Repair And Maintenance Of Intake Pump House And Corridor Road For The Year 2020-22 , Earthwork In Excavation Of Foundation Trenches Drains Including Dressing Of Sides & Ramming Of Bottoms , Lift Upto 1 . 5M Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil , As Directed , In All Types Of Soil Including Hard Soil . , Earthwork In Excavation Over Areas , Including Disposal Of Excavated Earth , Lead Upto 100 M And Lift Upto 1 . 5M Disposed Earth To Be Levelled And Neatly Dressed , In All Types Of Soil Including Hard Soil . , Making Channel In Sand/ Sandy Soil In Riverbed In Dry Or Wet Condition Or Within The Water Flow Including Removing The Sand For Directing The Flow , As Desired . , Supplying & Filling In Plinth & Wherever Required With Locally Available Sand , Watering , Ramming Complete As Per Instruction Of Manager-In-Charge . , Filling Available Excavated Earth ( Excluding Rock ) In Trenches , Plinth Sides Of Foundation Etc . In Layers Not Exceeding 20Cm In Depdth Consolidating Each Deposited Layer By Ramming And Watering Lead Upto 50M . & Lift Upto 1 . 50M . , Surface Dressing Of The Ground Including Removing , Vegetation & Inequalities Not Exceeding 15Cm Deep & Disposal Of Rubbish Lead Upto 50M & Lift Upto 1 . 5M In All Types Soil Etc . , Cleaning Grass & Removal Of The Rubbish Upto 100M Outside The Periphery Of The Area Cleaned Or Firing The Rubbish As Required By Cisf Personnel . , Cleaning Of Jungle Including Uprooting Of Rank Vegetation , Grass , Brush Wood , Trees & Sappling Etc . And Removal Of Rubbish Upto A Distance Of 50M Outside Of The Periphery Of The Area Cleaned , Including Cutting Of Trees Etc . In Road Side Berms . , Uprooting Of Small Trees & Roots From The Existing Bldg . / Structures/ Walls/ Drain/ Floor Etc . Including Partial Dismantling And Mending Good The Damages With Refilling Cement Concrete 1:3:6 With 10Mm & Down Size Chips , Plastering 1:4 & Finished Smooth . ( Measurement Shall Be Taken Up For Concrete & Plaster Separately For Payment ) . , Collecting Sand From River Bed & Filling Into Empty Cement Bags & Duly Tied Up . ( Capacity Of The Bag Should Not Be Less Than 1 Cft . ) For Dumping In River Bed For Diverting The Flow , Excluding The Cost Of Empty Cement Bags . Payment Shall Be Made As No Of Bag Basis ) , Cleaning Of Intake Chamber In Intake Pump House Which Is 16 . 5Mtr . Below Ground Level And Removal Of Slush/Silt/Sand/ Other Deposition Etc . & Taking Out The Same And Disposal Of The Same Within A Lead Of 50Mtr . Etc . Including Dewatering The Sumps With Supply Of Pump Sets & Other Tools & Plants , Safety Equipment Etc . Required For The Work . , Cleaning Of Open Masonry Drains & Culvert Etc . Including Removal Of Vegetation , Slush Soil , Garbages , Loose Stones & Earth Deposited & Disposal Of The Same Within 50 Mtr . , Cleaning Of Hume Pipe Culvert & In The River Nandira Including Removal Of Chockages ( Partly Or Fully ) Complete , As And When Required . , Removal Of Slush/ Deposits Of Ash & Depositing The Same At A Distance Of 50Mt . Properly Stacked . ( Measurement Will Be Taken As Per Stack Measurement ) , Cleaning & Sweeping Of Floor Including Necessary Removal Of The Garbage To The Area Within A Lead Of 50Mtrs . As Per Instruction Of Mic . , Cutting Of Felling Trees/ Branching Of Trees & Removal Of Debries To The Area Within A Lead Of 50M As Per Instruction Of Mic . , Providing & Laying Of Pcc 1:2:4 Using 20Mm & Down Aggregates At Any Level , In Proportion , Cement Coarse Sand: Stone Aggregates As Mentioned Below Excluding Centring & Shuttering , Cement Etc . , Providing & Laying Of Pcc 1:3:6 Using 20Mm & Down Aggregates At Any Level , In Proportion , Cement Coarse Sand: Stone Aggregates As Mentioned Below Excluding Centring & Shuttering , Cement Etc . , Providing & Laying Of Reinforced Cement Concrete Work 1:1 . 5:3 ( 1 Cement : 1 . 5 Coarse Sand :3 Stone Aggregate 20Mm Nominal Size ) In Raft , Footing , Base Of Columns , Chajja , Roof Slab Etc . Excluding The Cost Of Centering & Shuttering , Cement & Reinforcement Steel Etc . , Transporting From Nalcos Store & Fixing In Position Iron/ Wooden Door , Windows Ventilators , Gates Etc . Complete . ( Concrete & Plastering Shall Be Paid Separately ) , Providing And Placing In Position Tor Steel Reinforcement For Rcc Work Including Straightening , Cutting , Bending To Required Shape , Binding With Contractors Own Binding Wires With Proper Cover Blocks , Supports , Chairs , Spacers Etc . At All Depth And Heights Including Transportation , Loading And Unloading Etc . All Complete As Per Specification And Direction Of Mic . , Brickwork Using Fly Ash Brick In Foundation And Plinth For Making Chambers Etc On Any Floor In Cm 1:6 ( 1 Cement :6 Coarse Sand ) Complete Including Curing Etc As Directed By M-I-C ( Cement And Fly Ash Brick Will Be Provided By Nalco Free Of Cost At Its Main Store And Brick Manufacturing Unit ) , Brickwork Using Fly Ash Brick In Superstructure In Cm 1:6 ( 1 Cement :6 Coarse Sand ) Complete Including Curing Etc As Directed By M-I-C ( Cement And Fly Ash Brick Will Be Provided By Nalco Free Of Cost At Its Main Store And Brick Manufacturing Unit ) , Providing Cement Plaster 1:6 ( 12Mm Thick ) In Coarse Sand With Cement Mortar At All Elevation Including Supply Of All Labour Scafolding Materials Etc . For Repair & New Works Excluding Cost Of Cement Complete . , Providing Cement Plaster 1:6 ( 15Mm Thick ) In Coarse Sand With Cement Mortar At All Elevation Including Supply Of All Labour Scafolding Materials Etc . For Repair & New Works Excluding Cost Of Cement Complete . , Providing Neat Cement Punning Etc . Complete For All Heights . , Providing Cement Concrete Flooring 1:2:4 Finished With A Floating Coat Of Neat Cement Punning , Rounding Of Edges & Strips , Glass Strips Etc . Excluding Cost Of Cement Complete For 40 Mm Thick With 20Mm Nominal Size Chips . , Providing Rr Stone Masonry In Cm 1:6 Using Hard Stone Boulder In Foundation & Plinth Superstructures Whereever Required Including Scafolding Etc . Complete Excluding Cost Of Cement , Including Levelling Course In C . C 1:6:12 . , Flush Pointing With 1:3 Cement Mortar Over Stone Pitching/ Brick Work , Providing Coping On Top Of Compound Wall With C . C 1:2:4 With 10Mm Nominal Size Granite Chips , Thickness 50Mm , With Inserting Of Broken Glass Pieces Etc . Complete , Excluding Cost Of Cement As Per Instruction Of Mic . , 52 Mm Thick Concrete Flooring With Concrete Hardner Topping Under Layer 40Mm Thick Concrete 1:2:4 ( 1 Cement :2 Coarse Sand :4 Graded Stone 20Mm Nominal Size ) And Top Layer 12Mm Thick Cement Hardner Compound Consisting Of Mix 1:2 ( 1 Cement Hardner Mix :2 Stone Aggregate 6Mm Nominal Size ) By Volume Hardening Compound Mixed At 2 Lt Per 50 Kg Of Cement Or As Per Manufacturer Instruction ) By Volume Including Cement Slurry Rounding Of Edges & Strips Etc . , Dismantling And Disposal Of Brickwork Within 100M Lead Including Stacking And Cleaning The Area All Complete . , Dismantling And Disposal Of Plain Cement Concrete Within 100M Lead Including Stacking And Cleaning The Area All Complete . , Dismantling And Disposal Of Reinforced Cement Concrete Within 100M Lead Including Stacking And Cleaning The Area All Complete . , Extra For Cutting Of Reinforcement Bars In Rcc Works ( Payment Shall Be Made On The Cross Sectional Area Of Rcc Wall ) As Directed By M-I-C , Dismatling Of Plaster Including Raking Out Joints , Removing Of Old