| 1 | 10 | Dismantling of LPG Spheres (3 Nos. weighing Approximately 465 MT each, 17000mm ID X 49mm thk, Matl: SA516 Gr 70 plates), Bullet (1 No. weighing approximately 23 MT, 3000mm ID X 24 mm thk, Matl: SA516 Gr 70 Plates) with conventional thermal cutting method, at all elevations, as per the Specifications including shifting , weighing, and stacking of generated materials at the designated place identified by Owner / Consultant, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge. The breif detail of Spheres and the Bullet to be dismantled can be infered from the attached Drawing / document. The tentative quantam of Dismantling work can also be inferred from the attached document. However, Bidder to have a Site Visit and appraise themselves of the complete Scope of Dismantling and Associated works covered in this Tender. The scope also includes Providing & Installation of requisite Barricading, Scaffolding, Mobilization of required Lifting Equipments (Crane/F15 crane/Trailor etc..). Dismantling needs to be carried out upto Ground Level. The spheres shall be cut into pieces, each of which will not weigh more than 3 MT. | NIL1 | 1418 | MT |
|---|
| 2 | 20 | Dismantling of Pumps with Motors and vessel in pump house-1 (44-PA-CF-115A/B, 44-PA-CF-116A/B and 44-VV-002) and Pump house-2 (44-PA-CF-124A/B) as per the Specifications including Shifting, Weighing at owners weigh bridge, and Stacking at the designated place identified by Owner / Consultant, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL2 | 7 | Nos |
|---|
| 3 | 30 | Dismantling of Pump House-1 ( 8.0m X 18.0m shelter) and Pump House-2 (4.5m x 9.0m shelter). Dismantling of all Structural Steel (Including Pump House Structure 1 & 2 associated Cross overs Platforms, Monorail, Handrails & Gratings) as per the Specifications including Shifting, Weighing at owners weigh bridge, and Stacking at the designated place identified by Owner / Consultant, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL3 | 30 | MT |
|---|
| 4 | 40 | Dismantling of GI sheet Roofing & Cladding in Pump House 1 & 2, as per the Specifications including Shifting and Stacking at the designated place identified by Owner / Consultant, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL4 | 300 | SQM |
|---|
| 5 | 50 | Dismantling of Structural Steel (walkway, plateform and interconnecting plateforms of Spheres, Ladder & Access Platforms for LPG Bullet), arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL5 | 85 | MT |
|---|
| 6 | 60 | Dismantling of all associated piping (pipes, Fittings, Valves & Instrument valves), arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL6 | 90 | MT |
|---|
| 7 | 70 | Dismantling of all associated Electrical & Instrumentation Cables and Fittings, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL7 | 620 | MTRS |
|---|
| 8 | 80 | Dismantling of miscellenous items like instruments, panels, drums and small pumps-2 nos in pump house-1 etc., arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL8 | 5 | NOS |
|---|
| 9 | 90 | Dismantling of concrete for above ground only, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects to the satisfaction of Engineer-in charge | NIL9 | 22 | CUM |
|---|
| 10 | 100 | Dismantling of concrete for above ground only by using dry cutting diamond blades, arranging all labours, supervisors, tools, tackles, consumables, scaffolding etc complete in all respects and to the satisfaction of Engineer-in charge.\nContractor needs to take approval of cutting plane from Engineer In Charge before dismantling. | NIL10 | 15 | SQM |
|---|