Maintenance And Operation For Manning Of E / M Installation At Air Force Station Amritsar , Manning And Operation Of Water Supply Installation At Khasa In 2 Shifts , Each Shift Shall Consist Of 8 Hours Duration ( 6:00 Am To 2:00 Pm And 2:00Pm To 10:00Pm Alongwith Required T&P And Ladders ) By Engaging One Fgm Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Includingsunday And Holidays ) , Complete All As Specified And Directed , Skilled Fgm ( Total 02 Shifts ) - 02 Nos , Manning And Operation For Maintenance To External Electrical Distribution Network At Khasa In 3 Shifts Round The Clock , Each Shift Shall Consist Of 8 Hours Duration ( 6:00 Am To 2:00 Pm , 2:00Pm To 10:00Pm And 10:00 Pm To 6:00 Am Alongwith Required T&P And Ladders ) By Engaging Required Staff One Electrician Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Including Sunday And Holidays ) , Complete All As Specified And Directed , Skilled Electrician ( Total 3 Shifts ) - 03 Nos , Manning And Operation Of Water Supply Installation At Muradpur In 2 Shifts , Each Shift Shall Consist Of 8 Hours Duration ( 6:00 Am To 2:00 Pm And 2:00Pm To 10:00Pm Alongwith Required T&P And Ladders ) By Engaging One Fgm Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Including Sunday And Holidays ) , Complete All As Specified And Directed , Skilled Fgm ( Total 02 Shifts ) - 02 Nos , Manning And Operation For Maintenance To External Electrical Distribution Network At Muradpur In 3 Shifts Round The Clock , Each Shift Shall Consist Of 8 Hours Duration ( 6:00 Am To 2:00 Pm , 2:00Pm To 10:00Pm And 10:00 Pm To 6:00 Am Alongwith Required T&P And Ladders ) By Engaging Required Staff One Electrician Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Including Sunday And Holidays ) Complete All As Specified And Directed , Skilled Electrician ( Total 3 Shifts ) - 03 Nos , Manning And Operation For Maintenance To External Electrical Distribution Network In Domestic And Technical Area At Amritsar In 3 Shifts Round The Clock , Each Shift Shall Consist Of 8 Hours Duration ( 6:00 Am To 2:00 Pm , 2:00Pm To 10:00Pm And 10:00 Pm To 6:00 Am Alongwith Required T&P And Ladders ) By Engaging Required Staff One Electrician Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Including Sunday And Holidays ) , Complete All As Specified And Directed , Skilled Electrician ( Total 3 Shifts ) - 03 Nos , Manning And Operation For Sewage Installation In Domestic Area Near Dsc Billet And Near Dhobi Ghat At Amritsar For Overall Smooth Functioning Of Installation In 1 Shifts , The Shift Shall Consist 8 Hours Duration 6:00 Am To 2:00Pm ( Alongwith Required T&P ) By Engaging Required Staff One Fgm Per Shift For Proper And Efficient Running And Satisfactory Performance Of Plant ( Including Sunday And Holidays ) , Complete All As Specified And Directed , Skilled Fgm ( Total 1 Shift ) - 01 Nos , Notes For Srl . No . 1 To 6 Including Sub Paras Here-In-Before:- ( I ) For Detail About Penalties , Qualifications Etc Please Refer Sch A Notes And Tender Documents . ( Ii ) The Rates Quoted In Column Of Minimum Wages Shall Not Be Less Than The Minimum Wages As Notified By The Goi / State Govt / Local Body , Whichever Is Higher Failing Which The Tender Shall Be Treated As Non-Bonafide . ( Iii ) The Contractor Shall Also Quote Rate / Percentage Against Epf , Esic , Bonus , Lwc , Gst And Oh&P In Respecive Column I . E , As Per Latest Instructions Of Concerned Department As On End Date Of Bid Submission . ( Iv ) The Bid Shall Be Treated As Non-Bonafide On Following Reasons:- ( A ) Quoting Nil / Zero Against Overhead & Profit Against Oh&P . ( B ) Quoting Less Than Minimum Wages As Notified By Concerned Authority . ( C ) Quoting Lwc Less Than 1% ( D ) Quoting Less / Nil Against Epf , Esic & Bonus W . R . T Same As Applicable According To Total Number Of Workmen / Wages As Per Instruction In Vogue . ( E ) This Work Prominently Involves Items Of Outsourcing Of Services . Therefore The Rate Of Gst Shall Be Considered As 18% While Quoting The Bid . , ( V ) The Reimbursement Of Contribution Amount Quoted By Bidder For Epf , Esic & Bonus Shall Be Reimbursed By The Ge ( The Principal Employer ) In Rar And Final Bill Only After Submission Of Valid And Authenticate Document In Support Of Proof Of Payment By The Contractor To The Concerned Workmen In Addition To Following Documents Failing Which Payment Against These Heads Shall Not Be Made:- ( A ) The Complete List Of Workmen Employed By Contractor On Commencement Of Work Furnishing Details Such As Name , Father Name , Address , Aadhar , Bank Account No . Shall Be Submitted . Such List Shall Also Form Part Of Rar / Final Bill . ( B ) In Case Of Epf , Statement Of Universal Account Number ( Uan ) Of Workmen Issued By Employees Provident Fund Organisation ( Epfo ) And The Same Shall Be Verified By Principal Employer ( Ge ) Either Directly From The Epfo Portal Or Insisting On A Payment Receipt Obtained By The Contractor From Epfo Portal While Depositing Contribution . ( C ) In Case Of Esic , The Detail Such As Employer Code , Insurance Number Of The Insured Workmen And Monthly Contribution Statement . ( D ) In Case Of Bonus , The Online Transaction Statement / Neft Slip With Details Of Workmen . ( Vi ) Rates Shall Be Quoted Only Upto Two Digits After Decimal . If Any Rate Quoted / Derived By Contractor Works Out To More Than Two Digits After Decimal , Then The Same Shall Be Rounded Off Upto Two Digits After Decimal . The Rounding Off Shall Be Done In Accordance With Rules For Rounding Off Of Numerical Values In Accordance With Is :02 Of 1960 ( Revised 2016 ) Of Bis , Note For Item No . 1 To 6 ( I ) The Contractor Shall Deploy Minimum 25% Manpower ( Tradesmen Only ) Iti Qualified With One Year Experience And Other Trained Tradesmen Having Minimum 3 Years Of Work Experience . ( Ii ) The Area Upto 25 Metre Around The Installation Shall Be Maintained By Cleaning Including Grass Cutting Etc All As Directed By Engineer-In-Charge . The Unit Rates Quoted By Contractor Shall Deem To Include This Aspect Also . Nothing Extra Shall Be Admissible On This Account . In Case Area Is Not Cleared By Contractor Around The Installation Recovery @Rs . 3300 / - Per Month / Per Installation Shall Be Made From Contractor . ( Iii ) The Unit Rates Quoted By The Contractor Shall Including Cleaning Of Pump Casing And Impeller Including Of Filling Glands ( Jam Dori ) To Avoid Leakage . ( Iv ) Contractor Shall Also Be Responsible For Proper Chlorination Of Water , Maintain Record Of Chlorination And Log Sheet And Collect The Chlorination Chemical And Dhpp ( N ) From The Mes Store ( Je E / M ) Well In Advance For Proper Operation .