |
|---|
| 18 | 19 | 3.01.03 - Hydra 3 Te. | 01.01.17 | 1 | NO |
|---|
| 19 | 20 | 3.01.04 - Hydra 5 Te. | 01.01.18 | 1 | NO |
|---|
| 20 | 21 | 3.01.05 - Hydra 8 Te. | 01.01.19 | 1 | NO |
|---|
| 21 | 22 | 3.01.06 - Crane P&H Capacity 127 Te including its extension (120 Feet) | 01.01.20 | 1 | NO |
|---|
| 22 | 23 | 3.01.07 - Crane P&H Capacity 75 Te with its boom | 01.01.21 | 1 | NO |
|---|
| 23 | 24 | 3.01.08 - Coles Crane & its extension | 01.01.22 | 1 | NO |
|---|
| 24 | 25 | 3.01.09 - Backhoe Loader (JCB) | 01.01.23 | 1 | NO |
|---|
| 25 | 26 | 3.01.10 - Tractor | 01.01.24 | 1 | NO |
|---|
| 26 | 27 | 3.01.11 - Trolley 5 Te | 01.01.25 | 1 | NO |
|---|
| 27 | 28 | 3.01.12 - Trolley 10 Te | 01.01.26 | 1 | NO |
|---|
| 28 | 29 | 3.01.13 - Diesel Welding Set | 01.01.27 | 1 | NO |
|---|
| 29 | 30 | 3.01.14 - Diesel Generator | 01.01.28 | 1 | NO |
|---|
| 30 | 31 | 3.01.15 - Portable Air Compressor | 01.01.29 | 1 | NO |
|---|
| 31 | 32 | 3.01.16 - Jumbo Truck/Pallet Truck | 01.01.30 | 2 | NO |
|---|
| 32 | 33 | 3.01.17 - Air Compressor and Receiver | 01.01.31 | 1 | NO |
|---|
| 33 | 34 | 3.01.18 - Loco | 01.01.32 | 1 | NO |
|---|
| 34 | 35 | 4.01 Sand Blast Cleaning of Pipes, vessels, Crane Booms etc. | 01.01.33 | | |
|---|
| 35 | 36 | Scope of Work: | 01.01.34 | | |
|---|
| 36 | 37 | Party has to make their own arrangement for the Machines, Air Compressor, Sand and proper covering of the Area, so that Plant Area is not disturbed due to this activities etc., required for execution of the job. | 01.01.35 | | |
|---|
| 37 | 38 | 4.01.01 - Sand Blast Cleaning of Pipes, vessels, Crane Booms etc. | 01.01.36 | 30 | SqM |
|---|
| 38 | Total in Figures | | | | |
|---|