| 1 | 1 | Part-A (as per main scope of work) : | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Lumsum Rate for Overhauling of boiler pressure parts, high pressure valves, burners, wind box and providing cuplock scaffolding inside the furnace installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar. | BI01010001010000000000000515BI0100001113 | 1 | Job |
|---|
| 3 | 2 | Part-B (variable Scope of work) : (Unit rate wise items) : | BI01010001010000000000000515BI0100001124 | | |
|---|
| 4 | 2.01 | HP joint including cutting, edge preparation etc. upto 80 mm | | 350 | Nos. |
|---|
| 5 | 2.02 | Lowering of any eco coil (upper & lower) repositioning after carrying out work/replacement wherever required. HP joints excluded. | | 4 | Nos. |
|---|
| 6 | 2.03 | Lifting of any LTSH coil (upper & lower) repositioning after carrying out work/ replacement wherever required. HP joints excluded | | 3 | Nos. |
|---|
| 7 | 2.04 | Replacement of damaged skin casing /welding | | 15 | per sq. metre |
|---|
| 8 | 2.05 | FIN welding | | 50 | per metre |
|---|
| 9 | 2.06 | Repair/replacement of high pressure piping hangers.(MS, HRH & CRH) | | 20 | each |
|---|
| 10 | 2.07 | Repair/replacement of auxiliaries piping hangers. | | 20 | each |
|---|
| 11 | 2.08 | Fabrication of high pressure bends with dia up to 70 mm & thickness up to 5 mm | | 20 | each |
|---|
| 12 | 2.09 | Making space in 01 no. LTSH coils in order to facilitate/To Carry out in build-ups/joints in these coils by pulling the adjacent LTSH coils with pulling & lifting machine after cutting the hanger tubes if required | | 15 | each. |
|---|
| 13 | 2.1 | Servicing of wall soot blower including lance replacement if required. | | 1 | each |
|---|
| 14 | 2.11 | Servicing of long retractable soot blower | | 1 | each |
|---|
| 15 | 2.12 | Complete servicing & commissioning of long retractable soot blower which includes replacement of burnt out lance ; other spares and its alignment. | | 1 | each |
|---|
| 16 | 2.13 | Casting of refractory | | 5 | per MT |
|---|
| 17 | 2.14 | Providing shields on tubes | | 50 | Nos. |
|---|
| 18 | 2.15 | Providing of cassettes baffles for Economizer. | | 10 | each |
|---|
| 19 | 2.16 | Providing of cassettes baffles for LTSH. | | 10 | each |
|---|
| 20 | 2.17 | Cutting of hand hole plate & its re-welding | | 2 | No. |
|---|
| 21 | 2.18 | repair of header by weld overlay/metal build up | | 2 | sqr. metre |
|---|
| 22 | 2.19 | Replacement of skin casing | | 5 | sqr. Metre |
|---|
| 23 | 2.2 | Replacement of complete loop of divisional SH panels as per scope mentioned in main scope of work | | 2 | No. |
|---|
| 24 | 2.21 | Replacement of complete loop of platen SH panels as per scope mentioned in main scope of work | | 1 | No. |
|---|
| 25 | 2.22 | Restoration of sagged tubes in radian roof | | 10 | No. |
|---|
| 26 | 2.23 | Servicing of Drum Safety valves | | 1 | No. |
|---|
| 27 | 2.24 | Servicing of Super Heater Safety valve | | 1 | No. |
|---|
| 28 | 2.25 | Servicing of H.R.H. Safety valve | | 1 | No. |
|---|
| 29 | 2.26 | Servicing of C.R.H. Safety valve | | 1 | No. |
|---|
| 30 | 2.27 | Servicing of ERV Safety valve | | 1 | No. |
|---|
| 31 | 2.28 | Servicing of Pneumatic Control Valve | | 1 | No. |
|---|
| 32 | 2.29 | Servicing of LP Valves, Size upto 15 mm. | | 20 | No. |
|---|
| 33 | 2.3 | Servicing of LP Valves, Size : 25 mm to 40 mm | | 15 | No. |
|---|
| 34 | 2.31 | Servicing of LP Valves, Size : 50 mm to 100 mm | | 5 | No. |
|---|
| 35 | 2.32 | Servicing of LP Valves, Size : 150 mm to 200 mm | | 5 | No. |
|---|
| 36 | 2.33 | Servicing of High Pressure valves, Size upto 25 mm | | 2 | No. |
|---|
| 37 | 2.34 | Servicing of High Pressure valves, size : 25 mm to 50 mm | | 2 | No. |
|---|
| 38 | 2.35 | Servicing of High Pressure valves, size : 50 mm to 100 mm. | | 2 | No. |
|---|
| 39 | 2.36 | Servicing of High Pressure valves, size : 100 mm to 150 mm | | 1 | No. |
|---|
| 40 | 2.37 | Servicing of High Pressure valves, size : 150 mm to 350 mm | | 1 | No. |
|---|
| 41 | 2.38 | Servicing of 600 NB motor operated 1 No. main feed line valve & its actuator | | 1 | No. |
|---|
| 42 | 2.39 | Servicing of peep holes/manholes | | 10 | No. |
|---|
| 43 | 2.4 | Replacement of valves/bends/ 1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder upto 25 mm | | 5 | Each job per mtr. |
|---|
| 44 | 2.41 | Replacement of valves/bends/1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder, 25 mm to 80 mm | | 5 | Each job per mtr. |
|---|
| 45 | 2.42 | Replacement of valves/bends/1mtr. Length pipeline by cutting, welding, grinding and fit-up work for each job (for valves & bends)/per mtrs. (for pipeline) by certified IBR welder, 80 mm to 200 mm | | 5 | Each job per mtr. |
|---|
| 46 | 2.43 | Repair/servicing of oil Burner valve and replacement if required. | | 1 | No. |
|---|
| 47 | 2.44 | Removal of oil tip & its refitting including alignment. | | 1 | No. |
|---|
| 48 | 2.45 | Removal of air tip & its refitting including alignment. | | 1 | No. |
|---|
| 49 | 2.46 | Replacement of wind box expansion joints | | 1 | No. |
|---|
| 50 | 2.47 | Retention /early removal of cup lock Scaffolding (kindly refer Note 5 of point No. 7 in main scope of work) | | 10 | days |
|---|
| 51 | 2.48 | Man hour rates (including T&P, gas, consumables) Skilled labour/welder | | 75 | Hrs. |
|---|
| 52 | 2.49 | Man hour rates (including T&P, gas, consumables) semi-skilled | | 75 | Hrs. |
|---|
| 53 | 2.5 | Man hour rates (including T&P, gas, consumables) Un skilled | | 100 | Hrs. |
|---|