Name of Work: Construction of LT line under NSC Head under EDSD Selaqui, Dehradun.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Cartage of following item from ESC Dehradun to main road site of work/JE store by truck with loading & unloading complete distance approx 21-50 km as below :-
2
1.1
ST Pole SP-10/21/23/33
1
No.
3
1.2
PCC Pole 8.5 mtr. Long
1
No.
4
1.3
Stock Material
1
Qtl
5
2
Manual shifting of following material from road side to pit site dist. Approx. 0 to 1 Km.:-
6
2.1
ST Pole SP-10
1
No.
7
2.2
ST Pole SP-21/23
1
No.
8
2.3
ST Pole SP-33
1
No.
9
2.4
PCC Pole 8.5 mtr. Long
1
No.
10
2.5
Stock Material
1
Qtl
11
3
Excavation of Foundation pit for erection of pole in all type of soil and fixing of all accessories of pole and rection of support and grouting of pole in CC ratio 1:4:8 block including cost of ballast, cement and sand, back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual.Single support (erection+grouting)
12
3.1
PCC Pole (without CC)
1
No.
13
3.2
SP-10 (with C.C.)
1
No.
14
3.3
SP-21/23 (with C.C.)
1
No.
15
3.4
SP-33 (with C.C.)
1
No.
16
4
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracking and special type bracket etc. as per RESPO schedule and local approved drawing.
1
Kg.
17
5
Fixing of special type bracket / Single pole accessories for composite main etc.
1
No.
18
6
Erection with digging of pits for Stay as per RESPO manual in all type of soil, grouting of Stay rod with Cc 1:4:8 cement block including cost of ballast, cement and sand, after grouting back filling of soil and boulders in the pit and ramming, nozzaling and fixing of Stay wire with Pole and stay rod as per drawing for :
19
6.1
LT line
1
No.
20
7
Erection and Earthing of support with M.S. Earth rod of 2.5 meter long including excavation of pit and digging of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual.
21
7.1
LT line
1
No.
22
8
Making of Section point in LT Line
1
No.
23
9
Route clearence by cutting of tree branches/lopping and chopping of tree for HT/LT line
1
Per tree
24
10
Laying, Spreading, Stringing and Sagging of L.T. lines of the following wire as phase wire of G.I. earth wire complete with binding and jumpering as per RESPo Specn.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.