1.01 Painting Angle Iron Posts Of Ghats With Super Enamel Iaint Including All Cost Of Material, Labour And T&P Etc 1.02 Painting Ms Chain / Pipe With Super Enamel Paint Including All Cost Of Material, Labour And T&P Etc 1.03 Providing & Fixing Ms. Chain Including All Cost Of Material, Labour And T&P Etc Complete. 1.04 Providing & Fixing Angle Iron Pole Of Size L00xl0oxsmm And 2Ndm Long With Base Plate Including All Cost Of Mataial, Labour Mnd T&P Etc Complete 1.05 Dry / Wet Shoal With Shingle Excavation With Sand & Earth ( The Rate Should Be Reduced By 5-10% Mixture Of Sand And Earth ) Including Initial Lead And Lift Including All Cost Of Materaal, Labour And T&P Etc Conmilete. 1O06i Dry / Wet Shoal With Shingle Excavation For Making Bund For Doing Necessary Job Including All Lift Mnd Lead Upto 2Kmn. By Power Transport Including All Cost Of Labour Mnd T&P Etc Complete. 1.07 P / Fining E.C.Bags With Earth, Sewing And Placing In Position Within Lead Upto O0m Including Making Bund I / C All Cost Of Matenal. Labour And T&P Etc. Comolete 1.08 P / Weaving 0.1. Wire Crate Of 8 S.W.G. Double Knot L50xl5omm Mesh Of Size 3.0Xi 50X1.00 M. Placing In Position And Packing Boulder 20 To 40 Kg. In Crates I / C. All Cost Of Material, Labour And T&P Etc Complete. 1.09 Providing & Laying Boulder 20 To 40 Kg Filling In Scoured Portion For Making Base Of 0.1. Wire Crate I / C. All Cost Of Material, Labour Mnd T&P Etc Complete. 1.10 Dewatering Including All Cost Of Labour Mnd T&P Etc Complete. 1.11 Providing & Laying Rem Beyond 200 M Lead I / C. Afl Cost Of Material, Labour And T&P Etc Complete 1.12 Dismantling & Relaying Dry Boulder 20 To 40 Kg. For Pitching I / C. All Cost Of Material, Labour Mnd T&P Etc Complete. 1.13 Providing 1 50Mm Deep Grouting In Boulder Pitching With Crushed Aggregate 10-25 Mm C-C. 1:3:6 Including All Cost Of Material, Labour And Ttp Etc Comvlete. 1.14 Earth Work For Removing Silted Theks From Main Canal I / C Disposal With 1.50M Lift And Lead Beyond 500M Itc All Cost Of Material, Labour And T&? Etc Comn Lete. 1.15 Providing Mnd Fixing Of Indian Sal Wood Fo Oodea Gate ( Fatta ) Including All Cost Of Material, La And 1L.16I Providing Beldar For Watch And Ward Bund / Cleafffng Ghat I / C All Cost Of Labour Mnd T&P Etc Complete. 1.17 Earth Work In Titling In Cuts And Depression With An Average Lead Of 7.0 Km. Including All Lift And Compaction Etc. For Repairing Work Of Internal Slope Of Bank Of Ugc. 1.18 Providing And Laying Boulder Apron For Bed Protection With Stone Boulders Of Minimum Size And Weight As Per Table 1300.1, No Fragment Weighing Less Than 25Kg Laid Dry Complete As Per Drawing And Technical Specifications Caause 1301. Mord Ofu.K. P.W.D. Chap. 14- Item 14-1 1.19? Phstering With Cement Mortar ( 14 ) , 15 Mm Thick On Brickwork In Substructure Including All Cost Of Material. Labour And T&P Etc. ( Per Sqm. ) As Per Technical Specification Caauses 6 13, 4 & 1204. 1.20 Providing & Laying C.C. Grade M-20 Nomual Mix 1:24 Including All Cost Of Material, Labour And T&P Etc Complete. As Per Mont Of U.Kp.W.D. Chap. 12, Item 12 3.2.I 1.21 1St Class Brick Work In 14 Cm Ifc. All Cost Ofnnterial, Aabour And T&P Etc Complete. As Per Mord Of Vlfwd.Chpp12hlni1el? 1.22 Greasing & Oiling Of Fitting Mechanism Of Gates Cluding Roller After Proper Cleaning With Replacing Cease Nipple As Required Including Cost Of All Material, Labour And T&P Etc Required For Proper Completion Of 1.23 Applying Cardaum Compound On Steel Wire Rope Drum Gear After Proper Cleaning Nncludung Cost Of All Material, Labour And T&P Mnd Scaffolding Required For Proper Completion Of Work. 1.24 Rectifying Derective Alignment Of Gates By Aisting Length Of Sted Wire Rope And Other Allied Work As Required Including Cost Of All Material, Labour And T&P, Igs & Fixture, Scaffloding Etc As Required For Proper .___- Completion Of Work After The Deducting Cost Of Old 1.25 Repairing Of Electromagnetic Brackes By Detaching From Dectric Motor And Coupling And Disassembling Opening And Replacing Wornout Brack Shoe Lining, Torgue Spnng, Liver Pin, Alien Screw Etc After Making Holes In Bracks And Rivetting As Required As Per Sample And Replacing Burnt Brackcoil Including Cost Of All Material, Labour And ____- T&P Etc After The Aeducting Cost Of Old Damage ‘1 1.26 Repairing Of Damaged / Broken Teeah Of Drum Gea1of Gj4 By Chiseling Teeth Drilling Holes, Tapping In The Ber Making Threads, Fixing Studs, Welding B Cs / Cl Electrodes Ror Making New Teeth, Chipping, Grinding And Pohicing As Per Required Size And Slape Including Cost Of All Material, Labour, Diesel Welding Generator Set With Operator Und Other Reauired T&P Etc. 1.28 Replacement Of Damaged Packing And Seal Of Radicon Unit By New Packing And Seal Including Cost Of All ____ Material, Other Allied Work, Labour And T&P Etc. 1.29 Replacing / Refitling Gear Oil In Recdicon Unit After Cleaning ____- Including Cost Of All Material, Labour And T&? Etc. 1.30 Repairing Of Starter 3.5 Hp To 7.5 Hp With Disassembling Or Damaged Wornout / Damaged Component By Replacing New Components With Proper Cleaning And Checking Including Cost Of All Material, Labour And T&P Etc After Dlfggg3ec-Psj F Mriezj3 1.31 Repairing Of Tip Switch 63 Amp. To 100 Amp With Disassembling Or Damaged Womout / Damaged Component By Replacing New Components With Proper Cleaing And Checking Including Cost Of All Material, Labour And T&P _-_- Etc After Deducting The Cost Of Old Damaged Material 1.32 Opening Plumber Block And Tack Out Damaged Bearing From Gear Shaft And Refitting By New Beading With Proper Greasing Mnd Nut Bolt Of Plumber Block Including Cost Of All Material, Labour Mnd T&P Etc After Deducting The Cost ____ Of All Damaged Nnterial. ( Bearing No 22208 C ) 1.33 Opening Plumber Block Mnd Tack Out Damaged Bearing From Gear Shaft And Refitting By New Bearing With Proper Greasing Mnd Nut Bolt Of Plumber Block Including Cost Of All Material, Labour Mnd T&P Etc After Deducting The Cost ____ Of All Damaged Material. ( Bearing No 22211 B ) 1.34 Opening Plumber Block And Tack Out Damaged Bearing From Gear Shaft And Refitting By New Bearing With Proper Greasing And Nut Bolt Of Plnmber Block Including Cost Of All Material, Labour Mnd T&P Etc After Deducting The Cost Of All Dama2ednnterial. ( Bearinqno 22218 B 1.35 Rewinding Of 3Hp 3 Phase Electric Motor With Isi Super Eramled Copper Wire Varnishing, And Heating Incfr!Frig Cost Of Material, Labour And T&P Etc. Exclu Ecosi ______ Of Brunt Copper Wire. 1.36 Greasing Of Rollers Of Gate After Cleaning, Lacing, Grease Nipple As Required Including All Cost O Labour. ____ Material And T&P Etc. 1.37 Repairing Or Radacon & Hand Drive Unit With Gears _____ Includnng All Cost Of Labour, Materal And T&P Etc 1.38 Dissembling The Latching And Delatching System Of Central Drive Unit Of Hoist Machine From Its Foundation And Its Parts, Replacing The New G.M. Segment And Key To Make Locking System Assembling All The Component After Proper Lubrecation Mnd Greasing Fitting Latching And Delatching System On Its Foundation I / C. All Cost Of _____ Material, Labour And T&P Etc.Afte Deducted The Cost Of 1.39 Replacing Damaged Steel Wire Rope By Providing New Steel Wire Rope By Lifting Mnd Restng In Proper Position Of Gates With Chain Pully Block After Rsplacing The Steel Wire Rope Mnd Fitting In Proper Position Including All Cost Of Material, Labour Mnd T&P After Deducting The Cost Of Old ______ Damaged Material