Kerala State Electricity Board-KSEB has published Construction Of 1 . 5 Km 11 Kv Line From Pb Jn To Thavalam And Installing 100 Kva Transformer Under Es , Vilakkudy. Submission Date for this Tender is 09-11-2020. Transmission Line Tenders in Vilakkudy Kerala. Bidders can get complete Tender details and download the document.
Name of Work:CONSTRUCTION OF 1.5 KM 11 KV LINE FROM PB JN TO THAVALAM & INSTALLING 100 KVA TFR UNDER ES,VILAKKUDY. | |||||
---|---|---|---|---|---|
Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 65 | No | |
2 | 2 | Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle). | 2 | No | |
3 | 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 17 | Trip | |
4 | 4 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km). | 170 | Km | |
5 | 5 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. | 1 | Trip | |
6 | 6 | Transporting Transformers by hired vehicle to a distance beyond 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs (Running km). | 20 | Km | |
7 | 7 | Drilling hole of various sizes on existing Channel/Cross Arm. | 65 | No | |
8 | 8 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. | 35 | No | |
9 | 9 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 54 | No | |
10 | 10 | Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 2 | No | |
11 | 11 | Additional rate for providing one disc set on any type of HT pole for making cut point. | 24 | No | |
12 | 12 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 3 | No | |
13 | 13 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 63 | No | |
14 | 14 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. | 3 | No | |
15 | 15 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. | 2 | No | |
16 | 16 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 40 | No | |
17 | 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 65 | No | |
18 | 18 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. | 15 | No | |
19 | 19 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. | 10 | No | |
20 | 20 | Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. | 2 | No | |
21 | 21 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. | 1.5 | Km | |
22 | 22 | Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. | 1 | No | |
23 | 23 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. | 1 | No | |
24 | 24 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. | 3 | No | |
25 | 25 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. | 7 | No | |
26 | 26 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. | 5 | No | |
27 | 27 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 60 | No | |
28 | 28 | Fitting one set AB switch and giving connection | 1 | No | |
29 | 29 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). | 15 | Km/Km | |
30 | 30 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. | 2 | No | |
31 | 31 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. | 15 | No | |
32 | 32 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | 5 | No | |
33 | 33 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials. | 5 | No | |
34 | 34 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 70 | No | |
35 | 35 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 35 | No | |
36 | 36 | Fitting one additional F top bracket | 2 | No | |
37 | 37 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 5 | No | |
38 | 38 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 35 | No | |
39 | 39 | Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling | 2 | No | |
40 | 40 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 16 | No | |
41 | 41 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 65 | No | |
42 | 42 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. | 43 | No | |
43 | 43 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. | 11 | No | |
44 | 44 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. | 10 | No | |
45 | 45 | Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting. | 6 | No | |
46 | 46 | Dismantling SV/MV/Metal halide lamp fitting from the existing pole and refitting the same on newly erected pole and reconnecting (without using aerial lift). | 1 | No | |
47 | 47 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking. | 18 | No | |
48 | 48 | Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking. | 15 | No | |
49 | 49 | Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking. | 6 | No | |
50 | 50 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. | 65 | No | |
51 | 51 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). | 2 | No | |
52 | 52 | Providing Transformer fencing using GI chain link. | 22 | M2 | |
53 | 53 | Providing yard metallings with 6mm & 40mm thick blue metal as specified after constructing a curb wall. | 9 | M2 | |
54 | 54 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. | 65 | No | |
55 | 55 | Preparing index register (book & soft copy) showing name of Transformer, post numbers, consumer numbers as specified. | 65 | No |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail